Original source · versioned page text
Appendix C - Code Assessment
Flood Hazard Overlay Code
b) increase the number of people likely to need evacuation; place. Consequently the proposed subdivision would not unduly
c) shorten flood warning times for other uses in the floodplain; burden disaster management or response capabilities.
or
d) impact on the ability of traffic to use evacuation routes, or
unreasonably increase traffic volumes on evacuation
routes.
AO7.3
Materials stored on site:
a) are readily able to be moved in a flood event to a flood free
area; or
b) are contained in order to minimise movement in times of
flood.
Editor's Note— Businesses should ensure that necessary
emergency and continuity plans are in place to account for the
potential need to evacuate personnel and to relocate property
prior to a flood event.
Essential network infrastructure
PO8 AO8 AO8 – Not Applicable
Essential network infrastructure maintains effective function Essential network infrastructure that is likely to fail to function or
during and immediately after flood and storm tide inundation may result in contamination when inundated by flood water (e.g.
events.
water supply pipeline air valves and the like) is located above
the DFE level (or where the DFE has not been modelled for the
area, above the highest recorded flood level for the area).
Essential community infrastructure
PO9 AO9.1 AO9.1 – Not Applicable
Essential community infrastructure is able to function effectively Essential community infrastructure is sited and constructed to
during and immediately after flood events. ensure that flood levels comply with flood immunity requirements
specified in Table 8.2.6.4.
AO9.2
AO9.2 – Not Applicable
Essential community infrastructure which is located below the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.