Skip to the record
Noosa’s premier civic archive.

Council archive · source document

OPW10/2167 Development Application part 2 of 2 Plans 28 Park Crescent Sunshine Beach

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                       Description
 DRAWING SIZE' - A2


                                   PARK ORES.                                                                                 PARK ORES.


                                                                                                                                                                                                                               CONSTRUCTION NOTES
                                                                                                                                                                                                                               GENERAL
                                                                                                                                                                                                                               1. Do not scale from this drawing.
                                                                                                                                                                                                                               2. AL d'mensbm in mA'metres
                                                                                                                                                                                                                               3. Setting out dimensions are to be obtained from the architectural
                                                                                                                                                                                                                               drawings
                                                                                                                                                                                                                               4. Any discrepancies between these drawing and the architectural drawings
                                                                                                                                                                                                                               are to be refined to the engineer immediately.
                                                                                                                                                                                                                               5 The bolder is responsible for locating all existing services ethn and
                                                                                                                                                                                                                               odpcet the allotment and shall ensure that all new works are In
                                                                                                                                                                                                                               accordance with the attached critical depth 6e diagram.
                                                                                                                                                                                                                               FOOTPATHS AND DRIVEWAYS:
                                                                                                                                                                                                                               1. Existing footpat s to be new at poor to removal
                                                                                                                                                                                                                               2 Crossings are not designed for commercial vehicles
                                                                                                                                                                                                                               3. Comte driveway to be 125mm tW excluding my Pmloed fredaants,
                                                                                                                                                                                                                               eg st-ON
                                                                                                                                                                                                                               4. Concrete surface
                                                                                                                                                                                                                                               face tolerance FSOmm over 3.0m
                                                                                                                                                                                                                               5, Concrete 1432 in aroordmce with AS 1379 and AS 3600
                                                                                                                                                                                                                               6. Reinforcement fabric to AS 1304, placed central skit depth
                                                                                                                                                                                                                               7. Expansion joints to be 10Yrr1 wide wet tooled with my 2sd mesh
                                                                                                                                                                                                                               wire cut along Joint.
                                                                                                                                                                                                                               & One cram point permitted far each allotment
                                                                                                                                                                                                                               9. For roved drewap, maunm Wades apply to inside edge of arse
                                                                                                                                                                                                                               10. Al services to be located and protected as replied prior to work
                                                                                                                                                                                                                               aronendy
                                                                                                                                                                                                                               it. Sub7ode to how a minimum bewky capacity of 1OpPe
                                                                                                                                                                                                                               FIWNG NOTES
                                                                                                                                                                                                                               -The site is to be scraped dew of at organic material ad debuts
                                                                                                                                                                                                                                   .he *Egnde is to be tarepated and proof ruled with a vibrating
                                                                                                                                                                                                                               steel drum rater. The compaction is to be sufficient to achieve a blow
                                                                                                                                                                                                                               amt of 7 blows per 300nm with an approved Perth Sand Penetrometer
                                                                                                                                                                                                                               for o depth of 1.0n below esoaoted led Copies of compaction lad
                                                                                                                                                                                                                               resits Ad be presented to SCC Consulting Engineers for approval
                                                                                                                                                                                                                               - Upon the written approval of the ngrade preparations by SCG
                                                                                                                                                                                                                               ComitillkV Engineers
                                                                                                                                                                                                                                 the allotment is to be led to the specified levels.
                                                                                                                                                                                                                               - The fi material does grads material (ie sad to o dopy sand in
                                                                                                                                                                                                                               accordance with AS1726) be free of my organic material and have a day
                                                                                                                                                                                                                               content of less than 12% (Plasticity odes less than 25X, lien shrinkage
                                                                                                                                                                                                                               of I51). The proposed material is to be inspected by SCG Consulting
                                                                                                                                                                                                                               Engineers prior to its removal to ensue its compatibility,
                                                                                                                                                                                                                               - Any fill or base course material is to be placed and compacted in
                                                                                                                                                                                                                               accordance with AS3798-2007 to a level sufficient to achieve o Level 1
                                                                                                                                                                                                                               certification with a minnem relative held density of 95X Copies of
                                                                                                                                                                                                                               compaction tat results shall be presented to SCC Consulting Engineers
                                                                                                                                                                                                                               for approval
                                                                                                                                                                                                                               - Fling and compacting od)xent existing structures is to be in strict
                                                                                                                                                                                                                               accordance with the associated details and specificatiom
                                                                                                                                                                                                                               - Area where esistky structures or trees are removed shat be bocklited
                                                                                                                                                                                                                               with the approved fill material compacted In accordance with
                                                                                                                                                                                                                               AS3798-2007 to achieve o minimum relative field density of 95X
                                                                                                                                                                                                                               - Any base or soft material uncovered in the site preparation that be
                                                                                                                                                                                                                               removed and replaced with the approved fill material compacted in
                                                                                                                                                                                                                               accordance with AS3798-2007 to achieve o minimum relative fold
                                                                                                                                                                                                                               density of 951
                                                                                                                                                                                                                               - Site drainage and sit protection measures nut be installed prior to
                                                                                                                                                                                                                               construction caanenckp
                                                                                                                                                                                                                               PAVEbL11T NOTES
                                                                                                                                                                                                                               1. Prior to placement of pavement material the sbgrode is to be
                                                                                                                                                                                                                               stripped to level. Any organic matter or debris is to be removed and
                                                                                                                                                                                                                               replaced with approved compacted material. The subpade that be proof
                                                                                                                                                                                                                               rolled to a minimum of 98% dry density as detemned by compaction
                                                                                                                                                                                                                               testing it occadaxe with AS1289
   SITE PLAN N PROPOSED SILT & SEDIMENT CONTROL PLAN                                                       SITE PLAN N STORMWATER DRAINAGE                                                                                     2 Pavement materiab shat comply with the following main roods
                                                                                                                                                                                                                               dpwMsnt specification WS11.05:
   (Scale 1 : 200)                                                                                          (Scale 1 : 200)                                                                                                          - Bose course to consist of aggregate type 236 Oraang B or C
                                                                                                                                                                                                                               3, Pavement material that be extended a mriam of 156m beyond
                                                                                                                                                                                                                               the edge of dive and that be a mnirum of 100mm thick U.N.O.
                                                                                                                                                                                                                               4. Base and wit-base courses we to be compacted in byes not
                                                                                                                                                                                                                               exceeding I50mm in thidness to o hieve 95% dry deity or greater with
                                                                                                                                                                                                                               one lest per 200mm tf ees of each lute.
                                                          -- FMA.E 11t WW r101€ Pie 6 PA01EC1ED                                                                                                                                5. Al compaction testing resits to be presented to Be engineer far
                                                          1111 AN APPROED LEAF 110 S110.lt
                                                          - WE PIT .LIST E ahPPW N QQABt 01011                                                                                                                                 approval prior to proceeding to the rod stage of construction.
                                                          AS SPECIFIED.
       LEGEND                                             - Of PIT MU E BA0B1hl9(D ON A
                                                          REOA/A 8A tS fS MrT6) TO Pllq^( ANY A1S
                                                          tRM hRW
                                                          - 1( P11 9010 ONLY E USED FOR 1(
                                                                                                                                  Pine Grid at Base                                                                          I ssue:
               INDICATES EXISTING SURFACE                 DISPOSAL OF 5701mAIER
                                                                                                                                                                                                                                           CONSTRUCTION
BpO'           CONTOUR AND LEVEL TO AHD.
                                                                                                                                                                                                                             - - CONSULTING
        p, O   INDICATES PROPOSED FINISHED SPOT
                                                                                                                                                                                                10 SI M AMRthED at KMM
               SURFACE LEVELS TO AHD.                                                                                                                                          IDaES PM N CCe1DICNC Art EMD     esS lot
                                                                                                                                                                               Ma 610 E C0611WID NOS At WOW

       FAIL    INDICATES DIRECTION OF FALL                                                                                                                                     saKNm Nr E1leeo IP WE 0101ES TO Bala
                                                                                                                                                                               M ST IO1LR ENTRAP" OWNS MW 11141111           1/11 PROJECT AVE NOOSAVILLE OLD 4566
               IN FINISHED SURFACE                                                                                                                                             PEAK N NDOI1g1 "I SLIM TIES 1C FDIQ
                                                                                                                                                                               NO 9W1 Wit (Nest IECNwJNw6 NlOWITS 180.61
                                                                                                                                                                                                                             Ph (07) 5455 5604                         Fax (07) 5455 5696
                                                                                                                                                                               1)t USE OF MACE KKK OR SCOUR PROACRD
                                                                                                                                                                               SINK Dt FDICE weST OD" N PUk WIL 90
  _ SILT _ SILT RETENTION FENCE TO DETAIL                                                                                                                                      TPa 1)401 PNOt0 LANDSCAPING NO SRAM X EASES   Title:        Operational Works Plan.
                                                                                                                                                                               ARE e61NLLD

               150 THK. DRIVEWAY SLAB ON COMPACTED                                                                                                                                                                           Project        28 Park Cres
        DS     MATERIAL, SL92 MESH, TOP 40 COVER,                                                                                                                                                                                           Sunshine Beach
                                                                                    STORMWATER SOAKER PIT DETAIL                                      SILT RENTENTION FENCE DETAIL
               FLEXIBLE JOINT AGAINST MASONRY/CONCRETE.                                                                                                                                                                      Date:      Oct 2010               Drg No. 20221 -OW

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW10_2167 Development Application part 2 of 2 Plans 28 Park Crescent Sunshine Beach.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.