Original source · versioned page text
Appendix C - Code Assessment
Reconfiguring a Lot Code
a) maintains the natural flow regime; 9.4.9 Water Quality and Drainage code
b) effectively manages stormwater quality and quantity;
and
c) ensures no adverse impacts on receiving waters and
surrounding land.
Conflicting land uses Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
Conflicting land uses
PO25 PO25 – Complies
New lots for residential development do not adjoin land located in No acceptable outcome provided
the Medium impact industry zone or the Low impact The site does not adjoin industrial land.
industry zone.
Rearrangement of Lot Boundaries Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
Rearrangement of Lot Boundaries
PO26 AO10 – Not Applicable
Development provides that the rearrangement of lot boundaries AO26
is an improvement on the existing situation. The rearrangement of lot boundaries results is an improvement to
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.