ZERO EMISSIONS NOOSA (ZEN) Inc. ALLIANCE AGREEMENT · Attachment 7 ZEN Inc. Alliance Agreement Annual Report 2025
ATTACHMENT 7 0 NOOSA ZERO EMISSIONS Zero Emissions Noosa Inc. Partnership Alliance Agreement Operational Report to Council for 2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 7 ZEN Inc. Alliance Agreement Annual Report 2025.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 60 pages
Page 2
Zero Emissions Noosa Inc. Partnership Alliance Agreement
Operational Report to Council for 2025
1. Leveraging from Council $ Invested in ZEN Inc*.
For every $ invested in ZEN Inc. by Noosa Council, ZEN Inc., returns $24.3 dollars to the
Noosa Shire & the Noosa Community.**
*Funding calculated as a total of funded projects compared with Council approved project funding.
** Based on an av. value of ZEN Inc volunteers at $120 per hour, way below market rate for much of its
2
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 3
project work.
Not only is this a massive contribution to the Noosa community, but it enables Council to leverage
massively from the volunteer work done by ZEN Inc., in addition to contributing to emissions reduction and
mitigation of climate change impact in the Noosa Shire community. Refer to Appendix A & B & C.
2. How ZEN Helps Council to Implement It’s Key Plans
Zero Emissions Noosa Inc (ZEN Inc.) is an award-winning organisation at the forefront of low emissions
community energy and transport solutions, as both a regional influencer and, as assessed by others, a
model for other community energy groups to follow.
ZEN Inc. is the community energy and transport group assisting Council to implement key Council plans
across the Noosa Shire Community, including the Corporate Plan across the following themes:
How? ZEN Inc’s is “adding value” to Noosa Council & Noosa Community
Helping Council to implement key plans:
Corporate Plan Relevant Associated Plans to ZEN E & ZENTAG Action Plans
theme
1. Environment ● Noosa Environment Strategy 2019 (Sustainable living & Climate change adaptation
and resilience)
● Climate Change Response Plan 2021 (all 8 themes)
● Noosa Transport Strategy 2017 - 2027 (development of a new movement
and connectivity strategy).
2. Liveability ● Noosa Transport Strategy 2017 - 2027 - development of a new movement
and connectivity strategy
● Cycling and Walking Strategy and Implementation Plan 2020
● Noosa Trails Masterplan and Implementation Plan 2020 (use of completed plan).
● Noosa Housing Strategy 2022 (Energy efficiency cost savings & emissions reduction)
● Noosa Social Strategy and Social Justice Charter – Community Strategy (Energy
efficiency cost savings & emissions reduction)
● Noosa Health and Wellbeing Plan & Implementation (through pillars of the Corporate
Plan)
3. Excellence ● Community Engagement Framework (through Community batteries,
Electrify Everything & Transport forums/workshops)
● Economic Development Strategy 2021 – Smart Biosphere (through Community
4. Prosperity batteries, Electrify Everything & Transport projects)
● Waste to Resource Strategy 2023-2028 (renewable energy)
● Community Strategy – as above.
● Climate Change Response Plan – as above
● Noosa Design Principles (Sustainable Passive Design for energy efficiency)
5. Future ● Disaster Management Plan (use of renewable energy)
● Local Disaster Recovery Plan (use of renewable energy
● Destination Management Plan (transport alternatives & emissions reduction strategy)
● Economic Development Strategy (through Save Energy, Save Money for
Business, Community batteries, Electrify Everything & Transport projects)
● Waste to Resource Strategy 2023-2028 (renewable energy)
3
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 4
with the Climate Change Response Plan being the key driver for ZEN Inc’s work.
ZEN Inc. has a close and collaborative relationship with Noosa Council and is helping Council to step up
as a leader in the emissions reduction space.
It is governed by a Board of 7 people, and a number of advisors, who oversee three Working Groups:
➢ ZEN E (Energy),
➢ ZENTAG (Transport) &
➢ Expo Working Group.
The board’s work is supported in it’s operations by three sub-committees:
⮚ Governance & Operations (G&O)
⮚ Finance & Fundraising and (F&FR)
⮚ Communications & Advocacy (C&A).
A Public Fund Account Committee oversees Tax Deductible donations. See Appendix D for ZEN Inc’s
Organisational Chart.
3. Who ZEN Inc. Collaborates with
a. Collaborations
ZEN Inc. collaborates with many key stakeholders and community groups that share ZEN Inc’s Visions,
Mission & Values, to help us achieve our shared objectives.
b. MOU’s
ZEN Inc. has an MOU with organisations that are helping us to achieve our vision and mission.
4
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 5
c. Memberships
ZEN Inc. is a member of a number of like-minded organisations that help us to work towards our goals
and objectives.
4. Current ZEN Inc. Strategic plan and 2025-2026 & Action Plans
ZEN Inc. reviews it’s strategic plan annually in August. Following a complete review of the strategic plan
in August 2023, (in place until 2026), a review of the ZEN E & ZENTAG Action Plans were undertaken in
August 2025. The Expo Working Group Workplan was reviewed in Nov., 2025, once the decision to go
ahead with a 8th EV & Electrify Expo was made. See Appendix D.
ZEN Inc’s. two key objectives are to:
Goal 1: Goal 2:
Promoting community actions to To be a sustainable organisation.
achieve net zero emissions. To fulfill its vision and mission, ZEN Inc
We provide leadership and management must be a well-resourced and efficient
of projects, advocacy, education and organisation.
community engagement that help the
Noosa community on its journey towards
net zero emissions (our core business)
Objectives
The objectives to achieve these goals are outlined in Appendix D, along with their associated Outcomes/
Measures of Success.
Strategies
The key priorities and higher-level elements identified through our SWOT analysis have
informed our strategies. The strategies inform the ZEN E and ZEN TAG action plans, the
Expo Workplan and the activities of our three sub-committees.
The 2024-2025 ZEN Inc Operational Plan is in fact the Action Plans for the ZEN E (Energy) Group and
ZENTAG (Transport) Working Groups and the Expo Workplan. All groups undertake projects, some of
them at the cutting edge of community energy and transport.
5
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 6
ZEN E (Energy) Group, ZENTAG (Transport) Group Action Plans & Expo Working Group Workplan
Attached as Appendices E, F & G are the action plans for ZEN Inc’s three Working Groups, where
project work is carried out.
5. Significant ZEN Inc. Projects/Initiatives
ZEN Inc. is a regional influencer and change agent for the Noosa Community assisting them to move
towards the goal of net zero greenhouse gases. In 2025, we made significant progress with projects and
Noosa Shire community engagement on this journey. Many ZEN Inc. projects are cutting edge,
groundbreaking and future focused renewable energy and transport projects, leading the way in
Queensland and in many cases nationally. Some of our flagship projects include:
1. 2025 7th Annual Electric Vehicle & Electrify Everything Expo
6.000 visitors came to see and engage with the 65+ exhibitors
To learn about the benefits of electrifying their home or business and driving an EV t
To save on their energy bills, while helping to reduce their carbon footprint.
Some of the experiences we had on offer…
● 35 of the latest EV’s and trucks, plus e-bikes, scooters and motorbikes
● the latest in battery/charger/heating & cooling and solar power solutions
● One-on-one chats with The Electric Viking and Zero Emissions Noosa’s own
Energy Champions
● A special trial ride area for e-bike and scooter test rides
● Live induction cooking demos with the amazing Matt Golinski
● The launch of the Noosa EV Bike Library with Mayor Frank Wilkie
Impact: A sample of the survey results highlighted:
● 56% - attendees were new to the Expo
● 79% - Expo helped shape their home electrification plans
● 56% - Expo visitors will or may purchase an EV in the next 12 months
● 40% - attendees came to Noosa for the Expo
● 95% - attendees said it was excellent or very good.
Thanks to Noosa Council for their continued partnership support through financial and
knowledge assistance for the Expo. For further details, see the ZEN Inc. 2025 Annual
Report.
6
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 7
2. Saving Energy, Save Money for Businesses
A Council Climate Change Grant enabled ZEN Inc. to contract a Business Energy Advisor
To work with businesses, offering practical advice on how to implement energy savings
for SME’s across the Shire.
This free and independent service has been helping Noosa Shire businesses to save
thousands of dollars.
The free service includes
● Identifying quick energy efficiency wins to cut bills.
● Assessing the business case including ROI for solar PV or batteries, including
available grants, rebates and industry trends and
● Exploring ROI for electric vehicles (EVs) and chargers for staff or
customers.
Impact: ROI analysis: ROI is strong vs budget. $ Value.
Actual + Pipeline Yr 1 Yr 10
$ savings $76,645 $766,450
BEA project R.O.I. 4.8 47.9
Emissions avoided (tCO2e) 304.5 3045.2
For further details, see the ZEN Inc. 2025 Annual Report.
Thanks to Noosa Council for its support through a Climate Change Grant. For further details,
see the ZEN Inc. 2025 Annual Report
3. Low Income Homes Project
● ZEN Inc., supported by Noosa Council grant, successfully delivered a pioneering
solar and social initiative
● Helping reduce energy costs for some of the region’s most vulnerable households.
● An excellent example of ZEN Inc’s mission in action: driving practical solutions that
lower emissions while supporting the community and aligning with Noosa Councils
net zero emissions goals.
● ZEN Inc. is proud to have delivered tangible, long-term impact for some residents
who need it most
7
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 8
Impact: 10 households who could not afford the upfront cost of solar installation now have
free solar rooftop systems in place—cutting their electricity bills year-round and easing
financial pressure.
Thanks to Noosa Council for its support through a Climate Change Grant. For further details,
see the ZEN Inc. 2025 Annual Report.
4. E Bike Library
• The ZEN Inc. E Bike Library, was officially launched at the Expo.
• A brand new ZEN Inc. community initiative designed to make clean transport
adoption easier – the ONLY E Bike Library in Qld.
• Response has been very positive. Many people have trialled an e-bike in for
up to two weeks — for commuting, errands, or just exploring Noosa in an
eco-friendly way.
• The Library giving locals, from children to those in their 80’s, the chance to
try before they buy
• Is helping reduce reliance on cars, ease congestion, and cut emissions
• Promoting healthy, active lifestyles. For further details, see the ZEN Inc. 2025
Annual Report.
Impact: 49 families have tried E bikes to assist in them making a purchasing decision and
helping to reduce traffic congestion.
Funded by Qld. Dept. of Transport & Main Roads
5. Rewiring Noosa – Electrify Everything
8
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 9
• ZEN Inc. was an original community partner. chosen to work with Dr Saul
Griffith’s Rewiring Aust. Project, for the Noosa Shire community.
• A 2025 highlight was securing Dr Saul Griffith to visit as part of
his Fairer, Faster Tour, promoting his latest book Plug In: The
Electrification Handbook.
• 250 people attended the ZEN Inc. community Forum – “An evening with Dr
Saul Griffith” at Sunshine Beach Surf Club,
• Forum helped answer participants questions about the energy transition
• ZEN Inc. promoted our Rewiring Noosa Toolkit developed for us by
Rewiring Australia.
• The Toolkit, including 7 videos, shows how the Noosa Shire
community can manage their energy use, be more energy efficient,
coupled with solar, batteries and monitoring systems.
• These tools are help Noosa Shire community members (homeowners and
renters alike) save money, AND reduce their carbon footprint.
Impact: 11 community forums in 2025, highlighted how to Electrify Everything, have helped
people learn how they reduce their energy use, save money on their energy bills and reduce
their carbon footprint on the journey towards net zero emissions for the Noosa Shire
community.
Thanks to Noosa Council for it's support for this event.
6. Energy Management - MOU with Energy Flex
• ZEN’s MOU with Noosa Shire business EnergyFlex, provides a FREE service
to helps Noosa households and SME’s understand and manage their energy
use
• Provides practical ways to cut costs and reduce emissions.
• Seeing energy use helps behaviour change e.g. running home appliances
when the sun is shining or for SME’s scheduling energy-intensive tasks,
equipment operation or refrigeration cycles with high solar generation or
lower-cost grid energy.
• Saving energy doesn’t mean going without. With the Energy Flex app,
homes or workplaces can become more energy efficient - simply and easily.
• Even small improvements in how and when you use energy can deliver real
9
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 10
savings for your home and your business.
Disclaimer: While ZEN Inc. receives a small fee when clients sign up via the ZEN
Inc. portal, ZEN Inc. decided to collaborate with Energy Flex as it is a free app that
helps Noosa homes and businesses to make savings on their energy bills and helps
reduce their emissions as a result of behaviour change.
Impact: Savings will vary, however typical savings range from $500 - $700 a year or more. 23
people signed up in the first full month of operation.
7. Noosaville Community Battery
• ZEN Inc’s 5 years of groundbreaking work, including commissioning a
Business Plan for a Network of Community Batteries in the Noosa Local
Government Area, led to a consortium (ZEN Inc., Yarra Energy Foundation,
and Noosa Council), for the $500,000 federally funded community battery in
Noosaville.
• ZEN Inc. was key to negotiating a sponsorship agreement between by
Energex and Noosa Council and Yarra Energy Foundation (YEF) in 2024,
• Energex adopted the Noosaville Community Battery as “pilot”, i.e. Energex
now covers the tariffs for 5 years – saving Noosa Ratepayers $, while future
financial viability is investigated.
• In 2025, ZEN Inc. conducted further community consultation for Yarra Energy
Foundation (YEF) and Noosa Council. Residents in the Noosa Bushlands
Community were updated about the progress of the community battery
installation. For further detail see the ZEN Inc. 2025 Annual Report.
Impact: 70 households in the Noosa Bushlands Estate will be able to draw their evening
energy use from the battery instead of buying fossil fuel generated energy.
10
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 11
Possible projects under investigation by ZEN E Working Group:
1. Race to 2030
2. Committee for 2032 - Olympics Regenerative Tourism (solar for Tourism
accommodation)
3. Community Power Network (CPN)
Possible or Extension of projects/Issues under investigation by ZENTAG
Working Group
2. Go Car Free Day
3. School engagement (e.g. active transport, ZENDURO)
4. E Bike Safety with Sandy Bolton, MP for Noosa
5. E-bike tours
6. Advocacy with SCBUG on relevant issues.
All our projects and activities are outlined in detail in our Annual Report.
ZEN Inc. really appreciates Noosa Council, Federal and Queensland Government funding. Expo donors
and sponsors also greatly assist our work. We have a collaborative working relationship with a number of
key stakeholders, especially Noosa Council, Yarra Energy Foundation (YEF), Tourism Noosa and Noosa
Junction Assoc., Noosa Biosphere Reserve Foundation (NBRF) and Energy Qld. to name a few. We thank
them all for their support.
7. How Alliance Partnership Funding has Assisted ZEN Inc
The Council Alliance Partnership Funding is the enabler that has allowed ZEN Inc. to have a:
a. Program/Project Manager (incl. Expo) - Rex Halverson, from Jan. 01, 2025 to Dec. 31,
2025, for 19 hours per week
b. Secretariat/Administration Officer - Rex Halverson from Jan. – Aug. 2025 and then from
Sept., - Dec. 2025, by Amy Butler, who is still in the role for 10 hours per week.
c. Marketing & Communications package (for 9 months only) - SAGE Lite was the least
expensive monthly PR & Marketing package that ZEN Inc. could afford. Volunteers and the
Program/Project manager still contributed significant time to PR & Marketing (newsletters
(full or part development), writing print media and many social media posts, including for
the EV & Electrify Everything Expo and minor website updating.
d. Website Upgrade - start of this process only.
e. Admin. Expenses.
See amounts itemised in table below.
11
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 12
A. How Alliance funding has Helped ZEN Inc.
Running ZEN Inc. is like running a small business. These paid roles are crucial in assisting volunteers with
of ZEN Inc’s. programs/projects and the internal organisation and operations by:
i. It is now necessary to pay people to do roles that have previously been done by
volunteers e.g. the ZEN Inc. project manager role for the Expo, and assistance with
communications and marketing.
ii. Getting dedicated volunteers to commit the hours required for ZEN Inc. to function
as an organisation, as well as to do project work, is getting very difficult (as it is for
many organisations).
Following the Alliance Partnership Funds being raised to $125,000 per year for years 2 & 3 of the
agreement from July, 2024, this enabled ZEN Inc. to:
iii. these paid roles have helped take the majority of admin. work and some project
work from the volunteer ZEN Inc. Chair, (who still works as the volunteer CEO for
40 – 50 hours per week) and the Treasurer (who also works 30+hours per week in
the Treasury role) to lead projects and prevent volunteer “burn out”.
iv. Provide ongoing staffing support compared with the need to reply for funding every
year and having an “on again, off again” staffing model, that interrupted project
implementation.
v. This additional funding will supplement what we currently have to assist ZEN Inc. to
continue to do what we do including:
1. Large projects
2. Community Engagement
3. Community Education and Awareness Raising
4. Policy development & advocacy and
5. Work with Stakeholders that:
assists Council to implement the Climate Change Response Plan & many other plans through behaviour
change to help move the Noosa Shire Community closer to net zero greenhouse emissions.
B. Practical Funding Challenges
The 4 – 5 month time lag in receiving Alliance Partnership Funds in Years 2 & 3 (July 2023-2024 &
2024 – 2025 financial years) when it was received in mid to late Oct. in 2024 & 2025, means:
i. ZEN Inc. had to fund the above roles by juggling expenditure out of yet to be spent grant funding
from other grants and then reimbursing them, and/or using reserves from previous Expos.
earmarked for the next Expo if sponsorships/exhibitor fees/donations were ess than budgeted
expenses.
ii. It gives the illusion of substantial funds at bank at the end of a calendar year (also the end of
ZEN Inc. financial year), when in fact it was funds meant for the previous 6 months.
iii. This funds the majority of funding for the following calendar year, i.e. in 2025, funding for
Alliance Partnership Funds Year 2 was used to close to the end of the 2025 calendar year,
12
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 13
when we started to spend frorn Alliance funds Year 3. We should have been spending from
Alliance Partnership Funds Year 3 funding from 01 July, 2025 if funding had been received
by then.
iv. Having Marketing assistance for 12 hours per month was to enable the ZEN Chair to spend
more time working at the strategic level to develop collaborative relationships and be involved
developing in strategically important projects. However, this has been less than expected as
website rebuild costs have been more than expected. Hours earmarked for Marketing and PR
had to be used for the website rebuild. The ZEN Inc. chair had to resume newsletters and
other jobs. Some marketing of events & social media had to be done by volunteers who do not
have the same expertise as a professional marketing person.
Alliance Funding Role Funded
Year 2:
$55,436.03 Program/Project Manager @ 19 Hours per week
See notes below This included:
Expo Coordination (full time 19 hours per week) for 6 months & part/time 5
hours per week for 3 months + support for current ZEN Inc. projects – Electrify
Everything, E Bike Library, Business: Save Energy, Save Money; Go Car Free; Solar
for Strata & Data Measurement, EV Charger project, Transport Advocacy
& if funded Electrify Communities; Low Income Homes; Behind the Meter (BTM)
Battery project; Race for 2030; ZENDURO; Walking & Cycling initiatives with
Schools.
This role supports project leaders (ZEN Inc. volunteers) to keep the projects
running and enable the projects to continue to support a greater transition to
renewables and reduced emissions in Noosa Shire.
ZEN Inc. has had to move to a paid Expo Coordination role, as no volunteers will
undertake this role any more due to the intensive and extensive nature of the
role, as well as doing other project and committee work for ZEN Inc.
This role includes:
Supporting ZEN Inc. and it’s members and volunteers, via an agreed workplan, to
undertake it’s cutting edge projects by taking a high-level view of ZEN Inc’s
program, and strategically guiding project leaders to ensure they are all working
effectively toward the programs’ objective, including:
a. Ensuring that projects are in line with the stated goals of their
organization
b. Ensuring ZEN Inc. projects are delivered on time and within budget by
assisting project leaders with monitoring, budgeting and timely grant
acquittal
c. Providing quality control, monitoring and coordinating of ZEN Inc’s
project work for maximum impact
d. Monitoring activities, organization, and costs of an event and working
with the project leaders to modify them as necessary
e. Advising and overseeing project budgets, volunteer project leaders,
activities, and intended final products
f. Being the ZEN Inc. Expo coordinator
13
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 14
g. Working with everyone from volunteers to management, conveying
information to people who are may not be specifically trained in a task,
as ZEN Inc is a non-profit organization
h. Being present face to face for meetings as required, otherwise on line.
This also enables ZEN Inc. volunteers, including the Chair and Treasurer to seek
more funding sources at a strategic level, build further collaborative
relationships with key stakeholders & free up our Chair & volunteers time to
work on projects.
Rex Halverson Administrator/Secretariat @ 10 Hours per week
$12,146.04 Jan. to Sept. ZEN Inc. needs paid help to be able to fulfill our compliance obligations with the
2025; then ACNC & Qld. Office of Fair Trading.
Amy Butler $4,152.75 = As there are no volunteers who want to do this role, ZEN Inc. (like many other
$16,298.79 NFP’s on the area) has to pay someone to carry out this role. While in the past it
was very difficult to get a person with the skills and experience needed at the
rate we are paying, we were very fortunate that Rex Halverson agreed to do this
role as well as the project manager role from Jan. – Aug., 2025.
Total Wages = This role supports ZEN Inc. and it’s members and volunteers, via an agreed
workplan, to undertake it’s cutting-edge projects by supporting the Board and
$71,734.79 sub-committees in the Secretariat role and in day- to- day administration of the
organisation. This includes:
● Preparation of board agendas, taking minutes at Board meetings
● Assisting ZEN Inc’s work by supporting:
a. the Board through follow up actions, including admin. for the AGM
and Board
member recruitment
b. administration of the organisation to comply with the governance
and legal requirements.
c. the sub-committees – doing meeting notes for:
i. Governance & Operations e.g. development of an on-line
Operations manual, & updating shared e files
ii. Finance and Fundraising e.g. Admin. for financial monitoring of
projects
and keeping the grants register & records
iii. Comms. & Advocacy e.g. assisting with preparation of the
Annual Report.
● Servicing membership and updating the Membership register
● Following up queries from the public about ZEN Inc. and it’s work.
Late in 2025, we were very fortunate to secure the services of Amy Butler, who is
skilled and experienced in these roles with a Not for Profit group.
$8,601.70 Employee on Costs - Super
Program/Project Manager @ 19 Hours per week
$6,482.26
Administrator/Secretariat @ 10 Hours per week
Rex super $1,420.26 (Jan. to Sept. 2025)
Amy super $498.33 (Sept., 2025 to Dec., 2025)
Workcover $200.86
14
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 15
$17,150 (ex-GST) Communications Package
Having funding in 2024-2025 to start working with a professional PR & Marketing
company has greatly assisted ZEN Inc. to boost it it’s reach to drive greater
community engagement & behaviour change. They are key to the Noosa
Community making the transition to net zero.
Some additional funding for our Comms. package has enabled ZEN Inc. to engage
our professional marketing person for more hours per month to help us better
engage with our audience and get more people to ACT (change their behaviour)
to be part of transition to renewable energy and e transport.
Implementing a more strategic marketing plan for greater community
engagement with all projects to have greater community action.
It has also helped to broaden our demographic as part of our community
outreach.
This service to ZEN Inc. role includes:
- Some social media
- EDM’s
- Project campaigns e.g. Car Free Day & Business – Save Money,
Save Energy
$3,740 Website Rebuild (a small part only)
$3,005.13 Admin. Expenses incl. $ 936.38 general admin. expenses; $2,150 bookkeeper
& auditor;
$7,732.65 Grant Assoc Expenses (other than SAGE & Website design), ie Ethical Jobs
adverts, Squarespace, The Creative Frog, Chamber of Commerce events,
Xero, Noosa Graphica, Otter AI, Tourism Noosa events, Org T Shirts, HR,
Media, printing, etc.
$111,964 excl. GST actual Alliance Funding was $125,000
spent in 2025 +
$13,035 spent in
2024
Total $124,999
8. Utilisation of 2025 Funding/Projects & Status/Time frames
All but one of ZEN Inc’s funded projects in 2025 have been, or will be completed, within the required
timeframe. The Noosa Council grant for Energy Assessments and Upgrades for Low Income and
Vulnerable Households, required a variation to re-focus the project, due to the difficulty of engaging with
organisations to select the households to be involved.
The Go Car Free Day project, again funded by Council, was due to be acquitted on 15 Dec., 2025.
However, this funding was not expended on all items listed in the approved budget due to Go Car Free
Day falling in the school holidays in Qld. This made it difficult to engage with locals, so the project was
reoriented, with the agreement of the Council Climate Change Officer. The timeframe was extended to
April 2026, with the remaining funds being transferred to the ebike library project enabling it to continue
operation longer than it was previously funded. The e bike library is a key way to remind people about
how they can Go Car Free.
15
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 16
Source Amount Description Project Status Acquitted/Acquittal
Due
Noosa $10,000 2025 EV & Electrify Completed. 2025 Report submitted to
Council (+GST) Everything Expo Expo completed Council.
successfully. 6,000
people attended.
52% of Expo visitors
will or may purchase
an EV in the next 12
months
Noosa $18,393 Businesses – Save Energy, In Progress – Project completion due
Council (+GST) Reduce Costs contractor hired 30 June, 2026
and consultations
taking place with
several businesses.
One business has
installed solar &
battery. Other
getting roof repairs
done so they can
install solar.
Noosa $5,715 Go Car Free Completed as far Was due to be
Council as possible by completed on 15
Dec., 2025 & Dec.2025; extended to
remaining funds June 2026 &
transferred to e remaining funds
bike library. transferred to ebike
library project.
Qld. Govt. $22,391.81 Ebike library – purchasing & Purchases Acquitted to Qld.
Dept of (+GST) making ebikes available for completed early Govt. in Dec., 2025.
Transport loan to encourage e bike 2025 & launched at Operation of e bike
& Main riding to reduce traffic Expo in June, 2025. library now extended
Roads congestion, transport Positive take up in to April, 2026 with Go
emissions & improve In Progress Car Free Day funds.
health. .
Noosa $29,000 (+GST) Energy Assessments and Completed June Report submitted to
Council Upgrades for Low Income 2025. Council in July 2025.
and Vulnerable Report accepted &
Households. Grant variation project acquitted.
on 29 Jan 2025 resulted in
solar PV being installed on
10 low income homes.
Noosa Remainder Alliance Partnership Completed Alliance Funds year 2
Council of $125,000 Agreement 2 2024-2025 funds fully
plus GST. Administration of ZEN Inc. expended before end
as a small business and of 2025.
some Communications –
Marketing & PR work
Noosa $125,000 for Alliance Partnership In progress
Council 2025-2026 Agreement 3 Year
Administration/Secretariat
of ZEN Inc. and
Program/Project Manager
roles to help run ZEN inc.
as an efficient & effective
Not for Profit, and for
Communications –
Marketing & PR assistance
Yarra $10,000 Community consultation for Almost completed $500 left for Comms.
Energy Community Battery on community battery
Foundation consultation
16
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 17
9. Methods of communication/marketing & audience reach
Actual & Possible Number of People reached with ZEN Inc. Projects & Activities =
2,410,139 people*
*Attendance at forums and events are actual numbers. Possible reach listed by the coverage of
print and electronic media.
EV & Electrify Everything 6,500 visitors
Expo + 126 businesses in Noosa Junction x av. 2 people per business =
252
+ 65 Exhibitors x av. 2 staff per stand = 130
+ 120 potential exhibitors = 120 7,200
Community Battery Group 70 households In Noosa Bushlands x av. 2 people per house = 140 x
2 rounds of community engagement = 280 280
Solar for Strata Forum with 25 body corporate related entities 25
Tourism Noosa Studies
Solar for Strata Stage 3 500 people across Aust. 500
Supporting Solar Champions Video
Saul Griffith Electrify 250 people 250
Everything Noosa Forum
11 Electrify Everything 11 forums x av. 25 per forum = 275 people 275
Forums in Noosa Shire
@ Transport Advocacy 30 people x 2 = 60 60
forums (Cooroy & Noosa)
E Bike Library 49 households x av. 2 persons /h/hold 98
Go Car Free Day 513 people
Business Energy Advisor Role 22 businesses x 2 av. people per business 44
Noosa Council Staff 7 Crs. + 15 Council staff 22
ZEN Inc. newsletters 1,600 x 9 = 14,400 people 14,400
NBRF newsletters 500 x 2 = 1,000 people 1,000
Tourism Noosa Social media & newsletters x 2 = 452,000 452,000
ZEN Inc. website 10,000 10,000
ZEN Expo website 6,900 6,900
ZEN Inc. All Social Media 76,000 76,000
(incl. Facebook)
ZEN Instagram 900 900
Print media Noosa Today 22,000 people x 23 issues = 506,000 people 506,000
Your Local Lifestyle (YLL) 8,000 x 6 times per year = 48,000
Radio Hot 91 @ Expo 500,000 people 500,000
ABC Sunshine Coast 275,000 x 3 = 825,000 825,000
SEA/MIX FM 97,400 97,400
Noosa Community Radio 500 500
Station
Tress for Tourism 30 people x 2 events 60
NBRF Awards 300 people 300
Submission 300 people 300
17
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 18
ZEN Inc. Members & Public 85 85
Fund Account Committee
Total Actual & Possible Number of People reached
2,410,139 people
10. ZEN Inc. - Council 3 Year Alliance Partnership Funding for 2026-2029
ZEN Inc. needs $251,469 in year 1 or 2026-2027, $260,753 in year 2 or 2027-2028 & $277,245 in year 3
2028-2029 to provide the following services to the Noosa Shire Community to assist Council to implement
the Climate Change Response Plan & many other plans. This is being done through behaviour change to
help move the Noosa Shire Community closer to net zero greenhouse emissions.
Role Funded Funding Year 2026-2027
Estimate
per year
Core Business ZEN- from
ZEN-E
Activity TAG F&FR
Meeting 2028/2
2026/27 2027/28 9
B.E.A advisory##
Energy charges; Energy
Mgt.; Energy Efficiency
x x $46,080 $48,384 50,803
behaviour change;
resources; solar &
batteries.
Household
advisory#
Tariffs, How to Read
Your Biil; Rebates &
Concessions; Energy $18,720 $19,656 20,639
Mgt.; Energy Efficiency
behaviour change;
resources; solar &
batteries.
Case studies x 7,604.85 7,986.00 8,385
Community forums x
6,000 6,300 6,615
Policy
development/Advoc x
acy 0 0 0
Data
sourcing/hosting x
(SunSPOT) 0 0 0
Central resources
x x
e.g. suppliers list 0
18
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 19
0Active transport
community x
leadership 0 0 0
Industry collab (TN,
x x
CoC, NBRF)
0 0 0
Commissioning
x x
studies
0 0 0
Sustainable House
Day and other x x
events $2,000 $2,100 $2,205
Hosting speakers
x
(e.g. Rewiring Aus) $6,829 $7,170 $7,528
Expo x x
$15,000 $15,750 $16,109
e-bike library x
$10,445 $10,967 $11,515
Cycle Behaviour Change
Promotion EVENTS x $5,990 $6,290 $6,604
Impact
measurement per
activity $5,000 $5,250 $5,512
Opportunity
identification and
grant applications 0 0 0
Public reporting 0 0 0
In house governance
0 0 0
Services sub-total $123,669 $129,853 135,915
Staff Wages to Enable these Services to be Delivered
Staff Wages 2027 2028 2029
Program/Project
Manager Incl. on
costs Annual Leave,
Super, Workcover $60,000 $61,200 $62,800
Secretariat/Admin.
Incl. on costs Annual
Leave, Super,
Workcover $47,800 $48,700 $52,393
19
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 20
Admin. Inc. in costs
above
Comms. &
Marketing $20,000 $21,000 $22,050
Wages & Comms. sub-total $127,800 $130,900 $137,243
Total Funding Needed $251,469 $260,753 $277,245
Staff Roles to Run Above Services in Addition to Volunteers are outlined in
section 7 above.
9. Financial Statements for 2025
Please note: ZEN Inc’s Financial Year is Jan. – Dec., 2025
a. P&L For Jan. – Dec., 2025
The Profit & Loss Statement for the above period shows:
Gross Profit was $ 83,144.98
Total Operating Expenses $ 83,378.97
Net Profit $ (233.99)
The majority of these funds are project based from grants and so are allocated to a specific projects.
Refer to Appendix H for details.
b. P&L for Projects Jan. – Dec., 2025
The Profit & Loss Statement by Project shows that for the period 01 Jan., 2025 to 31 December 2025 all
funds were spent as per project plans.
Refer to Appendix I for details.
c. Balance Sheet- as at 31 Dec., 2025
ZEN Inc. total assets were $239,666.88, with total liabilities $8,507.13 and net assets were
$231, 149.85 and equity was $231, 149.85. See Appendix J.
9. Audited financial report for financial year
The accounts audited by Louise McNeich, auditor, LMC Financial Group at Cooroy.
As the audited accounts were only provided by the Auditor recently, they are attached unsigned as it has
not been possible to get them signed by both parties prior to submitting this report. Refer to Appendix K.
20
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 21
10. Donations - DGR funds
Zero Emissions Noosa Inc. was granted DGR status with immediate effect by the Assistant Minister for
Competition, Charities and Treasury on 23 September 2022. The balance of the account has varied, as
funds have been transferred to the Operating Account to meet expenses, on an as needs basis,
particularly for the 2025 EV & Electrify Everything Expo. The expenditure of these funds has been agreed
by the ZEN Inc. Public Fund Account Committee, as meeting the objectives of the organisation.
Date Balance
01 Jan. 2025 $ 2,309.24
14 May, 2025 $3,319,57 following donations to ZEN Inc.
11 June, 2025 $4,322.43 following donations to ZEN Inc.
20 Aug., 2025 $2,358.73 after funds from this account were used to assist the
objectives of ZEN Inc., including the 2025 Expo.
31 Dec., 2025 $2,367.65 following a further interest payment
ZEN Inc. is actively seeking donations to it’s Public Fund Account.
11. Any significant delays in performing the ZEN Inc. program for this Agreement
The biggest risk for Council and ZEN Inc. is finding sufficient volunteers to be project leaders and to
actively drive projects and source future funding sources. Hence, the ability to appoint a part time
Program/Project Manager in late 2024, has partly assisted our volunteers in 2025 with projects. Getting
dedicated volunteers, with time, since COVID has been difficult, and many of the very active volunteers
who have been involved with ZEN Inc since it’s inception or for many years, (after having given thousands
of hours of volunteer time to ZEN Inc. & Council), have stepped back from being actively involved in ZEN
Inc. projects. ZEN Inc. is actively recruiting new volunteers to assist with our work.
-------------------------------------------------------------------------------------------------------------------------------------------------------
A. Value of 2025 Volunteer In Kind Hours Appendix A
Source Amount Description Funding Leveraged Volunteer In
Kind Hours
Noosa Council $10,000 2025 7th EV & Electrify $1,924,642 Colin
(+GST) Everything Expo Lambie
Project Leader: Rex Halverson as $19,200 (Expo
a major part of his Working
Program/Project Manager role, Group
assisted by ZEN Inc. volunteers in chair) 5
Expo Working Group. hrs. per
week x 4
6,000 people attended weeks =
expo & 65+ exhibitors. 20 hrs per
month x
56% will make a purchasing
decision in the next 12 months. for 8
months =
160 hrs
@$120
per hour
21
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 22
$19,200 Anne
Kennedy
5 hrs per
week x4
weeks/mt
h = 20 hrs
per month
x8
months =
160hrs
Expo
$23,040 Working
Group
Doug
Webb,
John
Green,
Paul
Lewis x 2
hrs each
per week
= 24hrs
per month
x8
months =
192 hrs
$7,680 NJA 2 hrs
x 4 weeks
=8 per
month x 8
months =
64 hrs @
$120 per
hour
$16,000 + Vols. on
day 40
vols. 8
hours =
320 hrs x
$50 per
hour =
ZEN Inc Not Solar for Strata Stage 3 - $3,000 Colin 0.5 per week
Funded Supporting Solar Champions x 25 weeks @
in 2025 Video (Climate Change Grants) $120 per hour
Project Leader: Jenny Clement
Not Rewiring Noosa – Electrify $52,800 Mark, Colin &
funded Everything Working with Saul Anne or other vol.
in 2025 Project Leader: Mark Purcell Griffiths Rewiring 11 forums = 20hrs
Key r4eolsd by Anne Kennedy, Australia as one of 10 x 11 = 220 vol.
Rex Halverson pilot communities hours x 2 people
= 440 hrs @ $120
per hour
$3,840 + Anne for Saul
Griffith forum 4
hrs per week x 2
months = 32
hours @ $120 per
hour
22
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 23
Yarra Energy $10,000 Community Battery – $12,000 Anne 5 hrs per
Foundation (+GST) Community Consultation x 2 week x 4 weeks =
(YEF) - rounds. Project Leader: Anne 20 hrs x 5 months
Noosaville Kennedy = 100 hrs @ 120
Community per hour +
Battery
Community 24 hours for
Consultation $14,400 Community
Consultation @
120 hrs x 1
Round
$28,800
Colin 24 hours for
Community
Consultation @
120 hrs x 2
Rounds -= 240hrs
$4,800
Anne & Colin
Project Group
meetings Anne &
Coli 0.5 hrs
/week x 4 weeks
= 2 hrs x 2 people
= 4hrs.x 10
months = 40 hrs x
$120 per hour
ZEN Inc. No funding. Data Dashboard $1,200 Josh & Anne 10
Project Leader: Josh Stevens hours x @
$120/hr.
Noosa Council $29,000 + GST Low Income Homes $13,440.00 Colin 4 hrs./week
x4 weeks = 16hrs
/mth. X 7 mths.
(to 31 Jul 2025)
@$120 = 112hrs
Colin 0.5 hr/week
$3,840 x 4 weeks = 2
hrs/mth. X 4 mths.
= 8 hrs/mth.x 4
mths. (01 Aug. –
31 Dec., 2025) =
32 hrs @ $120 =
Anne 4 hrs/week
x 4 = 16hrs x 3
$5,760.00
mths. = 48hrs @
$120 =
Noosa Council $18,393 + GST Businesses – Save Energy, Save $7680.00 Colin 4 hours per
Money week x 4 weeks
16/mths. x 4
mths. since (Aug
– Dec. 2025) =
64hrs @ $120/hr
$5,760 Anne 3 hrs./week
= 12 hrs./mth. x 4
mths. (Aug. -
Dec. 2025) – 48
hrs @ $120 =
23
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 24
Noosa Council $5,915 + GST Go Car Free $7,200.00 Jenny 60 hrs @
$120/hr =
$360.00 Vivien 3 hrs @
$120 =
$360.00 Angela 3 hrs @
$120 =
Noosa Council $22,301.81 +GST E Bike Library $17,280.00 Jenny 3hrs/week
x 4 weeks = 12
hrs. x 12 mths. =
144hrs @ $120 =
Peter 10 hrs x 6
mths = 60 hrs @
$7,200.00 $120 =
Phil 10 hrs x 6
$7,200.00 mths = 60 hrs @
$120 =
Angela 10 hrs x 6
$7,200.00 mths = 60 hrs @
$120 =
Darren 2hrs/mth.
X 6 mths.- 12 hrs
$1,440.00 @ $120/hr =
ZEN Inc., Unfunded Transport Summit $ 26,400.00 Vivien 5hrs/week
NBRF, x 4 weeks = 20
Tourism hrs x 11 mths.=
Noosa, 220 hrs @$120
Peregian
Beach Assoc. Jenny 20hrs.@
& SC BUG $2,400.00 $120/hr. =
Anne 14hr @
$1,680.00 $120 =
Noosa Council $125,000 Partnership Agreement $158,400 + Anne 2025 30 hrs
(+GST) Grant Leader Anne Kennedy x 4 weeks = 120
Coordinating administration of hrs x 11 months
ZEN Inc. as a small business & =1,760 hrs @ $120
supervising two staff members
Grant enables ZEN Inc. to do Colin incl.
Project, Admin. & Treasurer’s role) –
Communications work 12.5 hrs x 4 weeks
$66,000 = 50 hrs x 11 mths
= 1,320 hrs @
$120
24
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 25
ZEN Inc. No Board $85,800.00 Board & Advisors
volunteers Funding 13 meetings x 5
working in & on hours incl. Prep.
the organisation, Time = 65hours x
media, projects 11 people = 715
(in addition to hours @ $120 =
the project
leaders hours
included above) 6 meetings x 4
Governance & Operations, $14,400.00 hours= 24 incl.
prep. x 5 people
= 60 hours @
$120 per hour
Finance & Fundraising, $8,640.00 6 meetings x 4
hours incl. prep.=
24 hrs. x 3 people
= 72 hours @ 120
per hour
10 meetings x 4
Communications & Advocacy $ 28,800.00 hrs (Incl. prep) =
meetings & follow up work, 40 hours x 6
people = 240 hrs
@ $120 per hours
Jenny 2 hrs x 4
weeks = 8 hrs x
print media $10,560.00 11 months = 88
hrs@ $120
Anne 20 hrs.
@$120 = $2,400
social media $2,400.00
Duncan 10 x
4weeks= 40hrs x
11 mths = 44hrs
$4,800.00 @ $120
Colin 3 hrs x
4weeks = 12
$15,840.00 hours x 11
months = 132 hrs
@ $120 =
ZEN Inc. No ZEN E $13,200 Mark = 10 hrs x
volunteers Funding 11 months = 110
working in & on hrs @ $120
the organisation,
media, projects ZEN E Group –
(in addition to $24,000
10 people x 2 hrs
the project per month = 20
leaders hours hrs x 10 meetings
included above) = 200 hrs @ $120
Jenny - 6 hrs x 1
mth. x 11 mths. =
ZENTAG $7,920.00 66 hrs. @ $120
ZENTAG Group 6
people x 2 hrs =
$14,400.00
12hrs x 10
25
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 26
meetings =
120hrs @ $120
Expo Working Group meetings See in no. 1 above
ZEN Inc. No Strategic Planning Review Day $12,000.00 15 people x 6 hrs
volunteers Funding = 90 hrs + 6 hours
working in & on for Susannah
the organisation, write up + 4 hrs
media, projects briefing = 100 hrs
(in addition to @ $120
the project
leaders hours
included above)
Electrify No Sustainable House Day $4,320 6 vols. X 6 hours
Everything Funding = 36 hours @
$120/hr
Website From Website – Susannah Yeung $1,200 10 hrs @ $120 /hr
Alliance
Funding
Total $982,320 8,186 vol.
2025 hours
2025
B.Additional Value of In-Kind Contributions from ZEN Inc’s Work Appendix B
Contributions to the Noosa $31,391.81
Community in non-council
grants/funding
ZEN Inc. Expo Sponsorships
Expo Exhibitor fees & Donors $70,600
Expo Donors $2,075
Expo in kind including RACV Resort $6,500
accommodation, Bluetti battery,
Segway, Ohme EV Charger and
Bunnings gift cards
Saul Griffith In Kind Aug. event $5,000
Electric Viking In Kind fee $3,500
+ Expo Advertorial 8 pages X $1,645 x 8 $13,160
Total $132,226.81
26
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 27
EV & Electrify Everything Expo - Event Impact Summary Appendix C
27
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 28
Appendix D
ZERO EMISSIONS NOOSA Inc
ZEN Inc STRATEGIC PLAN 2023-2026
Introduction
Our vision is for net zero emissions in Noosa Shire.
Zero Emissions Noosa Inc seeks to make Noosa Shire a leading local government region in
zero emissions. We seek to do this by supporting the community in the transition to net zero
emissions through project leadership, advocacy, and the provision of information to all
sections of the Noosa community.
Our strategic plan outlines how we will achieve this mission as we seek to seize new
opportunities and meet the challenges of the future. While our strategic plan is future
focussed it is grounded in our contemporary operating environment which is heavily
influenced by the pressures on our resource base – both financial and human.
Since ZEN Inc was founded in 2016, the need to reduce emissions is more pressing than
ever if we are to avoid catastrophic climate change. The transition to a cleaner energy future
has seen more changes and challenges than at any time in recent years. Meeting the needs
of our community in this space is a major challenge, but also a significant opportunity.
This strategic plan sets out our vision for the future and a framework for its delivery over the
next three years. It includes:
● our vision for net zero emissions in Noosa Shire.
● the roles that define where we will work to deliver the vision.
● our aims within those roles; and
● an outline of our priorities in delivering those aims.
28
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report
2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 29
Through our planning process we have developed strategic priorities for the next three years
framed around our two key goals:
● Promoting community actions to achieve net zero emissions.
● Developing a sustainable organisation
This strategic plan is not a static document and the Board, and its working groups will give
ongoing consideration to ideas and suggestions that have been put to us as well as giving
consideration to an increasingly dynamic and challenging environment throughout the period
of this plan.
Each year we will report on how we have delivered on this strategy at our annual general
meeting and through our annual report.
Organisational Description
Zero Emissions Noosa Inc (ZEN Inc), established in 2016, is an incorporated, not-for-profit,
community organisation with the key objective of assisting the Noosa community achieve net
zero emissions in the Noosa local government area. ZEN Inc has been actively pursuing
several strategies aimed at achieving this objective.
It is the leading community organisation in this field and the only community organisation
solely dedicated to emissions reduction across the Noosa Shire.
The two key objectives of the organisation have been to drive projects in the stationary
electricity and transport areas aimed at assisting individuals, businesses, and the community
at large, in contributing to emissions reduction.
The core work of the organisation is carried out by two working groups – ZEN E (Electricity),
ZENTAG (Transport) and the EV & Electrify Everything Expo. The focus of ZEN E’s work is
on projects that assist in reducing emissions in the stationary electricity sector with initiatives
that assist a greater uptake of solar as well as storage and other initiatives. ZENTAG’s focus
is on reducing emissions from transport by encouraging, advocating and demonstrating low
emissions alternatives to the dominant petrol / diesel driven motor vehicle. The Expo
Working Group focuses on the annual EV & Electrify Everything Expo is ZEN Inc’s flagship
event.
Organisational support is provided through the work of three sub-committees; Finance &
Fundraising; Governance & Operations; and Communications & Advocacy.
29
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report
2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 30
Vision
Net zero emissions in Noosa Shire.
Mission
Working with the Noosa community to achieve net zero emissions to address climate
change.
Core Values / Values Statement
Values Thinking Behaviour
Honesty Independent Respected
Transparency Inclusive Collaborative
Accountability Evidence based Inspirational
Ethical Excellent Empowered
Our values statement describes how ZEN Inc works internally and externally.
ZEN Inc works independently to provide leadership by empowering its members and
stakeholders with ethical, independent, evidence-based solutions for reducing Noosa’s net
greenhouse gas emissions to zero. We do this by operating in an honest, accountable,
collaborative, and inclusive way.
Goals
Our goals are the key focus areas that will move the organisation to achieve its vision and its
mission.
We have identified two goals for 2023 – 2026:
Goal 1: Promoting community actions to achieve net zero emissions.
30
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report
2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 31
We will continue to focus on our core business. We will provide leadership
and management of projects and initiatives that help the Noosa community on
its journey towards net zero emissions.
Goal 2: To be a sustainable organisation.
We recognise that for ZEN Inc to fulfill its vision and mission it must be a well-
resourced and efficient organisation.
Objectives
Our objectives support the two key goals identified above. Our outcomes describe how we
will measure the progress needed.
Objectives Outcomes / Measures of success
1.1 Reduced business and household stationary
energy emissions.
ZEN Inc will focus on its core project work to deliver ● Projects delivered within agreed
emissions reduction initiatives to the Noosa timeframes.
community. ● Business and household
emissions reduced
1.2 Reduced transport energy emissions
ZEN will focus on promoting transport initiatives and ● Increased use of sustainable
sustainable transport options that reduce greenhouse transport options including public
gas emissions. transport, unpowered vehicles
and walking
● Increased uptake of electric
powered vehicles (EVs) and
reduced use of internal
combustion vehicles (ICEVs)
1.3 Increased community awareness of initiatives
to reduce emissions
ZEN Inc will provide information to the community to ● Increased community uptake of
assist in the implementation of emissions reduction information and tools
actions. ● Effective dissemination of
information through ZEN Inc’s
website.and other channels.
● Increased participation through
community engagement.
2.1 Increased financial sustainability
ZEN Inc will work to ensure that it is a financially ● Ongoing funding secured.
sustainable organisation by aiming to secure ongoing ● Funding sources diversified
funding and by diversifying its funding sources.
2.2 Efficient organisational operations
ZEN Inc will continue to develop its resource base and ● Continue a culture of continuous
review its processes and procedures to be an efficient improvement.
and effective organisation. ● Governance & Operational
manual developed.
● Processes and procedures
refined and rationalised
31
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report
2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 32
2.3 Effective external and internal communications
ZEN Inc will develop effective internal initiatives to ● Increased community awareness
enhance the way we work and increase awareness of ZEN (who we are; what we do)
amongst the community of who we are and what we ● Brand strategy developed
do.
2.4 Strong strategic relationships.
ZEN Inc will build on and further develop strong ● Increased engagement with
strategic relationships with our stakeholders to stakeholders.
collaborate in reducing emissions. ● Collaborative and productive
partnerships strengthened and
widened
● Respective roles of ZEN Inc and
Noosa Council are mutually
beneficial.
Situation Analysis
In developing this strategic plan, we examined the internal and external environment in
which the organisation operates with a view to addressing some of the threats that we face
while seeking to maximise the opportunities before us.
Since its formation in 2016, ZEN Inc has had, as its vision, “net zero greenhouse gas
emissions across the Noosa region by 2026”. While progress has been made in reducing
emissions across the Noosa Shire, realistically we have no agreed way of measuring
whether we will achieve that goal within the stated timeframe.
While ZEN Inc remains strongly committed to its mission to achieve net zero emissions, we
have dropped the 2026 timeline from our vision statement and modified it accordingly.
We recognise that we are operating in a rapidly changing environment. While that poses
threats as to whether we have the capacity and resources to manage those challenges, we
hope to capitalise on the opportunities presented by the changing environment. The strength
of the organisation lies in a highly experienced and committed Board and a volunteer and
supporter base committed to taking practical action to help reduce emissions across the
Noosa Shire.
Internally, the organisation lacks a strong financial base and some strengthening of our
governance arrangements will assist the way we work. Our undoubted strength is our
commitment to several key project initiatives that have firmly placed the Noosa Shire as a
leading local government area on the road to a net zero emissions future. However, while
our key focus remains on our project work, we recognise that our project teams need to be
supported by a well-resourced and efficient organisation.
Building on our signature strength of innovative project work, our strategic plan continues to
focus on project delivery that helps the community move towards a reduction in net zero
emissions. For example, the “Electrify Australia” movement led by Saul Griffith offers
significant opportunities for ZEN Inc to assist the community at the local level. Providing
guidance in helping households to “electrify the home” while also developing initiatives that
will assist in “electrifying everything” presents us with several opportunities.
32
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report
2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 33
Federal Government policy and funding initiatives also provide opportunities which ZEN Inc
will continue to embrace.
While we have enjoyed several high-profile successes, there is a recognition that our
communications could be improved to maximise the impact of our initiatives and more time
needs to be spent on stakeholder engagement. The benefits that our work brings to the
community, as the leading source of information on emissions reduction in the Noosa LGA,
needs to be better explained.
Demonstrating how we deliver benefits to the Noosa community is both a challenge and an
opportunity.
A lack of brand identity could be strengthened as there is a perception that ZEN Inc’s. is
done by Council.
There is an opportunity for both ZEN Inc and Noosa Council to clarify our respective roles to
work collaboratively to assist the Noosa community on its journey to net zero emissions.
The provision of community education on emissions reduction strategies offers an ongoing
opportunity.
Strategies
The key priorities and higher-level elements identified through our SWOT analysis have
informed our strategies. The strategies inform the ZEN E and ZEN TAG plans and the
activities of our three sub-committees.
33
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report
2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page
Page 34
ZEN’s GOALS, OBJECTIVES & STRATEGIES
GOAL 1 GOAL 2
Promoting community actions to achieve net zero To be a sustainable organisation
emissions
OBJECTIVE 1.1 OBJECTIVE 1.2 OBJECTIVE 1.3 OBJECTIVE OBJECTIVE 2.2 OBJECTIVE 2.3 OBJECTIVE 2.4
2.1
Reduced business and Reduced transport energy Increased community Increased financial Efficient Effective external Strong strategic
household stationary emissions awareness of initiatives to sustainability organisational and internal relationships
energy emissions reduce emissions operations communications
STRATEGIES STRATEGIES STRATEGIES STRATEGIES STRATEGIES STRATEGIES STRATEGIES
Undertake targeted, large Promote transport initiatives Greater direct engagement Build a strong Strengthen well Increase awareness Strengthen and broaden
impact projects to that reduce greenhouse gas initiatives with the Noosa Shire financial position to connected and amongst the collaborative and
maximise emissions emissions community support our collaborative working community of who productive partnerships
reduction projects and groups and sub- we are and what we
activities committees do
Encourage community Encourage walking and Develop online toolkits to Apply for Federal, Develop clear Maintain ZEN Inc as Increase reach and
initiatives that support cycling initiatives facilitate energy transition and State and Council processes to support a significant influence as the leading
uptake of renewable emissions reduction funding the organisation in contributor to community organisation
energy the delivery of emissions reduction advocating emissions
projects, events & within the Noosa reduction.
programs Shire.
Develop the “electrify Promote carbon capture Effectively disseminate Diversify funding . Ensure benefits of Work with Noosa
everything” concept technologies and initiatives information through ZEN Inc’s sources projects and Council in differentiated
across the Noosa Shire to offset car travel website and other activities are roles for mutual benefit.
communication channels. communicated to
stakeholders
Ensure battery initiatives Review Noosa Council’s Examine potential Foster effective
are delivered within Transport Strategy and revenue streams communication
agreed timeframes make recommendations pathways both
internally and
externally
Implement Solar for Strata Review commitment to EV Develop a ZEN
initiatives Expo.. brand strategy
34
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report
2025 · Page
Page 35
Progress the concept of Advocate for, and
an energy hub at Peregian demonstrate, sustainable
Beach / Marcus Beach transport options for
transport that reduce
greenhouse gas emissions.
Advocate for EUAs for
residential dwellings,
including for low-income
households, landlords and
tenants
Examine methodologies
for carbon accounting
See page to follow
35
Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report 2025 · Page Zero Emissions Noosa Inc. | Operational Report
2025 · Page
Page 36
Key Actions
The Strategic Plan is our overarching planning document and guides the work of our working
groups and sub-committees.
Specific actions will be progressed through the two working groups and three sub-committees to
give effect to the strategies identified in the Strategic Plan
Monitoring and Evaluation
Our planning and reporting framework is designed to support the implementation of this plan and
the realisation of our vision for an emissions free Noosa.
The strategic plan identifies the key measures of our success and the outcomes that we hope to
achieve as measured against our two key focus areas (goals) and the strategies we will employ.
Performance against these outcomes will be reviewed, where possible, throughout the year but
at least once each year, and reported to enable the Board to monitor progress.
Working groups are encouraged to develop measures of success for their respective projects
and activities as outlined in their action plans.
Prepared: August 2023 (Org. Chart updated Feb. 2025)
Email: [email protected]
Website: www.zeroemissionsnoosa.com.au
Appendix: The SWOT Analysis
Strengths (Internal)
Committed and experienced Board
Existing runs on the board
Existing connections with groups / individuals
Members and volunteers
Strong relationship with Council
Reputation / credibility
Organisational basics in place
Large database on emissions reduction information
Consistent communication capability
ZEN Inc. uses evidence-based solutions
Weaknesses (Internal)
Over reliance on the ZEN Chair
Insufficient people to delegate to
Insufficient paid human resources
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 36
Page 37
Lack of participation in working groups
Lack of human resources to implement information management systems (shared drive /
website)
Lack of financial sustainability
Opportunities (External)
Working with Noosa Council
Other zero emissions communities e.g. ZEB
Rewiring Australia (stakeholders, YEF)
Diversification of funding sources
Federal / State governments (engagement, advocacy, grants)
Tap into community sentiment
Clarify carbon accounting (support)
Stakeholders (e.g. universities)
Industry
Community benefits (financial, environmental, sustainability, health)
Information sources
Threats (External)
Disbelief within the community
Current 2026 goal maybe unachievable
Too much to do…may get lost
Seen as an “arm” of Noosa Council; who does what (vis a vis ZEN / Council)
Funding resources
ESG (Environmental, Social and Governance)
Changing government priorities
Insufficient paid human resources
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 37
Page 38
Appendix E
July 2025 – June 2026 ZEN E ACTION PLAN TOWARDS ZEN ENERGY OBJECTIVES Revised 13 Aug., 2025 v3
KPI’s Updated 14 January 2026 v4
PROJECT DESCRIPTION PROJECT ALIGNMENT
GOAL: Promoting community actions to achieve net zero emissions
OBJECTIVES: 1. Reduced business and household stationary energy emissions
2. Increased community awareness of initiatives to reduce emissions (through greater community awareness & engagement &
outreach to Council)
Working Group Leader: Mark Purcell (Jan. – Nov. 2025); Anne Kennedy (Interim Chair)
ACTIONS STATUS TIMEFRAME PROJECT KPIS ZEN NOOSA COUNCIL**
LEADER(S) STRATEGIES*
& TEAM
COMMUNITY ENERGY ACCELERATOR 2025-2026
Accelerating community electrification to reduce emissions through energy efficiency, renewable energy and electrification.
1.Community Battery Projected to be installed “early” Anne, Colin # installed in 2026 STRATEGIES Climate Change Response Plan (CCRP)
2026. Battery is ready and 1.1.1; 1.1.2; 1.1.4 Themes & Economic Development Strategy
Look for opportunities for consortium members (Council, & 2021-2030: Outcomes & Benefits
neighbourhood batteries ZEN, YEF) have completed steps. 1.3.1; 1.3.2; 1.3.3 Theme 2: Energy efficiency and renewable
Waiting on Acacia Energy (private energy
contractor) to complete site works 1.1 & 1.3
to allow Energex to install.
Theme 3: Clean low
emissions industries
3.1 & 3.2.
Theme 7: Resilient & adaptive communities &
built environments
Outcomes & Benefits
1, 2, 3, & 4
Theme 2: Energy efficiency and renewable
2. Rewiring Noosa - Ongoing advocacy/promotion to Mark, Vikki # Partnership with Rewiring STRATEGIES energy
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 38
Page 39
“Electrify Everything” external organisations/community & Josh, Aust. investigated but not 1.1.1; 1.1.2; 1.1.3 2.1 & 2.3
a. Introduce a community in 2025 -2026. Colin, Anne possible &
energy accelerator in 2025- 1.3.1; 1.3.2; 1.3.3
2026 for homes in Noosa Rewiring Australia has advised # ARENA & other funding Theme 3: Clean low
(4562, 4563, 4565, 4566) ARENA will not fund this a investigated but not possible. emissions industries
rewiring community project at this 3.1 & 3.2
time. As the Noosa Community Theme 7: Resilient & adaptive communities &
Accelerator is unfunded it cannot built environments
proceed for now. 7.1 & 7.2
Keep the 500+ homes accelerator Theme 6: Sustainable agriculture
project in mind and scan for grants # no. of people attending info. and food systems
or other opportunities to action 6.3 Support agri-businesses & landholders
# Sessions a&b
Outcomes & Benefits 3 & 4
Funding sought from the
Community Gambling Benefit fund # 2025 – 11 sessions
b. Forums - presentations for 4 forums in 2026 but delivered at Noosa Libraries;
@ Noosa/Cooroy libraries, unsuccessful. U3A, Noosa Parks Assoc. &
U3A, NPA & Peregian Anne, Colin Peregian Beach Community
Brach Community House Anne in process of setting up & Rex Assoc. (PCBA)
&/or @ venues for different library and U3A sessions for 2026
demographic & geographic
groups
c. Promote of online #Links to installers/suppliers
Rewiring Noosa -
“Electrify Everything” toolkit
& Videos
# no. of businesses willing to
Anne be involved - No action to
d. Linking to Tradespeople date
with Surfers for Climate;
Cleantech Network; TAFE; - # no. of info. Session for
Electrical Trades Investigate willingness of industry tradespeople - No action to
Association; Suppliers e.g. to be involved Anne date
Electrical wholesalers in
# no. of tradespeople linked to
Noosa e.g. Lawrence &
“Electrify Everything”
Hanson concepts - No action to date
# ZEN Inc. partnered with
d. Participate in Sustainable Renew & SCEC
House Day- partner with May, 2026.
# 3 homes opened for public
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 39
Page 40
Renew & SCEC Anne to communicate to Renew view/tours/talks
and lead recruitment of host
homes for 2026. Anne
3. Save Energy, Save Noosa Council Grant funded to Colin, Anne # Business advisor recruited STRATEGIES Theme 2: Energy efficiency and renewable
Money (for Businesses) June 2025 (Only 50% of grant & Josh # 22 businesses visited 1.1.1; 1.1.2; 1.1.3; energy
Work with business owners applied for, so project will run # 2 + 2 in pipeline - 1.1.4 &
to assess and introduce Sept.- Nov. & Feb. – April). businesses take up energy 1.3.1; 1.3.2; 1.3.3 Theme 3: Clean low
energy efficiency, efficiency measures emissions industries
renewable energy solutions One business has installed 24kW # 1 + 3 in pipeline businesses 3.1 & 3.2
and link them to suppliers solar +50kWh battery. One take up solar Theme 7: Resilient & adaptive communities &
repaired inverter. 5-6 prospects in # 1 + 2 in pipeline businesses built environments
pipeline take up battery 7.1 & 7.2
# 1 + 1 in pipeline businesses Outcomes & Benefits
take up additional Electrify 1,2,3,4, & 6
Everything specific to
business e.g. HVAC
# 1 in pipeline EV chargers
Theme 2: Energy efficiency and renewable
4. Solar for strata # 1 body corporate that has energy
Engage bodies corporate it Ongoing as opportunities arise Colin installed solar in 2025 2.2 & 1.5
install solar systems
Theme 3: Clean low
emissions industries
3.1 & 3.2
Theme 7: Resilient & adaptive communities &
built environments
7.1 & 7.2
Outcomes & Benefits 1 & 2
5. Dash Board - Data Vikki & Josh # Current data on shared STRATEGIES Theme 2: Energy efficiency and renewable
Monitoring and analysis. drive 1.1.1; 1.1.3 energy
& 2.3 & 1.7
# Evaluate current data for 1.3.1; 1.3.2; 1.3.3
households Theme 3: Clean low
emissions industries
#Methodology developed 3.1 & 3.2
Theme 7: Resilient & adaptive communities &
# solar installations per month built environments
in Noosa Shire 7.1 & & 7.2
Theme 6: Sustainable agriculture and food
# ZEN Inc. able to access systems
SUNSPOT Data @ no charge 6.3 Support agri-businesses & landholders to:
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 40
Page 41
# Link on new website to a. Reduce their emissions
SUNSPOT technology implementation
b. Take up opportunities for income
generation through carbon drawdown
Outcomes & Benefits 1 & 2
CROSS CUTTING STATUS TIMEFRAME TEAM KPIS ZEN NOOSA COUNCIL**
ACTIVITIES STRATEGIES *
Support to the EV & June 2026 All # 3 ZEN E reps. on Expo
Electrify Expo Working Group
Energy related Comms & Ongoing # Many articles, posts
Advocacy submitted across all formats
Print & electronic media, See Report to Colcuil for
(Social, website & Audience reach.
newsletter)
Working strategically with Ongoing – as opportunities arise Anne, Rex & # 13 events of other
other groups Project organisations engaged in by
e.g. Tourism Noosa, leaders ZEN; # 12 partners engaging
Cleantech, Noosa with ZEN events
Biosphere
POTENTIAL OR PIPELINE STATUS TIMEFRAME TEAM KPIS ZEN NOOSA COUNCIL**
PROJECTS STRATEGIES *
If & when funding, human
resources or opportunities
arise
Community generated Develop if resources found Vikki # Resources not found Theme 6: Sustainable agriculture and food
offsets systems
6.3 Support agri-businesses and landholders to
reduce their emissions through changes in
farming practices and technology implementation,
and to take up opportunities for income generation
through carbon drawdown activities.
Any other opportunities that Develop if resources found TBC
can be funded and human
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 41
Page 42
resourced and that are
aligned with ZEN Inc’s.
strategic plan, consistent
with ZEN’s objectives &
subject to a risk
assessment.
*ZEN Strategies explained here
* ZEN Inc. Strategies
1.1.1 Undertake targeted, large impact projects to maximise emissions reduction
1.1.2 Encourage community initiatives that support uptake of renewable energy
1.1.3 Develop the “electrify everything” concept across the Noosa Shire
1.1.4 Ensure battery initiatives are delivered within agreed timeframes
1.3.1 Greater direct engagement initiatives with the Noosa Shire community
1.3.2 Develop online toolkits to facilitate energy transition and emissions reduction
1.3.3 Effectively disseminate information through ZEN Inc’s website and other communication channels.
**Noosa Council Climate Change Response Plan (CCRP)
Themes
Theme 1: Leadership and governance
1.1 Mobilise community for climate action
1.2 Action for low carbon economy & resilient community
1.2 Council is a powerful influencer for climate action
Theme 2: Energy efficiency and renewable energy
2.1 Transition Noosa Council and Noosa Shire to 100% renewable energy and ensure the transition is inclusive of low income and vulnerable residents and
businesses, including strata tenants
2.3 Develop a climate aware and empowered community for reducing climate risks and emissions
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 42
Page 43
Theme 3: Clean low emissions industries
3.1 Through targeted initiatives, create an environment that supports business development, innovation and investment shift to clean, green low emission
industries and technology
3.2 Work with industry, business associations and government agencies to facilitate emissions reduction and environmental sustainability for local
businesses
Theme 7: Resilient & adaptive communities & built environments
7.1 Create a resilient built environment for householders, businesses, vulnerable people, property and infrastructure
7.2 Build Council and community awareness and preparedness for climate change and extreme weather events
Theme 6: Sustainable agriculture and food systems
6.3 Support agri-businesses and landholders to reduce their emissions through changes in farming practices and technology implementation, and to take
up opportunities for income generation through carbon drawdown activities.
Economic Development Strategy 2021-2030: Outcomes & Benefits
1. Infrastructure accelerates industry development and Smart Precincts
2. Collaborative, and connected business Ecosystems are created
3. Expanded and specialised education and research opportunities
4. Relevant and impactful support provided to our businesses
5. Businesses maximising the global opportunities and
6. Selling to the world Increased number of high value jobs that retain local talent
7. A skilled and talented workforce driving
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 43
Page 44
Appendix F
July 2025 – June 2026 ZENTAG ACTION PLAN TOWARDS ZEN ENERGY OBJECTIVES Revised 13 Aug., 2025 v5
KPI’s updated 15 January 2026
GOAL: Promoting community actions to achieve net zero emissions
OBJECTIVES: 1.2 Reduced transport emissions
1.3 Increased community awareness of initiatives to reduce emissions (through greater community awareness & engagement &
outreach to Council)
Working Group Leader – Jenny Clement
PROJECT DESCRIPTION PROJECT ALIGNMENT
ACTIONS - STATUS TEAM KPIS ZEN NOOSA COUNCIL**
ONGOING TIMEFRAME STRATEGIE Noosa Council Climate Change Response
PROJECTS S* Plan (CCRP) Themes & Economic
Development Strategy 2021-2030: Green
Economy Plan
Noosa e-Bike On-going Jenny, Vivien, ● 46 borrowers 1.2.1; 1.2.2; Theme 1: Strong leadership and governance
Library Funding Phil, Peter H ● 3/10 borrowers 1.2.6 1.1; 1.2 & 1.3
secured to 30 Theme 2: Energy efficiency and renewable energy
buying ebikes
June, 2026 1.3
● 6/10 considering E Theme 3: Clean low
and currently bike purchase emissions industries 3.1 & 3.2
● 4.8 out of 5 borrower Theme 4: Sustainable Transport 4.1 & 4.2
satisfaction rating Theme 7: Resilient & adaptive communities &
● Expansion of library: built environments 7.1 & 7.2
Outcomes & Benefits 1 & 2
# 1 new e bike being
sought
Geography- TBC
● Funds from Car Free
Day assist to fund to
30 June
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 44
Page 45
● #3 articles Noosa
Today
Transport Advocacy Ongoing Vivien, Jenny, ● 2 community 1.2.1; 1.2.2;
Anne, Peter D consultations 1.2.3; 1.2.5
(Noosaville & & 1.2.6
Cooroy)
● 8 transport advocacy
related events e.g.
transport summits
● 4 written
submissions/articles
Go Car Free Noosa Being Jenny, Angela ● 98 pledges, 1.2.1; 1.2.2; Theme 4: Sustainable Transport
incorporated ● 15 social media 1.2.3; 1.2.5; 4.1 & 4.2 as above.
into other posts & 1.2.6 Theme 7: Resilient & adaptive communities &
projects so it is ● 400 landing page hits built environments 7.1
not just one ● 4 volunteers Theme 5: Healthy & resilient natural systems &
day carbon drawdown 5.1
Outcomes & Benefits 1 & 2
EV Charger Unfunded Colin ● # 3+ key 1.2.1; 1.2.2; Theme 4: Sustainable Transport
Advocacy Ongoing in stakeholders 1.2.4; 1.2.5 4.1 & 4.2 as above.
conjunction supporting greater & 1.2.6 Theme 7: Resilient & adaptive communities &
with the ZEN EV infrastructure built environments
E Save ● # Council support for 7.1 as above
Energy, Save greater EV
Outcomes & Benefits 1
Money for
infrastructure
Business
● # 1 + 1 in pipeline
project & ZEN
E businesses that have
installed EV chargers
CROSS CUTTING STATUS TEAM KPIS ZEN NOOSA COUNCIL**
ACTIVITIES TIMEFRAME STRATEGIE
S*
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 45
Page 46
Support to the EV & June 21, 2026 All ● # 3 ZENTAG 1.2.5; 1.2.6; Theme 4: Sustainable Transport
Electrify Expo Working Group reps. 1.2.5 4.1 & 4.2 as above.
on Expo Working Theme 7: Resilient & adaptive communities &
Group built environments
● # 7 of ZENTAG 7.1 as above
Theme 4: Sustainable Transport
members as As above
volunteers @ the Outcomes & Benefits 1 & 2
Expo
Transport related Ongoing Jenny & ALL ● # Many articles, 1.2.1; 1.2.2; Theme 4: Sustainable Transport
Comms & Advocacy ZENTAG posts submitted 1.2.3; 1.2.4; 4.1 & 4.2 as above.
Print & electronic Team across all formats 1.2.5 & Theme 7: Resilient & adaptive communities &
media, (Social, 1.2.6 built environments
website & newsletter) 7.1 as above
Outcomes & Benefits 1 & 2
Working Ongoing – as Anne, Jenny & ● # 4 partners 1.3.1; 1.3.2; Theme 5: Healthy & resilient natural systems &
strategically with opportunities Vivien engaging with ZEN 1.3.3; 3.0; carbon drawdown 5.1
other groups arise Outcomes & Benefits 2
events
e.g. Tourism Noosa, ● # 4 partners events
Cleantech, Noosa ZEN engaged with
Biosphere e.g. 2 events of other
organisations
engaged in by ZEN;
e.g. Trees for
Tourism; National
Tree Day
POTENTIAL OR STATUS TEAM KPIS ZEN NOOSA COUNCIL**
PIPELINE PROJECTS TIMEFRAME STRATEGIE
If & when funding, S*
human resources or
opportunities arise
School engagement Run if TBC # ZENTAG Actively engaged
(e.g. active transport, resources with Noosa Council Schools
ZENDURO) found Move program
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 46
Page 47
# ZENTAG Actively engaged
with Noosa Lions Walking
Bus program
E-bike tours Run if TBC
resources
found
Electrify Noosa Develop if TBC
River resources
found
Any other Develop if TBC
opportunities that can resources
be funded and human found
resourced and that
are aligned with ZEN
Inc’s. strategic plan,
consistent with ZEN’s
objectives & subject to
a risk assessment.
*ZEN Strategies explained here
* ZEN Strategies
1.2.1 Promote transport initiatives that reduce greenhouse gas emissions
1.2.2 Encourage walking and cycling initiatives
1.2.3 Promote carbon capture technologies and initiatives to offset car travel
1.2.4 Review Noosa Council’s Transport Strategy and make recommendations
1.2.5 Review commitment to EV & Electrify Everything Expo.
1.2.6 Advocate for, and demonstrate, sustainable transport options for transport that reduce greenhouse gas emissions
1.3.1 Greater direct engagement initiatives with the Noosa Shire community
1.3.2 Develop online toolkits to facilitate energy transition and emissions reduction
1.3.3 Effectively disseminate information through ZEN Inc’s website and other communication channels.
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 47
Page 48
**Noosa Council Themes explained here
Theme 1: Strong leadership and governance
1.1 Mobilise community for climate action
1.2 Action for low carbon economy & resilient community
1.3 Council is a powerful influencer for climate action
Theme 2: Energy efficiency and renewable energy
1.3 Develop a climate aware and empowered community for reducing climate risks & emissions
Theme 3: Clean low emissions industries
3.1 …..shift to clean, green low emission industries & technology
3.2 ….. Facilitate emissions reduction & environmental sustainability for
local businesses
Theme 4: Sustainable Transport
4.1 Accelerate public & active transport infrastructure investment & community usage through the implementation of Council’s Transport Strategy and
Walking and Cycling Plan.
4.2 Transition Council & community to sustainable transport use
and zero-emissions vehicles
Theme 5: Healthy & resilient natural systems & carbon drawdown
5.1 Increase revegetation, restoration & urban greening, reduce urban heating
Theme 6: Sustainable agriculture and food systems
6.3 Support agri-businesses & landholders to:
a. Take up opportunities for income generation through carbon drawdown
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 48
Page 49
Theme 7: Resilient & adaptive communities &
built environments
7.1 Create a resilient built environment for householders, businesses, vulnerable people, property & infrastructure
7.2 Build community awareness & preparedness for climate change & extreme weather events
C. Noosa Council Economic Development Strategy 2021-2030: Outcomes & Benefits relevant to the ZENTAG Working Group Action Plan
1. Infrastructure accelerates industry development and Smart Precincts
2. Enhancing our natural assets with technology driving valu
2025 EV & Electrify Everything Workplan - Appendix G -
2025 Expo Workplan 26 June RH
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 49
Page 50
P&L For Jan. – Dec., 2025 Appendix H
Profit and Loss
Zero Emissions Noosa Inc
For the year ended 31 December 2025
Cash Basis
Account 2025
Trading Income
Donations 2,075.26
Exhibitor Fees 15,600.00
179,936.1
Grant Funding
8
Interest Income 2,299.44
Member Fees 2,048.55
Sponsorship 60,000.00
261,959.4
Total Trading Income
3
Cost of Sales
Grant Associated 178,814.4
Expenses 5
178,814.4
Total Cost of Sales
5
Gross Profit 83,144.98
Operating Expenses
Advertising 48.75
Bank Fees 26.48
Consulting & Accounting 2,150.00
Credit card surcharge
0.42
fees
General Expenses 223.05
Membership Fees (43.90)
Subscriptions 637.68
Superannuation 8,400.84
Wages and Salaries 71,734.79
Workcover 200.86
Total Operating
83,378.97
Expenses
Net Profit (233.99)
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 50
Page 51
Heidi- Insert Excel sheet P & L by Project here.
Appendix I
Zero Emissions Noosa Inc. | Operational Report 2025 | Page 51
Page 52
Appendix J
Balance Sheet
Balance Sheet
Zero Emissions Noosa Inc
As at 31 December 2025
Cash Basis
Account 31 Dec 2025
Assets
Bank
Business Account 236,338.11
Debit Card Account 962.42
Public Fund Account 2,366.35
Total Bank 239,666.88
Total Assets 239,666.88
Liabilities
Current Liabilities
GST 12,359.51
PAYG Withholdings
1,766.00
Payable
Rounding 0.10
Superannuation Payable (93.49)
Suspense (2,293.51)
Wages Payable - Payroll (3,221.58)
Total Current Liabilities 8,517.03
Total
8,517.03
Liabilities
Net Assets 231,149.85
Equity
Current Year Earnings (233.99)
Retained Earnings 231,383.84
Zero Emissions Noosa Inc. | Operational Report 2025 · Page 28
Page 53
Appendix K
Association Report
ZERO EMISSIONS NOOSA INC
For the year ended 31 December 2025
Zero Emissions Noosa Inc. | Operational Report 2025 · Page 28
Page 54
Contents
3 Committee's Report
4 Income and Expenditure Statement
5 Assets and Liabilities Statement
6 Notes to the Financial Statements
7 True and Fair Position
8 Auditor's Report
Association Report ZERO EMISSIONS NOOSA INC Page 3 of 9
Zero Emissions Noosa Inc. | Operational Report 2025 · Page 28
Page 55
Committee's Report
ZERO EMISSIONS NOOSA INC
For the year ended 31 December 2025
Committee's Report
Your committee members submit the financial report of Zero Emissions Noosa Inc for the
financial year ended 31 December 2025.
Operating Result
The surplus for the financial year amounted to: $15,167.
Going Concern
This financial report has been prepared on a going concern basis which contemplates
continuity of normal business activities
and the realisation of assets and settlement of liabilities in the ordinary course of
business. The ability of the association to
continue to operate as a going concern is dependent upon the ability of the association
to generate sufficient cashflows from
operations to meet its liabilities. The members of the association believe that the going
concern assumption is appropriate.
Signed in accordance with a resolution of the Members of the Committee on:
_______________________
(President)
Date / /
_______________________
(Treasurer)
Date / /
Association Report ZERO EMISSIONS NOOSA INC Page 4 of 9
Zero Emissions Noosa Inc. | Operational Report 2025 · Page 28
Page 56
Income and Expenditure Statement
ZERO EMISSIONS NOOSA INC
For the year ended 31 December 2025
2025 2024
Income
Interest Income 2,299 2,039
Grants 174,044 190,492
Donations 2,075 7,361
Exhibitor Fees 14,250 9,436
Membership 2,092 1,789
Sponsorship 68,750 45,000
Total Income 263,512 256,118
Total Income 263,512 256,118
Cost of Sales
Project/Grant Expenses
Projects Other 164,974 109,708
Total Project/Grant Expenses 164,974 109,708
Total Cost of Sales 164,974 109,708
Gross Surplus 98,538 146,410
Expenditure
Audit Fees 550 500
Bank Fees 26 19
Consultant Fees 1,600 3,086
General Expenses 275 231
Insurance 201 657
Office Expenses - 325
Superannuation 8,401 5,405
Wages and Salaries 71,735 50,600
Subscriptions 583 696
Total Expenditure 83,371 61,519
Current Year Surplus/ (Deficit) 15,167 84,891
Association Report ZERO EMISSIONS NOOSA INC Page 5 of 9
Zero Emissions Noosa Inc. | Operational Report 2025 · Page 28
Page 57
Assets and Liabilities Statement
ZERO EMISSIONS NOOSA INC
As at 31 December 2025
NOTES 31 DEC 2025 31 DEC 2024
Assets
Current Assets
Cash at Bank 236,338 241,859
Public Fund Account 2,366 2,306
Direct Debit Account 962 410
Sundry Debtors 27,775 26,116
Total Current Assets 267,442 270,691
Total Assets 267,442 270,691
Liabilities
Current Liabilities
Sundry Creditors 1,496 16,721
GST Payable 12,295 13,554
GST on Creditors (136) (1,520)
GST on Debtors 2,525 2,374
PAYG Withholdings Payable 1,766 1,852
Employee Entitlements 1,943 1,451
Wages Payable - Payroll (3,222)
Total Current Liabilities 16,667 34,431
Total Liabilities 6,667 34,431
Net Assets 250,775 236,260
Member's Funds
Capital Reserve 250,775 236,260
Total Member's Funds 250,775 236,260
Association Report ZERO EMISSIONS NOOSA INC Page 6 of 9
Zero Emissions Noosa Inc. | Operational Report 2025 · Page 28
Page 58
Notes to the Financial Statements
ZERO EMISSIONS NOOSA INC
For the year ended 31 December 2025
1. Summary of Significant Accounting Policies
The financial statements are special purpose financial statements prepared in order to
satisfy the financial reporting requirements of the Associations Incorporation Act QLD.
The committee has determined that the association is not a reporting entity.
The financial statements have been prepared on an accruals basis and are based on
historic costs and do not take into account changing money values or, except where
stated specifically, current valuations of non-current assets.
The following significant accounting policies, which are consistent with the previous
period unless stated otherwise, have been adopted in the preparation of these financial
statements.
Cash on Hand
Cash on hand includes cash on hand, deposits held at call with banks, and other short-
term highly liquid investments with original maturities of three months or less.
Revenue and Other Income
Revenue is measured at the fair value of the consideration received or receivable after
taking into account any trade discounts and volume rebates allowed. For this purpose,
deferred consideration is not discounted to present values when recognising revenue.
Interest revenue is recognised using the effective interest method, which for floating rate
financial assets is the rate inherent in the instrument. Dividend revenue is recognised
when the right to receive a dividend has been established.
Grant and donation income is recognised when the entity obtains control over the funds,
which is generally at the time of receipt.
If conditions are attached to the grant that must be satisfied before the association is
eligible to receive the contribution, recognition of the grant as revenue will be deferred
until those conditions are satisfied.
All revenue is stated net of the amount of goods and services tax.
Goods and Services Tax (GST)
Revenues, expenses and assets are recognised net of the amount of GST, except where
the amount of GST incurred is not recoverable from the Australian Taxation Office
(ATO). Receivables and payables are stated inclusive of the amount of GST
receivable or payable. The net amount of GST recoverable from, or payable to, the ATO
is included with other receivables or payables in the assets and liabilities statement.
Association Report ZERO EMISSIONS NOOSA INC Page 7 of 9
Zero Emissions Noosa Inc. | Operational Report 2025 · Page 28
Page 59
True and Fair Position
ZERO EMISSIONS NOOSA INC
For the year ended 31 December 2025
Annual Statements Give True and Fair View of Financial Position and Performance of
the Association
We, and , being members of the committee of Zero
Emissions Noosa Inc, certify that –
The statements attached to this certificate give a true and fair view of the financial
position and performance of Zero Emissions Noosa Inc during and at the end of the
financial year of the association ending on 31 December 2025.
Signed:
Dated: / /
Signed:
Dated: / /
Association Report ZERO EMISSIONS NOOSA INC Page 8 of 9
Zero Emissions Noosa Inc. | Operational Report 2025 · Page 28
Page 60
Auditor's Report
ZERO EMISSIONS NOOSA INC
For the year ended 31 December 2025
Independent Auditors Report to the members of the Association
We have audited the accompanying financial report, being a special purpose financial
report, of Zero Emissions Noosa Inc (the association), which comprises the committee’s
report,the assets and liabilities statement as at 31 December 2025, the income and
expenditure statement for the year then ended, cash flow statement, notes comprising a
summary of significant accounting policies and other explanatory information, and the
certification by members of the committee on the annual statements giving a true and
fair view of the financial position and performance of the association.
Committee’s Responsibility for the Financial Report
The committee of Zero Emissions Noosa Inc is responsible for the preparation and fair
presentation of the financial report, and has determined that the basis of preparation
described in Note 1 is appropriate to meet the requirements of the Associations
Incorporation Act QLD and is appropriate to meet the needs of the members. The
committee’s responsibility also includes such internal control as the committee
determines is necessary to enable the preparation and fair presentation of a financial
` report that is free from material misstatement, whether due to fraud or error.
Auditor’s Responsibility
Our responsibility is to express an opinion on the financial report based on our audit. We
have conducted our audit in accordance with Australian Auditing Standards. Those
standards require that we comply with relevant ethical requirements relating to audit
engagements and plan and perform the audit to obtain reasonable assurance whether
the financial report is free from material misstatement.
An audit involves performing procedures to obtain audit evidence about the amounts and
disclosures in the financial report. The procedures selected depend on the auditor’s
judgment, including the assessment of the risks of material misstatement of the
financial report, whether due to fraud or error. In making those risk assessments, the
auditor considers internal control relevant to the association’s preparation and fair
presentation of the financial report, in order to design audit procedures that are
appropriate in the circumstances, but not for the purpose of expressing an opinion on the
effectiveness of the association’s internal control. An audit also includes evaluating the
Zero Emissions Noosa Inc. | Operational Report 2025 · Page 28
Page 61
appropriateness of accounting policies used and the reasonableness of
accounting estimates made by the committee, as well as evaluating the overall
presentation of the financial report.
We believe that the audit evidence we have obtained is sufficient and appropriate to
provide a basis for our audit opinion.
Opinion
In our opinion, the financial report presents fairly, in all material respects (or gives a true
and fair view –refer to the applicable state/territory Act), the financial position of Zero
Emissions Noosa Inc as at 31 December 2025 and (of) its financial performance
for the year then ended in accordance with the accounting policies described in Note 1 to
the financial statements, and the requirements of the Associations Incorporation Act
QLD.
Basis of Accounting and Restriction on Distribution
Without modifying our opinion, we draw attention to Note 1 to the financial statements,
which describes the basis of accounting.
The financial report has been prepared to assist Zero Emissions Noosa Inc to meet the
requirements of the Associations Incorporation Act QLD. As a result, the financial report
may not be suitable for another purpose.
Auditor’s signature: Louise McNeich
Auditor’s address: PO Box 563, Cooroy Qld 4563
Auditor's Report
Association Report ZERO EMISSIONS NOOSA
Zero Emissions Noosa Inc. | Operational Report 2025 · Page 28