Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Attachment B Geotechnical report

Attached to the e-mail MCU14/0084 Attachment B (3) Geotechnical Report Email 3 of 4.

of 28

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

www.morrisongeo.com.au

mw CABOOLTURE

@ SUNSHINE COAST

Unit 3/42 Aerodrome Road Unit 4/81 Wises Road

MORRISON GEOTECHNIC PTY LTD ete sel

Caboolture Qld 4510

P: 07 5499 0755
F: 07 5428 2498
caboolturelab@

@ BRISBANE m GOLD COAST
Unit 1/35 Limestone Street Unit 5 / 36 Lawrence Drive
PO Box 3063 PO Box 2011
Darra Qld 4076 Nerang Qld 4211
P: 07 3279 0900 P: 07 5596 1599
F: 07 3279 0955 F; 07 5527 2027
brisbanelab@ [email protected] morrisongeo.com.au

morrisongeo.com.au

Maroochydore Qld 4558

P: 07 5443 9522 MORRISON
F: 07 5479 1633 GEOTECHNIC
maroochydorelab@ ABN 51 009 878 899
morrisongeo.com.au RPEUQ 2241

 

Dynamic Probing Log

 

Dynamic Probe: DP9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page: 1 of 1

Client: Mr Adrian Slinger Test Date: 21st Sept 2009

Job Number: ME09/068 Test Method: Dynamic Probing

Project: Proposed Residence Testing Rig: Dando Terrier

Location: Seaview Terrace, Sunshine Beach Logged By: M.Rubinic

Lot No: No, 71

Date Tested : 21st Sept 2009

Dynamic Probe ID: DP9

Leeaean East 0511307

North 7080476

Surface Level RL (AHD) |approx 43.3
Depth (m) Blows Depth (m) Blows Depth (m) Blows Depth (m) Blows
0.00-0.10 1 2.00-2.10 3 4.00-4.10 12 6.00-6.10 13
0.10-0.20 1 2.10-2.20 3 4.10-4,20 9 6,10-6,20
0.20-0.30 1 2.20-2.30 4 4.20-4.30 8 6,20-6.30
0.30-0.40 a 2.30-2.40 4 4.30-4.40 3 6,30-6.40
0.40-0.50 2 2.40-2.50 4 4.40-4.50 3 6.40-6,50
0.50-0.60 1 2,50-2.60 5 4,50-4.60 5 6,50-6.60
0.60-0.70 2 2.60-2.70 5 4.60-4.70 z 6,60-6,70
0.70-0.80 2 2.70-2.80 7 4.70-4.80 5 6.70-6.80
0.80-0.90 2 2,80-2.90 8 4.80-4.90 5 6.80-6.90
0.90-1.00 2 2.90-3.00 8 4,90-5.00 6 6,90-7.00
1,00-1.10 3 3.00-3.10 7 5.00-5.10 6 7.00-7.10
1,10-1.20 2 3.10-3,20 8 5.10-5.20 7 7.10-7.20
1,20-1.30 3 3.20-3.30 9 5,20-5.30 6 7.20-7,30
1,30-1.40 8 3,30-3.40 6 5.30-5.40 5 7.30-7.40
1,.40-1.50 3 3.40-3.50 6 5.40-5.50 8 7.40-7.50
1,50-1.60 3 3.50-3.60 7 5.50-5.60 7 7.50-7.60
1,60-1.70 3 3.60-3.70 9 5.60-5.70 8 7.60-7.70
1.70-1.80 3 3.70-3.80 43) 5.70-5.80 11 7.70-7.80
1,80-1.90 3 3.80-3,90 13 5,80-5.90 12: 7,80-7.90
1.90-2.00 4 3.90-4.00 12 5.90-6.00 12 7.90-8,00

Standing Water level:

Comments: Measured next day E: 511329:5m N: 7080467

 

 

 

 

 

 

 

ZL.
Authorized By: we

Date: Fo A @ G

 

re /
NATA

‘TECHNICAL —
COMPETENCE Mane

 
Log in to download the original file

Attachment B Geotechnical report.pdf · 4.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.