Council archive · source document
planning report 2.27 ross cres · 132001.210327.1
4.2.5 Engineering Works Codes
A stormwater management plan is also included with the application by Arcos Engineers, which
investigated the existing rubble pit at the rear of the site. The engineers recommend the installation
of a second rubble pit to cater for the new roof areas proposed. This proposal reduces the amount
of scour to the sand dune and will be designed onsite in accordance with the geotechnical
recommendations.
Figure 8: Stormwater management plan markups
Page 12 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
planning report 2.27 ross cres.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.