Skip to the record
Beware of cheap imitations.

Original source · versioned page text

11. Appendix H - Traffic Impact Assessment

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 33, section 1. The text section number identifies this passage in the reader.

                                                                  2                                                                                 1                                                                                                                                                                 3
                                                               A-DA-1200                                                                        A-DA-1200                                                                                                                                                       A-DA-1200

                                                                                                                         SITE BOUNDARY



                                                                                                                                                                                                                                                                                                                                        RL 9.0




                                                                 2x HRV LOADING


                                                                                                                                         CUSTOMER CARPARKING

                                            RL 6.5
                            SITE BOUNDARY




                                                                                                                                                                                                                                                                                                    RL 8.8




                                            RL 6.0




                                                                                                                                                                                                                                                                                       RL 8.8




                                                                                                                                                    HOFM
                                                                                                                                                               ANN
                     12.5
                                                                                                                                                                       DRIV
                                                                                                                                                                           E
                                                                 EXTENSION OF EXISTING PEDESTRIAN CONNECTON INTO
                                                                 PROPOSED DEVELOPMENT                                                                                                                   PROPOSED MAIN CARPARK ENTRY/ EXIT &                                             CONCEPT DRAWING.
  2.4          5.9               1.4                                                                                                                                                                    SERVICE ENTRY/ EXIT                                                            FOR DISCUSSION ONLY .
HRV - Heavy Rigid Vehicle
Overall Length                                       12.500m
Overall Width                                        2.500m
                                                                 PROPOSED SECONDARY CARPARK ENTRY/ EXIT & TENANCY                                                                                                                                                                      0        5     10      15       20     25m
Overall Body Height                                  4.300m
Min Body Ground Clearance                            0.417m
Track Width                                          2.500m      SERVICE ENTRY/ EXIT                                                                                                                                                                                                   1:500 @A3 (Approx.)
Lock to Lock Time                                    6.00s                                                                                                                                              BICYCLE PARKING
Kerb to Kerb Turning Radius                          12.500m                                                                                                                                                                                                                Approx.                                         CORE TO
                                                                                                                                                                                                        LOCATION (22 SPACES)
                                                                                                                                                                                                                                                                                                                            FUTURE DETAIL
                                                                                                                                                                 A    16.05.19   Report                                                                        MG      AD   PRELIMINARY BLU0517-01
                                                                  Proposed Retail Business (Type 4) Showroom                                                                                                                                                                NOT FOR CONSTRUCTION
        CAMBRAYconsulting                                                                                            20 Hofmann Drive                                                                                                                                                               SK03
        Traffic Engineering and Transport Planning                12.5m Heavy Rigid Vehicle (12.5m HRV) Swept Path
                                                                                                                     Noosaville, QLD
                                                                                                                                                                 This concept takes into account the instructions and requirements of our client. Cambray has taken care
        Suite 2601, 21 Mary Street Brisbane Q 4000                                                                                                               in preparing this concept, however it neither accepts liability nor responsibility whatsoever in respect   16.05.2019 1:500        Blueprint Group Australia Pty Ltd
        t : 07 3221 3503 | e : [email protected]                                                                                                            of; any use of this document by any third party, any third party whose interests may be affected by any
                                                                                                                                                                 decision made regarding the contents of this document and/or any conclusion drawn resulting from
                                                                                                                                                                 omission or lack of full discloser by the client or the client's consultants.
Log in to download the original file

11. Appendix H - Traffic Impact Assessment.pdf · 6.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.