Appendix C - Code Assessment
Biodiversity, Waterways and Wetlands Overlay Code
d) ecological linkages and ecologically important areas are
secured by environmental covenant or transferred to
public ownership or through gazettal of a nature reserve.
Management of impacts Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable solutions Assessment
Management of Impacts
PO3
Development is designed and sited to manage adverse impacts AO3.1
AO3.1 – Not Applicable
on ecologically important areas by: Where clearing of vegetation cannot be practicably avoided, the
development: No vegetation clearing will occur as a result of the proposed
a) minimising the total footprint within which all activities, development.
buildings, structures driveways and other works are a) ensures the design and siting limits the loss of vegetation to
contained; the smallest extent possible;
b) locating development in existing cleared areas or areas of b) protects and retains ecological values and ecosystem
low ecological value over other areas to the greatest processes to the greatest extent possible within and
extent possible; and adjacent to the site;
c) incorporating siting and design measures to protect and c) provides measures to allow for safe movement of fauna
retain ecological values and ecosystem processes within through the site; and
or adjacent to the development site; and d) provides suitable habitat replacement and replanting in
d) where adverse impacts have been minimised, any accordance with PSP3 Ecological Assessment
residual impacts on ecological values are Guidelines.
compensated for through suitable habitat
replacement and replanting on site in the first AO3.2 AO3.2 – Complies
instance or in a way that results in a net gain and Habitat trees, recruitment habitat trees, and roosting, breeding The proposed development will not interfere with any habitat
enhancement of the overall habitat values of Noosa and feeding areas are protected for native fauna habitat. trees.
Shire.
PO4 AO4.1 AO4.1 - Complies
Development provides for effective measures during Vegetation is protected from disturbance or damage from The development would ensure that all native vegetation on the
construction and operation to protect ecological values including: construction and operation activities by: site is protected from disturbance.