Skip to the record
The only place to find full transcripts.

Original source · versioned page text

4325Planning Report

Attached to the e-mail IDAS Forms, consent & report- Email 1 of 2 MCU17/0028 OPW17/0120 REC17/0012.

of 28

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

The ingress and egress of the proposed driveways is in a forward direction and the
driveways will be constructed in accordance with the Standards and clear of existing
services.

7.7 Specific Outcomes and Solutions for the Earthworks Code

The slope, aspect and conditions of the site provide that earthworks will be confined
to footing construction, location of services, driveways and landscaping. The
implementation of the normal Conditions of approval will alleviate any possible
impacts of the earthworks.

7.8 Specific Outcomes and Solutions for the Erosion and Sediment Control
Code

The 10% slope of the site towards the rear boundary, the relatively minimal
earthworks and the absence of adjacent waterways provide for no unexpected issues
with respect to erosion and sediment.

The implementation of the normal Conditions of approval will alleviate any possible
impacts of the site works.

7.9 Specific Outcomes and Solutions for the Existing Services Code

All necessary services are currently connected to the property; and the proposal
does not require the re-location of any services.

7.10 Specific Outcomes and Solutions for the Transport, Roads and Drainage
Code

Both Tewantin Road and Olivine Lane are good quality bitumen roads; with a
pathway and kerb & channelling in place along the Tewantin Road frontage.

The stormwater from the site and the houses is able to drain to the existing
stormwater system in Olivine Lane.

7.11 Specific Outcomes and Solutions for the Waste Management Code

i is proposed that the bin areas are located within the common property between the
jouses.

The development is expected to generate the normal amount of waste for a
residential property.
Log in to download the original file

4325Planning Report.pdf · 11.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.