SPECIAL MEETING AGENDA                                                             1 DECEMBER 2021



b)    Cell 1.1 Capping (FY22/23)
      •     Design and construction of Cell 1.1 final capping layer, using imported clay or
            combination of geomembrane liners, [Green] (design change)

Figure 1. Works locality plan




3.    Construction Scope
The construction tender for the Noosaville Landfill – Cell Expansion and Cell 1.1 Capping works is
the combination of the two (2) abovementioned Cell expansion and Cell capping capital projects.
The projects were packaged together and spread across multiple financial years for delivery due to
their similarity in construction resources (speciality contractors, equipment, and materials) and
overlapping site management requirements. In general, the scope of the construction works include:
a)    Cell 1.1 & 2.2 Expansion (FY20/21)
      •     establishment and management of construction and environmental controls
      •     construction of new SW5 clean water and dirty water drains
      •     construction of new SW5 HES Basin
      •     construction of cell perimeter haul road
      •     all works for the expansion of Cells 1.1 & 2.2 (completed by speciality civil and liner
            contractor)

b)    Cell 1.1 Capping (FY22/23)
      •     establishment and management of construction and environmental controls
      •     construction of new clean water and dirty water batter drains
      •     all works for the construction of Cell 1.1 final capping layer (completed by speciality civil
            and liner contractor)
Early work has been coordinated by Council independent of the construction contractor in
preparation for the main construction works to compress the overall delivery program. These works
included demolition of existing structures, vegetation clearing, relocation of operational stockpiles

                                                                                           Page 5 of 18
Log in to download the original file

2021-12-01 Special Meeting Agenda(PDF, 1MB).pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.