Original source · versioned page text
Appendix C - Code Assessment
Biodiversity, Waterways and Wetlands Overlay Code
effects. a) no new lots directly back onto a riparian buffer area; and
b) new public roads are located between a riparian buffer
area or riparian zone and the proposed development area.
Water hydrology Table 8.2.2.3. - Criteria for assessable development (part)
Performance outcomes Acceptable solutions Assessment
Surface and ground water hydrology
PO9 AO9.1 AO9.1 – Complies
Development ensures that the natural surface water and ground Development does not impact on the natural surface water or The proposed subdivision does not propose any works that
water hydrologic regimes of waterways, wetlands and groundwater hydrologic regimes and this is facilitated by: would impact on the hydrologic regime on the property.
hydrologically-sensitive plant communities are not adversely
impacted. a) avoiding or minimising channelization, redirection or
interruption of flow;
Editor's Note—Groundwater dependent ecosystems are b) avoiding groundwater extraction;
identified on Queensland Government WetlandInfo mapping. c) maintaining groundwater recharge and discharge
processes;
d) maintaining natural groundwater fluctuations;
e) avoiding causing ingress of saline water into freshwater
aquifers of wetlands; and
f) avoiding contaminants entering groundwater (e.g. from
runoff, effluent disposal).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.