Original source · versioned page text
Appendix B - Existing Approval Documents
Very large file: it may take a few minutes
The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Timber Lattice
—— Metal
“| Weatherhoods
Corrugated Steel
Roofing
ff.1.Level 2
| OO$4 SHIRE COUNCIL
TES #LAN Alb sPicterGaTuevel it an ARE
as ae REC ate
WEST ELEVATION -
Units 2&3
Timber Boarding
Bauwstardina- Te
i
|+—— Galvanized Steel
tube Frame (oepees
EAST ELEVATION
Timber Battens
Sunshading
ECUIREMENTS OF THE SUILDING AGT 1975, =
By NOARD BUILDING BY-LAW 1275, SGUMRi-g
Uni Ee ie RSSAND ANY CONDITIONS si oN
t VED PLANS AND BUILDING FEANMIT
UNDER NO CIRCUMSTANCES May
SPECIFICATIONS BE berace ee
WRITTEN APPHOVAL Of THE S
OE
ILDING SURVEYOR
ee
TH
DATED™,
Pare we: Bylaw.
ff.l Level 2
SHOWN ON THE
BUILOING PERMIT No, Mees
se
——+— Bagged Concrete
Broewwork ff.1 Level 1
. WEST ELEVATION - Unit 1 EAST ELEVATION - Unit 1
Un
| Proi a - _ STAGES Drawing: Architects
_[ Scale: "Revision Details | By 3 SUELLTAG UNITS 2 oe _ SIMON REED Suite 19 Tewantin Plaza ip:
© 131007 ‘at: Lake Street. Teventin | WORKING [~ | ELEWaTIoNS ~ Tewantin-Q1d. 4565.
13100 at: Lake Stran ewantin | - Rave re Copa b aoe ee
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.