Skip to the record
Accept no substitutions.

Original source · versioned page text

Appendix C - Code Assessment

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Reconfiguring a Lot Code



     g)    promotes a variety of streetscapes;
     h)    provides for a high level of amenity, having regard to
           potential noise, dust, odour and lighting nuisance
           sources;
     i)    integrates prominent site features including landmarks,
           native vegetation and views into the design;
     j)    discourages crime or antisocial behaviour by facilitating
           casual surveillance of streets, paths and public open
           space;
     k)    avoids the sporadic or out-of- sequence creation of lots;
           and
     l)    protects and enhances ecologically important
           areas and provides for the clustering of lots into cleared
           areas.

Infrastructure                                                            No acceptable outcome provided                                     PO10 – Complies
PO10                                                                                                                                         The future dwelling houses can be serviced by appropriate
Development accommodates and provides for the efficient and                                                                                  infrastructure having consideration to their rural residential setting.
timely delivery of infrastructure appropriate to the site’s setting and
intended use.

PO11                                                                      No acceptable outcome provided                                     PO11 – Not Applicable
Roadway and pathway layout are predominantly rectilinear with a                                                                              The development does not involve any roadways or pathways.
high degree of permeability.                                              Editor’s Note— Further detail on traffic and the road network is
                                                                          addressed in Part 9.4.8 Transport Code




Infrastructure services Table 9.5.1.3 Criteria for assessment (part)

Performance outcomes                                                      Acceptable outcomes                                                Assessment
Scenic amenity
Infrastructure and services

PO12                                                                      AO12.1                                                             AO12.1 – Complies
New lots are located, sized and configured so as to ensure each           All lots are connected to power supply and telecommunications      The sites will be contacted to power and telecommunications
lot is capable of being serviced by appropriate levels of                 services and where located within the Urban boundaries, power
                                                                                                                                             supply.
Log in to download the original file

Appendix C - Code Assessment .pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.