20 Hofmann Drive, Noosaville | Traffic Impact Assessment

1.2 Scope of Works
As part of preparing this report, we undertook the following scope of works:
     An assessment of the physical layout of the site from a traffic perspective, taking into
        consideration:
             o Vehicle access arrangements;
             o Carparking provision;
             o Carpark layout and on-site vehicle circulation arrangements; and
             o Servicing requirements and vehicle swept path analyses.
     A qualitative assessment of traffic impacts associated with the proposed development
        compared to the previous approval; and
     A comparative review of the proposed development against the current Home Improvement
        Store and Retail Business development approval (Previous Approval).

The results are outlined in the following sections.


1.3 Limits of Report
This report takes into account the particular instructions and requirements of our client. Cambray
Consulting Pty Ltd has taken care in the preparation of this report, however it neither accepts liability
nor responsibility whatsoever in respect of:
     Any use of this report by any third party;
     Any third party whose interests may be affected by any decision made regarding the contents of
        this report; and/or
     Any conclusion drawn resulting from omission or lack of full disclosure by the client, or the
        clients’ consultants.


1.4 Safety in Design
Within our scope, we have identified safety in design issues and potential hazards, whenever reasonably
practicable within our field of expertise. Due to our limited and upfront role on this project, it is not
reasonably possible to identify all potential hazards which may occur throughout the life of a project,
including during detailed design and construction activities. It is strongly recommended that safety in
design issues are reviewed during all ensuing design and construction stages of the project.


1.5 Qualifications
This report was prepared by:
     Andrew Douglas, Director – BE Civil (Hons), MSc Env Man, FIEAust, CPEng, RPEQ 6691; and
     Matt Grierson, Transport Engineer – BE Civil.




\\FILE\Projects\BLU0517\01\3. Deliverables\1. Reports\2.TIA 2019\TIA_20 Hofmann Drive, Noosaville.docx   Cambray Consulting Pty Ltd | Page 6
Log in to download the original file

11. Appendix H - Traffic Impact Assessment.pdf · 6.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.