Original source · versioned page text
Attachment B Geotechnical report
Attached to the e-mail MCU14/0084 Attachment B (3) Geotechnical Report Email 3 of 4.
me BRISBANE Unit 1/35 Limestone Street PO Box 3063 Darra Qld 4076 P: 07 3279 0900 F: 07 3279 0955 [email protected] MORRISON GEOTECHNIC PTY LTD www.morrisongeo.com.au GOLD COAST PO Box 2011 Nerang Qld 4211 P: 07 5596 1599 F: 07 5527 2027 Unit 5 / 36 Lawrence Drive [email protected] m CABOOLTURE Unit 3 / 42 Aerodrome Road Caboolture Qld 4510 P: 07 5499 0755 F: 07 5428 2498 [email protected] m SUNSHINE COAST Unit 4/81 Wises Road Maroochydore Qld 4558 MORRISON P: 07 5443 9522 F: 07 5479 1633 GEOTECHNIC maroochydorelab@ ABN 51 009 878 899 morrisongeo.com.au RPEUQ 2241 Dynamic Probing Log Dynamic Probe: DP3 Page: 1 of 1 Client: Mr Adrian Slinger Test Date: 21st Sept 2009 Job Number: ME09/068 Test Method: Dynamic Probing Project: Proposed Residence Testing Rig: Dando Terrier Location: Seaview Terrace, Sunshine Beach Logged By: M.Rubinic Lot Not No. 71 Date Tested : 21st Sept 2009 Dynamic Probe ID: DP3 Locution East 511313 45m North 7080462 Surface Level RL (AHD) |approx 45.9 Depth (m) Blows Depth (m) Blows Depth (m) Blows Depth (m) Blows 0.00-0,10 x 2.00-2.10 3 4.00-4.10 5 6.00-6,10 13 0.10-0.20 2.10-2.20 4 4.10-4.20 4 6,10-6,.20 10 0,20-0.30 1 2.20-2.30 4 4.20-4.30 5 6,20-6.30 10 0.30-0.40 ii 2.30-2.40 4 4.30-4.40 5 6.30-6.40 10 0.40-0.50 1 2.40-2.50 4 4.40-4,50 5 6.40-6.50 11 0.50-0.60 2 2,50-2.60 5 4,50-4.60 5 6,50-6.60 11 0.60-0.70 2 2.60-2,70 iS 4.60-4.70 6 6.60-6.70 13 0.70-0.80 1 2,70-2.80 4 4.70-4.80 5 6.70-6.80 13 0.80-0.90 2 2,80-2.90 5 4.80-4.90 6 6,80-6.90 8 0.90-1,00 2 2,90-3.00 5 4.90-5.00 6 6.90-7.00 10 1,00-1.10 Z 3.00-3.10 5 5.00-5.10 6 7,00-7,10 12 1,10-1.20 2 3.10-3.20 5 5.10-5.20 7 7.10-7.20 12 1,20-1.30 a 3,20-3,30 5 5.20-5.30 s 7.20-7.30 13 1.30-1.40 2 3.30-3.40 4 5.30-5.40 8 7.30-7.40 14 1.40-1.50 2 3.40-3.50 5 5.40-5.50 9 7.40-7.50 16 1,50-1.60 2 3.50-3.60 5 5.50-5.60 10 7.50-7,60 15 1,60-1.70 3 3,60-3.70 6 5.60-5.70 13 7.60-7.70 17 1.70-1.80 2 3.70-3.80 4 5.70-5.80 11 7.70-7.80 1,80-1.90 3 3.80-3.90 5. 5.80-5.90 13 7.80-7.90 1,90-2.00 3 3.90-4.00 5 5,90-6.00 14 7.90-8.00 Standing Water level: Comments: Soil caves in at 9.6m. Authorized By: “A Date: D+F. &7 NATA TECHNICAL Conperenos MEMBER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.