Reconfiguring a Lot Code



                                                                     Infrastructure Plan in Part 4 such as:

                                                                          a)    children’s play facilities catering for various ages
                                                                                including a soft fall surface where required and a shade
                                                                                cover over play equipment;
                                                                          b)    seating;
                                                                          c)    picnic table/s with seats; and
                                                                          d)    landscaping.

                                                                     Editor’s Note— Further detail on Landscaping is addressed in
                                                                     Part 9.4.5 Landscaping Code

PO19                                                                 AO19.1                                                                AO19.1 – AO19.3 – Not Applicable
Land provided for active recreation areas is of a physical           Active parkland is of a usable shape free of irregular boundaries.    The proposed development is not required to provide active
standard and condition suitable for the intended uses and is not                                                                           parkland.
subject to physical or other constraints including contamination,    AO19.2
environmental or biophysical constraints or legislative protection   Active parkland is located on land that is exclusive of—
that would encumber its use.
                                                                          a)    flood inundation below the 20% AEP (1:5
                                                                                year ARI level);
                                                                          b)    land affected by stormwater or overland flow
                                                                                discharge from adjacent allotments;
                                                                          c)    drainage reserves and detention basins, which cannot
                                                                                be shown to safely and effectively contribute to the
                                                                                network of parks and open space areas;
                                                                          d)    land with a slope, or subject to cut or fill with a
                                                                                batter slope, that exceeds a slope of 15%;
                                                                          e)    areas of land less than 15 metres wide, such
                                                                                as access and service and utility easements;
                                                                          f)    land required to serve primarily as a buffer area to any
                                                                                existing development or major transport corridor; and
                                                                          g)    power easements.

                                                                     AO19.3
                                                                     At least 10% of the total open space provision for active parkland
                                                                     is exclusive of flood inundation below the 1% AEP (1:100
                                                                     year ARI level or the highest recorded flood level), whichever is
                                                                     the greatest.
Log in to download the original file

Appendix C - Code Assessment .pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.