Council archive · source document
Response to RFI Sewer & Water Network Plans · OPW25/0057
Plans and drawings: the text below has words only, no drawings.
Original PDF page 7, section 3. The text section number identifies this passage in the reader.
113
126
12
113
2 PROPOSED STORMWATER DRAINAGE
5
10 103
11
125
3 1ha 125
0
124
12
112
124
12
120
126
105
5
106
126 PROPOSED Ø150 PVC-O7 PN16 WATER MAIN
12
116
118
11
107
115
121
126
123
119
104 2
117
12
111
PROPOSED Ø150 UPVC SEWER MAIN
116
109
24
6
108
126
121
12
1
PROPOSED SEWER MAIN MAINTENANCE HOLE
123
8
11
114
125
110
111144
PROPOSED SEWER MAIN MAINTENANCE SHAFT
4
122
12
119
125
115
3
113
11
106
120
112
EXISTING UNDERGROUND STORMWATER DRAINAGE
124
126
126
127
120
125
127
127
114
117
6
106
111
EXISTING WATER MAIN
3
118
122
115
121
11
12
119
117
127
109
6
106
108
116
12 EXISTING COMMUNICATIONS CABLES
107
121
105
118
Shane Rynne
123
EXISTING OVERHEAD ELECTRICAL
114
I,............................................. of COVEY ASSOCIATES Pty. Ltd.
127
7
122
12
113
124
5
127
125
EXISTING SURFACE CHANGE OF GRADE
11
113
119
128 18-03-2025 123
124
125
112
120
128 ON............................, CERTIFY that: EXISTING SITE BOUNDARY
126
126
120
114
128
127
110
116
117
128
1. This design drawing has been assessed in accordance with
111
107
115
118
122
121
119
EXISTING TREES
117
requirements of the SEQ Code and Unitywater Standards;
121
108
109
116
107
118
2. The construction of the works must only be undertaken in
123
10
114
124
127
DESIGN SURFACE CONTOURS (1m INTERVALS)
123
accordance with this drawing; and
122
106
124
3. No design Amendments are permitted either before or 10
113
5
112
115INTERVALS)
EXISTING SURFACE CONTOURS (1m
8 12
12
113
during construction without the approval of Unitywater.
119
124
107
125
4. During construction, where required, Variation Notifications
107
120
126
6
120
12
8
127
117
12 must be submitted in accordance with the A&C Manual.
116
119
114
110
Check all dimensions before commencement of work.
NOTE:
124
118
122
115
121
Check Site boundary dimensions from the Title plans
111
117
121
127
ACR/MAJ
1 09
116
· REFER TO SHEET C620 FOR SCHEDULE OF LIVE 9 WORKS Check Building Boundary clearances by set See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to RFI Sewer & Water Network Plans.pdfRelated documentApplication case desk ↗