Original source · versioned page text
Referral Agency Response - Planning RAP22 0005
Officer: Nadine Gorton Direct Telephone: 07 53296215 Our Reference: RAP22/0005 Your Reference: 190315 8 July 2022 Fluid Building Approvals Sunshine Coast 172 Brisbane Road MOOLOOLABA QLD 4557 [email protected] Dear Sir/Madam, Referral Agency Response Planning Act 2016 I refer to your application and advise that Council, as a concurrence agency for the application, completed its assessment of the application on 6 July 2022. You are advised that Council requires conditions to be attached to any development approval. The conditions are listed below. application details Application No: RAP22/0005 Street address: 22 Wyona Dr Noosa Heads Qld 4567 Real property description: Lot 194 RP 94023 Planning Scheme: Noosa Plan 2020 (25 September 2020) type of development The applicant seeks the following type of referral agency response: Concurrence Agency Response for Dwelling House concurrence agency conditions conditions to be included Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date - C Site Plan Prepared by GJ Gardner Homes 26.05.2022 - C Ground Floor Plan Prepared by GJ Gardner Homes 26.05.2022 - C Roof Plan Prepared by GJ Gardner Homes 26.05.2022 - C Elevations (page 7) Prepared by GJ Gardner Homes 26.05.2022 C Elevations (page 8) Prepared by GJ Gardner Homes 26.05.2022 - C Section (page 9) Prepared by GJ Gardner Homes 26.05.2022 C Section (page 10) Prepared by GJ Gardner Homes 26.05.2022 Landscaping A minimum of 20% of the site must be retained as soft landscaping. Existing trees on the site must be retained, except where required to be removed to accommodate the approved dwelling. In this regard, the removal of vegetation must not extend beyond 3 metres of the building footprint. Existing vegetation in the road reserve must be retained, unless written authorisation from Council is granted for the clearing. Fencing Front fencing is to allow for casual surveillance from the property boundary to the street with 50% of the fencing to the entire frontage (including the driveway gate) to be of open construction. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Site Access and Driveways A sealed access driveway must be provided from Wyona Drive to all parking areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include a driveway generally in accordance with drawing number 22-0520-F3 Revision B prepared by Lindsay Consulting dated 6 June 2022. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken generally in accordance with drawing number 2433-02, Sheet 2 of 2, Revision A prepared by Spice Consulting dated 7 June 2022. Easements Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks and Retaining Walls All earthworks and associated retaining structures/batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Where the development involves excavation or filling over, or adjacent to, drainage, water supply or sewerage infrastructure, all access chamber surface levels must be adjusted to provide a freeboard of 100mm above the finished ground surface level. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Sunset Clause for Referral Agency Response This Concurrence Agency response is no longer valid if the use has not commenced within 4 years of the date of this notice, unless otherwise extended in writing by Council. reasons for inclusion of conditions The proposal is subject to specific built form parameters outlined in The Noosa Plan. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the referral agency conditions: Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Co-ordination of Operational Works Assessment Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. rEPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE The applicant may make representations to Council about this referral agency response at any time before the application is decided pursuant to section 30 of the Development Assessment Rules. Yours faithfully, Nadine Gorton Development Planner Enc: Approved Plans/Documents [word/footer2.xml] Page 2 of 4 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 4 [word/header1.xml] 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.