Original source · versioned page text
11. Appendix H - Traffic Impact Assessment
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
20 Hofmann Drive, Noosaville | Traffic Impact Assessment 1.2 Scope of Works As part of preparing this report, we undertook the following scope of works: An assessment of the physical layout of the site from a traffic perspective, taking into consideration: o Vehicle access arrangements; o Carparking provision; o Carpark layout and on-site vehicle circulation arrangements; and o Servicing requirements and vehicle swept path analyses. A qualitative assessment of traffic impacts associated with the proposed development compared to the previous approval; and A comparative review of the proposed development against the current Home Improvement Store and Retail Business development approval (Previous Approval). The results are outlined in the following sections. 1.3 Limits of Report This report takes into account the particular instructions and requirements of our client. Cambray Consulting Pty Ltd has taken care in the preparation of this report, however it neither accepts liability nor responsibility whatsoever in respect of: Any use of this report by any third party; Any third party whose interests may be affected by any decision made regarding the contents of this report; and/or Any conclusion drawn resulting from omission or lack of full disclosure by the client, or the clients’ consultants. 1.4 Safety in Design Within our scope, we have identified safety in design issues and potential hazards, whenever reasonably practicable within our field of expertise. Due to our limited and upfront role on this project, it is not reasonably possible to identify all potential hazards which may occur throughout the life of a project, including during detailed design and construction activities. It is strongly recommended that safety in design issues are reviewed during all ensuing design and construction stages of the project. 1.5 Qualifications This report was prepared by: Andrew Douglas, Director – BE Civil (Hons), MSc Env Man, FIEAust, CPEng, RPEQ 6691; and Matt Grierson, Transport Engineer – BE Civil. \\FILE\Projects\BLU0517\01\3. Deliverables\1. Reports\2.TIA 2019\TIA_20 Hofmann Drive, Noosaville.docx Cambray Consulting Pty Ltd | Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.