If any soil conditions encountered during construction are found to differ from those discussed in this
report, ASI and Tectonic should be notified immediately, and an inspection carried out to determine if
changes to footing design are required.

4.4        Retaining Structures
Retaining structures must be founded as per the recommendations in Section 4.3 above. Retaining
structures greater than 1 m high, or those required to support surcharge loads or sloping backfill, will
require engineer design and certification of construction. Retaining wall design should be carried out in
accordance with AS4678-2002 Earth retaining structures.
The parameters outlined in Table 3 may be adopted for retaining wall design. The values in Table 3
assume that the walls are fully drained, and no allowance is included for hydrostatic pressures,
construction loading, up-slope footing loadings, the effects of sloping ground and backfill compaction
stresses. Any temporary shoring required to support excavations during construction may also be
designed using the parameters in Table 3.
Table 3: Retaining Structure Design Parameters
                                                                   Lateral earth pressure coefficients
                       Unit weight           Friction angle Ø      Ka                       Ko              Kp
 Retained material
                       (kN/m3)               (°)                   (Cantilever wall)        (Non-yielding
                                                                                            wall)

 Loose Sands           17                    28                    0.36                     0.53            2.77


 Medium Dense (or      18                    33                    0.29                     0.46            3.39
 Denser) Sands

 Future Fill           *                     *                     *                        *               *


Note:    * depends on fill material type and level of compaction

At a minimum, retaining structures must be founded as per the recommendations in Section 4.3 above
with the footings also designed to account for lateral loads imposed by the retaining wall. Detailed
design must include an assessment of internal and global stability, together with required bearing
capacity and founding depth, by the retaining wall design engineer.

4.5        Drainage
Given the sandy nature of the site, rainfall is generally expected to rapidly infiltrate any unsealed surfaces.
If necessary, diversion drainage should be constructed to divert seepage and/or runoff away from the
building area to prevent saturation and erosion.
Permanent site drainage must be installed to ensure that stormwater runoff is directed away from
proposed building walls, footings and retaining walls (e.g. positive gradients and/or channel drains).
Future building and landscaping must be carried out to maintain good drainage.
Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in
filter ‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and
site-specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to
be accounted for in the design of the retaining structure.




20 November 2025
25364-001-Rev0                                                                                                     11 of 12

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

25364-001-Rev0 Duke St.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.