Original source · versioned page text
Part B - Attachments A to D
Attached to the e-mail Other Change Application – 132002.220285.5.
Specific Outcome Probable Solution Response
Retail Business 1 bicycle parking space per
Type 1 (if not a 50m2 or part thereof of gross
roadside stall) floor area.
Retail Business 1 bicycle parking space per
Type 2 100m2 or part thereof of
gross floor area.
Retail Business 1 bicycle parking space per
Type 3 100m2 or part thereof of
gross floor area.
Retail Business 1 bicycle parking space per
Type 6 100m2 or part thereof of
gross floor area.
Retail Business 1 bicycle parking space per
Type 7 100m2 or part thereof of
gross floor area.
S31.4 Bicycle parking spaces and cyclist facilities are
designed in accordance with AUSTROADS Guide to
Traffic Engineering Practice, Part 14 – Bicycles,
Section 10; AND
S31.5 On-site pedestrian facilities such as seating and
shade structures are provided in developments for
the convenience of persons walking to the site.
Site facilities
O32 Waste storage areas, external storage S32.1 Waste storage areas, external storage areas and R32 Complies
areas and loading docks do not loading docks are situated to the rear of the building
detract from the visual amenity of the or under the ground; Proposal incorporates internal storage areas for waste
streetscape or cause nuisance to management.
OR
adjoining properties.
S32.2 With the exception of the access way, waste storage
areas, external storage areas and loading docks are
visually screened by landscaping or fencing.
Environment & heritage values
O33 There are no significant adverse No solution provided R33 Complies
effects on the biodiversity, natural
vegetation, native wildlife, habitats, The development area which forms part of the site is sited
landscape quality, water quality or away from areas with significant environmental or heritage
heritage values, including those values. Limited fire risk is expected as the immediate
related to— surrounding area is cleared and paved for car parking.
a) changes to natural drainage; Waste water is appropriately managed via new on-site
drainage and treatment systems.
b) disturbance to any of the wetland
systems;
December 2017 Cardno 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.