Council archive · source document
Development Application - Part 2 of 2 - Plans · OPW11/0399
Plans and drawings: the text below has words only, no drawings.
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD '
Application number: C:P\,,J \ 1
C \Documents and Settingateje o u I^Pvi Record Cover Sheet NEXT PART (7) doc
7 5 xt 7 ( 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 23 pages
Page 2
DOCUMENT REGISTER/TRANSMITTAL
PLACE
PLANNING
D E S I G N
ENVIRONMENT
Date of Issue
Day 3 33 16 18 30
Project Title : AVJ 1 5 Month 9 10 11 11 11
Project No. : ELYSIUM COMMUNITY CENTRE Year 11 11 11 111 111
Distribution No. of Copies
Blair Britton
1 1 1 1
AV Jennings Properties
Paul McKay
1 1
Cardno
Landscape Assessment Office 5
Sunshine Coast Council
Document No. Document Title Issue
AVJ1 5 000 Landscape Coversheet P1 P2
AVJ15 001 Landscape Notes P1 P2
AVJ1 5 201 Grading & Drainage Plan P1 P2 P3
AVJ1 5 202 Grading & Drainage Plan P1 P2 P3
AVJ1 5 203 Grading & Drainage Plan P1 P2 P3
AVJ15 204 Grading & Drainage Plan P1 P2 P3
AVJ1 5 401 Surface Finishes Plan P1
AVJ15 402 Surface Finishes Plan P1
AVJ 15 403 Surface Finishes Plan P1
AVJ 15 404 Surface Finishes Plan P1
AVJ15 600 Plant Schedules P1 P2
AVJ15 601 Tree Planting Plan P1 P2
AVJ15 602 Tree Planting Plan P1 P2
AVJ 15 603 Tree Planting Plan P1 P2
AVJ15 604 Tree Planting Plan P1 P2
AVJ15 701 Shrub Planting Plan P1 P2
AVJ15 702 Shrub Planting Plan P1 P2
AVJ15 703 Shrub Planting Plan P1 P2
AVJ15 704 Shrub Planting Plan P1 P2
AVJ15901 Landscape Details P1 P2
AVJ1 5 902 Landscape Details P1
246701-011 Cardno Retaining Wall Reference Detail C
A=As Requested B=As Built CA=Counui Approval
Purpose R R R R CA
(=Construction i=Information Update R=Review T=Tender
B=Black & White Copy C=Colour Copy D=D,sk
Medium E E B E B
E=Electronic Transfer 0=0riginal OT=Other
Size A3 A3 A3 A3 A3
PLACE DESIGN GROUP Pty Ltd ACN: 082 370 063
Suite 3, 132 Bulcock Street, Caloundra, Queensland 4551, Australia
Tel +61 7 5499 6188 - Fax +61 7 5499 6711
Page 3
ELYSIUM COMMUNITY CENTRE
SCHEDULE OF DRAWINGS
COVER SHEET AVJ15000
LANDSCAPE NOTES AVJ15 001
GRADING & DRAINAGE PLANS AVJ15 201
AVJ15 202
AVJ15203
AVJ15204
SURFACE FINISHES PLANS AVJ 15 401
AVJI5402
AVJ15403
AVJ15404
PLANT SCHEDULES AVJ15600
TREE PLANTING PLANS AVJ15601
AVJ 15 602
AVJ15603
AVJ15604
SHRUB & GROUNDCOVER PLANTING PLANS AVJ 15 701
AVJ 15 702
AVJ 15 703
AVJ15 704
LANDSCAPE DETAILS AVJ15901
AVJ15902
FORD A[p [PRO-10WAL
LANDSCAPE DOCUMENTATION PACKAGE CLIENT:
AV JENNINGS PROPERTIES
PROJECT NUMBER:
A\ /.I1.F
PLACE
DESIGN
EN'/PROr^^ ^
^^P.
P7 MMP'^'
I-UK UNMKAI IUNAL VVUKKS AI-NKUVAL LIMITED 22.11.2011
Page 4
LANDSCAPE SPECIFICATION EDGING
In addition further to the Landscape Specification that follows. please refer to Landscape Detail Drawing Sheet series. In addition refer to Relevant Local Council details and specifications where Install Timber edge where shown on the Landscape Drawings and as detailed
required and referred to in the documentation Edge Type I Dimensions as per Landscape Detail.
Related Documents: TOPSOIL AUGMENTATION AND IMPORTED TOPSOIL
The landscape documentation is to be read in conjunction with: I In general, The specification for imported topsoil and the augmentation of the existing site topsoil and sub-grade is per the recommendations by Nullabor Prevention: Contact Bill Wilcock
PLACE
I a.N NI Nc
• Architectural Documentation by. Biscoe Wilson Architects 0419680749. The contractor is to allow for contract and payment GrsIGN
• Civil, Hydraulic and Structural Engineering Documentation by: 2 Planting Area Topsoil Depth - 300mm
EN VIRONM ENi
CARDNO (OLD) Pty Ltd swsI.RdoNp
3. Lawn Area Topsoil Depth - 200mm a srwdn
a.rc.sl
PLANTING PROCEDURES
Construction Review and Certificates wd,w
The Contractor shall give the Landscape Architect forty-eight hour's notice of any review period. Planting for street trees and shrubs should be completed in one continuous operation as outlined below, I P" (61911
In addition to normal review of Works identified in each section of the specification, the Landscape Architect shall be required to review the blowing key points: I Stake out tree locations or select shrub plantings for review and approval by Landscape Architect.
a) Sellout of lawn & garden per plays Adjust for any conflicts with utilities etc. ownP.dr, s,Rlwe s..l.. ,.,w..w.•.y
b) Landscape Drainage works •I.swR Card-I Awv
2. Excavate pits for trees or shrubs.
c) Soil placement and augmentation rr.,a„rm cur d.w. d.ur•,d•w,ra.,u
d) Plant Setoul prior to planting 3. Pit sizes - Width is 2 x Diameter and Depths Height of Rootball . 200mm. R.ps. ass dxu-....Nwv.dion •5d0 ,,g m.
4. Set tree plumb and at the appropriate elevation. allow for settling with adjudicated topsoil lightly .bmsdn Iy.6.sq M+I•ad MS.n,wW a
e) Practical Completion and defects review R ACr mwT &C
f) Completion of defects compacted. Set shrubs and face in visually cohesive groupings.
wa.wom u.a.ob.a a..d R,.wa
g) On-Maintenance 5. Backfill with adjudicated top soil in layers to avoid air pockets. Lightly compact and water C S. Vs•1 s•m.IEs•a W rpbwWW Wa
h) Off-Maintenance
settle in layers. Ito Oe.sRMs b/.n P.R6..n.w.•,I.aa
All structural. hydraulic, electrical etc. work is to be Certified by a registered testing authority / engineer where required. w.r r air ans4wsl+•J w •.n•
The Contractor shall seek confirmation of inspection points which are to be nominated by the appropriate engineer prior to work commencing. 6. Construct temporary earthen watering basins and water regularly until irrigation is installed.
-e.P.. r_Sonya a.► -
7 Stake trees - stakes are to be vertically driven to uniform heights. Ties are to be u.dltw•M,wrhu.M cur IatM.Y.r
Landscape Procedures at uniform heights. 6 w.reo.aY.6..rr..,y r tlb
...ails rwi^whwldw
Co-ordination with all other trades is required with regards to Buildings, ubities. paving, walls. fighting. irrigation and water supply by others. etc.
PLANT MATERIAL
The Contractor is to
provide erosion and sediment control measures to any disturbed areas General: The Contractor is to ensure that plant material is well established, free from disease and pests, of good form consistent with the species or variety specified, have a large healthy root
caused by landscape works. systems, with no evidence of root cud, restriction or damage. Any pruning scars shall be dean cut to leave little or no protrusion from trunk or branch.
carry out trimming of any disturbed areas caused by landscape works. Inspection The Landscape Contractor is to allow for all plant material to be inspected by the Landscape Architect at a single nursery prior to delivery to site. At this time, any plants considered not
ELYSIUM COMMUNITY
implement dust control measures to disturbance caused by landscape works, suitable or not meeting the schedule will be rejected and replaced at no charge to the client. 48hr notice is required of stock inspections. The nursery is to be within 100km of site. Generally all shrubs
remove soil and other debris from roadways at the end of each day. and trees sizes noted on the plans and in schedules are minimum required height/ width. CENTRE
remove all waste from site. Bins to be provided by Contractor. Hardening oil: AM plant stock shall be hardened o8 in open areas to receive a minimum of 75% full sun 6 weeks prior to delivery to site. Wafering and fertilising procedures shall be reduced for a
develop a traffic control plan and implement as required. Similar period to aid the hardening off process.
take all necessary precautions for the safety of the pubic, the Contractor's
Trees: Ensure that trunks and branches of all plants are free of dieback. cavites, sunburn and secretions Trunks and branches are to be evenly tapered and textured typical of the species. Plant
employees and conform to all of the regulations as required by The Workplace
material is to be mature enough to support tseif without staling. Branches should be evenly distributed to exhibit a well formed canopy that occupies a minimum 1,13 of to overall current plant height.
AV JENNINGS PROPERTIES
Heath & Safety Act 1995 and all subsequent amendments.
Samples
Foliage shall be evenly distributed across the crown on proportion to the branching structure and be of a true colour typical of the species. density and a good sue. Al tree stock ( 2511 and above) is LIMITED
to conform with the criteria outlined in NATSPEC Guide: Specifying Trees. Trees that be pruned in accordance with AS 4373: Pruning of Amenity Trees. Provide nursery certification by a qualified
The contractor is to provide samples of Plant Material, Mulch. Timber Edging & Chipseal Pathways for approval by the landscape architect prior to construction. Arborist
Defects Liability Period
The defects liability period for the hardscape items is 26 weeks following Practical Completion Pre-planting Handling: Plant material handling is important. The plant material must be monitored and not allowed to dry out while in storage. Bring only the plants that are required for that particular
days sellout to the area to be planted. Delivery and handling of plant material is critical to prevent rootbals from drying out and experience has shown tut once the plant material has become
EARTHWORKS stressed the recovery time can be lengthy effecting the quality of the job. THE CONTRACTOR MUST HAVE A WATER TANK OR OTHER WATERING SOURCE AVAILABLE DURING ALL
Services Verity and mark the location of services on site and on the road reserve prior to commencement of Landscape Works. Do not excavate by machine within 1m of underground services. PLANTING OPERATIONS TO MAINTAIN ROOTBALL MOISTURE LEVELS
Where main line gas males or similar exist contact the relevant service provider to grange for a spotter to be on site during excavations. EXISTING VEGETATION
Existing sub grade in planting areas. Test subsoil drainage to all tree planting positions and plan6hg areas If necessary excavate under Use planting position down through impermeable material Trees to be Retained: Mark trees and shrubs to be retained with suit" non-injurious, easily visible and removable means of identification. Tags to be 100 x 50mm zncanneal tags. painted yellow
to a permeable sub-grade dept. removing excavated material from site and replacing with a porous material and suitable growing medium for nominated species. Settle la kfil to prevent and lettered according to the tree numbering system on the drawings secure the tags using loose galvanised steel wire bands AI fencing and protection is to be in accordance with AS4970 (2009).
subsidence Protection and repair: Protect trees and shrubs to be retained from damage, including those beyond the site area. both above and below ground. Repair any damage to the trees during this work
Earthworks, Finished Levels and Grades . Construct finished grades to the finished levels shown on the civil drawings. Footpaths, turf and garden beds are to generally follow standard Council road
Tree Enclosures: Provide temporary protective enclosures or guards to the tree drip line of all vegetation to be retained Enclosure to be four (4) strands of fencing wire or a plastic mesh barrier,
reserve profiles. Ensure positive drainage away from buildings. on planted areas and pathways to drainage collection points as indicated on the drawings. Ensure a maximum grade of 1:4 to all
supported on star pickets spaced at no more than 4000mm spacing.
planted and 1:6 for turfed areas. The Landscape Contractor shall be required to undertake trimming of bulk earthworks profiles as necessary to blend garden topsoil to edges and achieve required
turf profiles. Trim surfaces as required to allow finished surface levels of hard and soft scape works to merge with finished surfaces of existing services pits, chambers, kerbs and pavements installed Work Near Trees: The areas within the dripline of the trees are to be kept free of construction materials and debris. Do not place bulk materials and harmful materials under of near trees. Do not
by the Civil and Services Contractor(s), Co.ordinale with Civil and Services Contractors. Notify the Superintendent prior to installing works if apparent inconsistencies landscape levels are apparent in place spoil from excavation within this area. Prevent wind-blown materials such as cement from harming trees and plants. Prevent damage to tree bark. Do not attach stays, guys and the like to
previously installed hard elements. trees Do not remove topsoil from, or add topsoil to the areas within the dripline of the trees. If excavation is required near trees to be retained, a suitably qualified arborist is to be present on site to
Upon hadover from the Civil Contractor. the Landscape Contractor shall maintain and be responsible for provide advice. Open up excavations under tree canopies for as short a period as possible Use hand methods to locate. expose and clearly remove the roots on the line of excavation. If it is
carrying out trimming and restoration of any disturbed areas or damaged cried works caused by the landscape works necessary to excavate within the drptne, use hand methods such that root systems are preserved intact and undamaged. Do not cut tree roots exceeding 50mm in diameter. Where it is necessary
implement dust control and erosion control measures to disturbances caused by landscape works to cut these roots, use means so to not unduly disturb the remaining root system Immediately after cutting, apply a bituminous fungal sealant to the cut surface to prevent the incursion of rotor
remove soil and other debris from roadways at the and of each day disease
remove all waste from landscape works from the site, provide bins Backfill to excavations near tree roots with a mixture consisting of 3 parts by volume of topsoil and 1 part of well rotted compost with a neutral pH value, free from weed growth and harmful materials.
Subsoil Drainage: Install subsoil drainage to all planting areas enclosed by masonry or concrete, and where shown elsewhere on the Drawings. Drainage to be 100 0 corrugated, perforated Place the backfill layers, each of 300mm maximum depth compacted to a dry density, similar to that of the original state. Do not backfill around trunks to a height greater than 30Omm above the
polyethylene pipe. class 400 to AS2439, in 300mm wide trench backfiled with 20mm 0 crushed drainage aggregate. Wrap trench with geotextile filter membrane. Ensure positive tall on pipes and original ground surface. Immediately after backfilling thoroughly water the root zone surrounding the tree. Do not compact the ground under trees - ifcompaction occurs, give notice and obtain
connection to stormwater system. Ensure that all retaining walls have sufficient drainage - refer to structural engineer's drawings. instructions. Water the trees as necessary, including where roots area exposed at an ambient temperature > 35'C.
Drainage Pits Refer to Hydraulic and Civil Engineering documentation for further details. ESTABLISHMENT & MAINTENANCE
Geotextile Filter Permeable polypropylene of polyester fabric capable of retaining 0.25mm particles Install, where indicated on Landscape Details & Specifications. To AS 3705 General The Landscape Contractor shall establish and maintain works for a period of thirteen( 26) weeks during which make good defects after the issue of the Certificate of Practical Completion by
Topsoil Install imported topsoil or improved site topsoil to planting and turf areas to comply with AS4419.2003. Topsoil shall be an organic sod with a maximum 30%screened composted organic the Landscape Superintendent. Maintain accepted horticultural practices. as well as rectifying defects that become apparent in the works under normal use. Rectify any of the contract works that are
matter. hydraulic conductivity 15 to 30 amity, and pH range 5 to 6.5. damaged or destroyed untwdiy by others unfit the end of the defects liability period being thirteen (26) weeks. Provide status briefing at Practical Completion to on-site maintenance staff who will
Site Topsoil Augmentation: Augment site topsd to depths detailed for lot of massed planting beds as below. take responsibility for ongoing maintenance from the Landscape Contractor
1. Turf and Planting Bed Sod Augmentation: Commencement: The planting establishment period commences at the date of practical completion and shall continue for a period of 13 weeks. The on-maintenance period commences at the date
For Tendering Purposes, allow the following:: of practical completion and shall continue for a period of 26 weeks.
Apply preplanting application of Nutritech Solutions Cal Mag Lite to soil per Manufacturers recommendations. Use a granular product which will provide some slow release and some fast release Planting Areas:
product. This is preferable to using a fine grade product which would give a sudden'shock'to the soil. Incorporate dolomite to a minimum depth of 100mm prior to turfing. To maximise effect apply The Landscape Contractor shall throughout the planting establishment f maintenance period continue to carry out current works of a maintenance nature including but not limited to watering,
dolomite as early as possible before planting Broadcast Nutristore Gold at 100gm per square metre and incorporate into the top 300mm of soil before planting or 100 mm before furling.
weeding, fertilising, pest and disease and weed control, planting replacements, pruning and the like.
2. Massed Planting Beds and Street Trees Fertilising:
The final watering program subject to rainfall events is to be as follows:
Planting fertilizer. Trees, shrubs and groundcovers to raceve slow release fedizer, Osmocole Plus 56mth at 50% of recommended dosage at the time of planting. Mix thoroughly into the sod,
including tree hole backfill Trees in containers of 45 titre or greater are to have their planting holes dug into the subsoil twice the diameter of the rootbal. Augment the badkM sal with dolomite and Week 1-2: 3 times per week
Nubstore Gold as per rates above. Week 36: 2 times per week
End of Establishment Ferldlizing* Week 7-26: 1 time per week
Apply a second application of Nutstore Gold at the end of the 26 wks Establishment Period and water in thoroughly. Replace any plant that has been planted by the contractor. which dies from any cause doing the planting establishment period. Plant replacement shall be of equivalent size and species as detailed
Organic Mulch Install 25mm Grade Hoop Pine Bark Mulch to all planting areas, as indicated on the Landscape Plan. Mulch layer to be 100mm settled depth, free from soil, weeds, and deleterious in the plant schedule. Weed banks. tree planting sites, seeded and grassed areas regularly and as necessary to leave in a clean and tidy state.
materials such as rock, soil or rubbish. Finish mulch 25mm below all adjacent surfaces. Fertilising:
Fertiliser (Planting Areas). Apply Nutristore Gold per Manufacturers Recommendations to all plants at time of planting. Apply the required amount evenly around the root ball prior to back filling in Fortnightly - Folia Feed with KFF Folia by Nutrilech Solutions per Manufacturers Recommendations
accordance with the manufacturer recommendation and recognised horticultural practice.
After 12 weeks - Apply Nutslore Gold per Manufacturers Recommendations
Planting areas Cultivate subgrade of all planting areas to a minimum depth of 150mm prior to back fling with topsoil and/or fil material to a depth of 300mm. Remove stones exceeding 50mm 0
Mowing Regime:
and organic matter exceeding 25mm 0 brought to the surface during cultivation. Remove any materials detrimental to plant growth. Spread Organic mulch to a settled depth of 100mm. Planting in all
planting areas is to be spread evenly across the area giving a union plant density Staking: Use new unpainted 1800mm x 50mm x 50mm straight hardwood, embedded a minimum 600mn into the Turf areas should be kept neatly trimmed to a maximum height of 20mm above the sod layer. Mowing should be carried out at regular ntervas to ensure the tuff is kept at the desirable level. The
sal. and no less than 450mm apart. Stake all plants supplied in 25 L containers and above. Position two stakes equidistant from the plant centre, well away from the rootbal, and in lye with the mowing regime should respond to weather conditions and it is expected that areas will need to be maintained on a weekly basis during the growing season and either fortnightly or monthly, during
prevailing wind directions (or Tri-Stake as required) Secure the tree with suitable lengths of non-abrasive material, such as approved hessian tape , hoped in figure-8 pattern around the bunk. dormant periods depending upon the prevailing weather conditions LANDSCAPE NOTES
Monitor ties for trunk damage or be breakage during establishment and remove stakes and ties at the completion of establishment unless directed otherwise. Removal of Weeds, Debris and Rubbish
Turf areas: Cultivate subgrade of all planting areas to a minimum depth of 150mm prior to back filing with topsoil and/or fill material to a depth of 100mm. Remove stones exceeding 50mm 0 and The Contractor shall be responsible for ensuring that all site rubbish including plastic planting pots and bags, are removed by environmentally approved practices from all areas.
organic matter exceeding 25mm 0 brought to the surface during cultivation. Remove any materials detrimental to plant growth. Lay Zoysia'Nara'turf rots parallel with contours where possible, DESIGN MS
Final Inspection
stagger pints, and lightly tamp down following laying and roll on completion, Topdress with coarse sand as necessary to remove undulations, fill joints and the like. Turf areas are to have a minimum DOCUMENT :KH,MS
At the completion of the establishment / maintenance period, the final inspection shall be held. If all or certain portions of the work are not acceptable under the terms and intent of the drawings and PROJECT : AVJ15
1.50 crossfall towards drainage infrastructure- Ensure all turf areas are well drained. Water immediately following installation, until the topsoil is moistened to its full depth.
specifications, the establishment I maintenance period for the works shall be extended until the defects work have been corrected and the work accepted by the Landscape Architect. SCALE
DRAINAGE
The Contractor is to insure all surfaces have positive drainage slope away from the building and to drain points as shown on plan. Connections. piping and oulfal per Hydraulic Engineer.
CHIPSEAL PATHWAYS
Chpseal Pathways to be constructed on Road Base per Bush Mates Coloured Dow - River Rock Stone Finish SHEET NUMIIER REVISION
Contact: John Espig (Mobile: 0409 200 206) D01 P2
Page 5
.10 -
.
sa
/S
/S
/S
/S
/S
/S
/S
/S
/S
/S
ELYSIUM COMMUNITY
CENTRE
AV JENNINGS PROPERTIES
LIMITED
GRADING LEVELS
450x450mm A- SUMP 6
GRATE (MODEL. PPS45L)
FG FINISH GRADE
TO TOP OF DRAIN
FL FINISH LEVEL
FFL FINISH FLOOR LEVEL
TW TOP OF WALL
BW BOTTOM OF Will
DIRECTIONAL
FLOW ARROWS
EXISTING CONTOURS
WALL TIE-INS TO MATCH MAJOR
BOULDER WALL EXISTING CONTOURS
MINOR
REFER-DETAIL SHEET
PROPOSED CONTOURS
24fiIQ1-011(C) - - -
WALL TIE4NS TO MATCH
BOULDER WALL
REFER DETAIL SHEET
246701-011(C) i
450K45Ox600mm ACO SUMP & - T
LIGHT DUTY GRATE TYPICAL -
-r{MOOEL PPS45L)
-z `CONNECT TO SW STUBS
DESIGN MS
DOCUMENT KH.MS
PROJECT AVJ15
S(AIF 12OO AT
761
Page 6
ELYSIUM COMMUNITY
CENTRE
AV JENNINGS PROPERTIES
LIMITED
NOTES
re GRADING LEVELS
® 450x450mm ACO SUMP &
GRATE MODEL PPSA5L
FG FINISH GRADE
TD TOP OF DRAIN
FL FINISH LEVEL
FFL FINISH FLOOR LEVEL
1W TOP OF WALL
Bw BOTTOM OF WALL
DIRECTIONAL
FLOW ARROWS
- - EXISTING CONTOURS
MAJOR
-- EXISTING CONTOURS
MINOR
-s»- PROPOSED CONTOURS
DESIGN MS
DOCUMENT XHMS
PROJECT AVJ15
SCALE I20D@A1
SHEET NUMBER REVISION
202 P3
Page 7
\I I
v vL '110 l
vv\^
k UYl21M 0441 dxmer4 oibalnenyandnYla
wp,xAmawtk'rwlvross
BOULDER WALL PER
CIVIL CONTRACTOR
/
ELYSIUM COMMUNITY
Kl
CENTRE
WALL TIE-INS T,0 MATCFV
/CARDNO CIVIL ENGINEERING: SWALE NOTES
BOULDER WALL h
SPECIFY P3 FOR ROCK GRADING TABLE
CLASS B FOR GEOTEXTILE SPECIFICATION REFER Df?AIL SHEET
2467OJ011(C)/'^ AV JENNINGS PROPERTIES
SWALE TO BE REVIEWED d CERTIFIED BY
ARDNO CIVIL ENGINEER
LIMITED
° GRADING LEVELS
• 450x450mmACC, SUMP d
GRATE (MODEL: PPS45L)
R FINISH GRADE
TD TOP OF DRAIN
FL FINISH LEVEL
FFL FINISH FLOOR LEVEL
1W TOP OF WALL
Bw BOTTOM OF WALL
.\ DIRECTIONAL
FLOW ARROWS
- - EXISTING CONTOURS
MAJOR
- - EXISTING CONTOURS
MINOR
-Ax- PROPOSED CONTOURS
GRAVEL SWALE -
REFER TO NOTES & DATA
SHEET THIS PAGE BY CIVIL
ENGINEER
1611.2011
7711 x11
NOTES .1,.- ,•.11dw.*%l1 a.n: ^ro-o. 4.r,r •r:e a+..u nm.!1
n1ernu•1<1.wfW.tVC.r s.xelun4K4yt;s. au<.rtnu,n A! i I7
I,IC A•or^l:.r:r o• l?.1,.s .,.•t10)l •71
.n {•a. n. . rIN'.74
GRADING & DRAINAGE
PLAN
DESIGN MS
DOCUMENT KH, MS
PROJECT : AVJ15
SCALE :1:200@A3
Page 8
----- -S
--. - m^^ w S
r
--------
6°U S
^l-
/ -S
TS
-s -S- S
Dr
/
Aro
7,069
-::^, 7: f7 l
tiRADINGPEe /
CIVIL ENGINEER - I,
5,903 . -2 - -
:21 6
-oc
vv v sa `
, 47
60
\ \ \ I b
\ \ V
--46 0
4
- G4
0
J,IS 3
ENSURE AGI PIPES ARE
6' vs "9 DAYUGHTEDAND
Sy PROVIDE 800x1000mm
nY 4- 10
,0 NN - o X40 AREA OF 100mmO RIVER
FL^251 t J 4
PEBBLES TO OUTFALL
450x450x600mm AGO SUMPS
LIGHT DUTY GRATFfiYPICAL ^35
(MODEL
Nom/ ,O ECT TO SW ST
USING 150mmg4VC PIPE
.19 ENSURE AGI PIPES ARE
^1d - 0 DAYLIGHTED AND
----
ca PROVIDE 600x1000mm
40 AREA OF 100mm9 RIVER
PEBBLES TO OUTFALL
rCK
/
/
/
/S
/
/
/
/
/
/S /
/
/S
/S /
/S /
/S
11^
/
/
pR
WPr MR- - PA--
FN
m I m
PAf IIR--- ^ - _
S 'S I
Page 9
PLACE
D to NN I IIG
DESIGN
EN VIED NIA E'1*
5'N£i
a ;ti 4ll
- r 4N
^:", pNaap
On $ICi^ll
Ndamepan Saq»a Oaambtl a Ind aft. Ea bwn7
u ploIa adby CnppnPd and InINtld PP" 1l
iM nbmaon f vaned In Sn SOOanMI a ndlnS
Aawal a Ira dcaanala n pddlN d,a ld®iy ma
rbmfm Irpnb any Dalian IIALPa Mn Mitl OI
RACE Deaq. Onp
ArrdSad dmIda Daadarm Oas all n®an S
Idt V akp W=.- Ella b OaolSebpn
iki-, - apiaf 'Mr:pUmoaon annpnln of
sp-AA and - mlalilanl.) npd and Nanvi
Ibnrebd pxubN ad[o'ns aA nfaneial OOnllad NE an
dw dnananl a dNnatl ban that a*E/N do: mna0on and
a :alnad ^n aS drosnal n tgOUa a a p and od la
aoMhobn a MkSnpvppa.
ELYSIUM COMMUNITY
CENTRE
LANDSCAPE ROCK
RETAINING WALL TYPICAL AV JENNINGS PROPERTIES
REFER DETAIL Z902 LIMITED
NOTES
GARDEN BED
LANDSCAPE ROCK TURF -ZOYSIA -NARA'
RETAINING WALL TYPICAL iE GARDEN EDGE
REFER DETAIL 21902 1;T^ COLOURED CONCRETE
'1 BY ARCHITECT
c ..r' CERAMIC PAVING
--1 AY ARCHITECT
JIIIPSEAL PATH
BOULDER WALL
^° V(}M DIAMETER 300-5D0-
;RAVEL SWALE
gEFER NOTES FOR DETAILS
WALL TIE-INS TO MATCH
LANDSCAPE ROCK
RETAINING WALL TYPICAL BOULDER WALL
REFER DETAIL 21902 REFER DETAIL SHEET
246701-011(C)
R[rC IN UC I NIL anCC 1 1, 1
246701-011(C) ri - I w
11
GRADING & DRAINAGE
PLAN
DESIGN : MS
DOCUMENT KH MS
PROJECT AVJ15
SCALE 1200@A3
SHEET NUMBER REVISION
401 P1
Page 10
PLACE
II AN NI NG
I111G-
ENYINONMEN,
Mbr•.- Pwdlly fi ^dadYaq
.paid F O*.r^JMbd.dlPPl, -
Tp*_ md^a.leb..a mde.d
N.apt d d /xa.d .. pdid Ea. /td+pry N
,bb d^Y ^1 WrMYdYpu.Id
RACE Dq 0"
Miwlp..w. .pa. . p. q..dwd
a N.11d SI Pal pa'ma
1ls. grpw rEa.o, bmi0.aad
aadp-l w.raNMMY..dI
f., w^...Irf r.a.Iwex..re^r
MAxI-'. fzrwl e'J:at *dtlb
,rr:N;n 1:1W'.W anaa
ELYSIUM COMMUNITY
CENTRE
AV JENNINGS PROPERTIES
LIMITED
NOTES
GARDEN BED
TURF - ZOYSIA NARA'
GARDEN EDGE
COLOURED CONCRETE
BY ARCHITECT
CERAMIC PAVING
BY ARCHITECT
HIPSEAL PATH
BOULDER WALL
FsJ- !-1 NOM DIAMETER 3BPSOOIm1
qtr:"N -,RAVEL SWALE
,..l.e;.: REFER NOTES FOR DETAILS
LANDSCAPE ROCK
RETAINING WALL TYPICAL
REFER DETAIL 21902 CHIPSEAL PATH PER MANUFACTURER
BUSH MATES COLOURED BITUMEN
RIVER ROCK STONE FINISH
Id1'
fa
e^^
CHIPSEAL PATH PER MANUFACTURER
BUSH MATES COLOURED BITUMEN
RIVER ROCK STONE FINISH
/
/S
/5 / f'0
/
GRADING & DRAINAGE
/S
PLAN
DESIGN MS
DOCUASENT ILH. MS
fI
SHEET NUMBER REVISION
402 P1
Page 11
BOULDER
RETAININGWALL
WITH DRAINAGE
REFER DETAIL 1902
ELYSIUM COMMUNITY
CARDNO CIVIL ENGINEERING SWALE NOTES:
SPECIFY P3 FOR ROCK GRADING TABLE CENTRE
CLASS B FOR GEOTEXTILE SPECIFICATION WALL TIE•INS'TO MATCH
BOULDEI^WALL
- SWALE TO BE REVIEWED 6 CERTIFIED BY REFE ETAIL EEV4
CARDNO CIVIL ENGINEER 246701-011LCY '
AV JENNINGS PROPERTIES
/ / LIMITED
y
Al
TIMBER GARDEN EDGE
REFER DETAIL 1901
COLOURED CONCRETE
BY ARCHITECT
CERAMIC PAVING
BY ARCHITECT
CHIPSEAI PATH
,Q BOULDER WALL
TIMBER GARDEN EDGE (^. NOM DIAMETER 300-500mm
I,HAVEL SWALE
REFER DETAIL 31901
RFFER NOTES FOR DETAILS
GRAVEL SWALE
REFER TO NOTES & DATA DRAINAGE PITS
SHEET THIS PAGE BY CIVIL PER CIVIL ENGINEER'S
ENGINEER DETAILS IAND$CAP$ROCK -
RETAINING WALL TYPICAL.
REFER DETAIL 21902
.^• .. •... , Aetna ^ I.
N3TES..
' A'y..ll..l.l.ri..'..I'.yiliv N'w:".+II.P."I^•l. Y.t..l.',14't
't'.`I M.'..1•WIN.t.Y.e•MIM t• tt1.t'mr....Mw..'..51'111^
I I•Nr.....1. tW Wlyt.•4'^..•\e•*,•tI 5,...r..'r•rr.}...w
V_.
I rq....'W'.M •.. M tAiP,'N•. O yrt..t 5,'5.'NCS*. ' I..r -- Il.tq
. 1.'1.......•......• ...•. r•.?....rtS I4 ....v.tc.' M..Ur r gtFMP.^
DESIGN MS
^^ uioFi,I M. M.,
PROJLCI AVJI5
SCA_E 1200®A3
Page 12
PLACE
M
GSSIGN
!S S C NVI.q nM F41
S `$
-s 518
vna p]®I
S --S --$ -s -S -S
-S -$ -S -S
RACE DmO Gep P5 LW ACM Mp 3"M
-$ . -$ -S -S -S - S i
II1S.wM.d1ytl R^.aSn,Nd Ale psdrnp
.wINNaM CA"" .d Wwodup.ry I.IIt
lbwmnw ca.On Sn m d.®ppl*d
RNpN1db d[uNN nadillS1.,.d 00115Y
-0- npowfw Semis., p. w.fMd.n.e wp.dd
DF OF RACE o..p Gad
I
O13 d 1013WwR NI. p.ttl.rp RM 15.111.051
N1. Wli S d5N.wn w 1Mpn.NMMSMIw
QI Il
ASS `^Nd\^lir yNp,\il^>n^i+Vn
l` l N l Ni
I
7,069 r dW\ TIn a..$ i.y daIN .d: e.®. mrrw d
I/M!. wp Rr.. IwdNdq rod N N,M..
NomnM5Ip.Itl.I r l.N,d..N10 55 co d.dw
l+1/l ^l I
b %-w ltm M..SPtldauw Id
^lzl
, ; n 4n'">N, I.bntlnl Stlen,..a N1MOy INN5
l Nl d N' h N h H''l4 9 N I 4 11 j^
.. N' V, c wwpuanlGrwpuyelp
s`.l/dJ,NSti`r//Fo,nov nSpNSon; ,)4H,;9$ t °,N$;9;
PROJECT
5,903
ELYSIUM COMMUNITY
CENTRE
LANDSCAPE ROCK CLIENT
BOULDER
RETAINING WALL TYPICAL
RETAINING WALL t` 1
REFER DETAIL 2'902
WITH DRAINAGE
AV JENNINGS PROPERTIES
-ui
REFER DETAIL 11902 LIMITED
yI
NOTES
GARDEN BED
LJ TURF .ZOYSIA TIARA'
11 1.: • - i . GARDEN EDGE
COLOURED CONCRETE
LANDS APE ROCK BY ARCHITECT
ENSURE AGI PIPES ARE CERAMIC PAVING
R TAINING W L TYPICAL BY ARCHITECT
DAYLIGHTED AND
REFER ETAIL 2/902 I
PROVIDE 800x1000mm ;-IPSEAL PATH
o;y AREA OF lOOmm^ RIVER IicrJLOER WALL
PEBBLES TO OUTFALL r,DM DIAMETER 30O500-
BOLILQER ` RAVEL SWALE
'R(?TNINING'WA
r. WITH DRAINAG
FLIER NOTES FOR DETAILS
REItR DETAIV 1'902
Ti
LANDSCAPE ROCK
RETAINIIGWALL TYPICAL
RE ERDETAIL2/902 ENSURE AGI PIPES ARE
DAYLIGHTED AND
PROVIDE 800xl000mm
AREA OF 100mmO RIVER
PEBBLES TO OUTFALL
551E
PS L oPwows55PSVYAS uI NS 211.,,
/
/S
/
/
0)
)PAln.' SD TITLE
/
SURFACE FINISHES PLAN
/S
/
F
DESIGN MS
DOCUMENT BHMS
PROJECT AVJ15
SIE S^ SCALE 1700©A.7
,R-
I R_
RR
m^ m __-dl___
If
/ _ IRR-
tRR_
YR5-
s qA`
IRR-_- JAR- SHEET NUMBER REVISION
_ ^.^ IIIR`. I 404 P1
Page 13
ELYSIUM, NOOSA
COMMUNITY CENTRE - Plant Material Selection List
Code I Botanical Name Common Name Size Quantity Code Botanical Name Common Name Size Quantity
Trees & Palms Shrubs
ARC 200 Archontophoenix cunninghamiana Bangalow Palm 200L 15 ALP cae Alpinina caerulea Native Ginger 200mm 75
ARC can Archontophoenix cunninghamiana Bangalow Palm 100L 3 BAN rob Banksia robur Swamp Banksia 200mm 175
ACM hem Acmena hemilampra Blush Satinash 45L 5 CAL EN Callistemon 'Endeavour' Endeavour Bottle Brush 200mm 57
BRA ace Brachychiton acerifolius Flame Tree 200L 4 CAL GBF Callistemon 'Great Balls of Fire' Great Balls of Fire 200mm 105
CAL vim Callistemon viminalis Weeping Bottlebrush 45L 5 CAL U Callistemon 'Little John' Little John 200mm 219
CAS gla Casuarina glauca Swamp She-Oak 45L 16 COR rub Cordyline rubra Red and Green Varieties 200mm 141
CUP ana Cupaniopsis anacardioides Tuckeroo 200L 26 MEL CT Melaleuca linanifolia 'Claret Tops' Claret Tops 200mm 30
ELYSIUM COMMUNITY
ELA 400 Elaeocarpus eumundi Eumundi Quandong 400L 2 MEL aff Melastoma affine Blue Tongue 200mm 215 CENTRE
ELA eum Elaeocarpus eumundi Eumundi Quandong 200L 5 MET FF Metrosideros 'Fiji Fire' Fiji Fire 200mm 54
ELA ret Elaeocarpus reticulatus Blueberry Ash 100L 4 SYZ AC Syzygium australe'Aussie Compact' Aussie Compact 200mm 391 AV JENNINGS PROPERTIES
EUC rob Eucalyptus robusta Swamp Mahogany 45L 4 SYZ cas Syzygium cascade Cascade Lilly Pilly 200mm 188 LIMITED
EUC SR Eucalyptus 'Summer Red' Summer Red Flowering Gum 45L 4 WES fru Westringia fruticosa Zena' Dwarf Westringia 200mm 156
LOP con Lophostemon confertus Brush Box 45L 24 XAN LP Xanthostemon verticillatus 'Little Penda' Little Penda 200mm 35
MAC tan Macaranga tanarius Blush Macaranga 45L 11
MEL ell Melicope elleryana Pink Flowering Corkwood 100L 18 Code Botanical Name Common Name Size Quantity
MEL 100 Melaleuca quinquenervia Swamp Paperbark 100L 43 Grasses & Strappy Plants
MEL qui Melaleuca quinquenervia Swamp Paperbark 45L 26 ACR spe Acrostichum speciosum Mangrove Fern 75mm 25
SYZ 100 Syzygium australe 'Hinterland Gold' Hinterland Gold Lilly Pilly 100L 19 BAU art Baumea articulata Jointed twigrush 75mm 40
SYZ HG Syzygium australe 'Hinterland Gold' Hinterland Gold Lilly Pilly 45L 3 DIA BR Dianella caerulea 'Breeze' Breeze 140mm 115
SYZ lue Syzygium luehmannii Small Leaved Lilly Filly 100L 19 HYM lit Hymenocallis littoralis Spider Lily 140mm 344
WAT flo Waterhousia floribunda Weeping Lilly Pilly 2001 8 LOM KB Lomandra hystrix 'Katie Belles' Katie Belles 140mm 380
LOM TB Lomandra hystrix 'Tropic Belle' Tropic Belle 140mm 410
LOM Ion Lomandra longifolia Spiny-headed Matt Rush 140mm 617
Code Botanical Name Common Name Size Quantity
Groundcovers
HIB sca Hibbertia scandens Snake Vine 140mm 985
MYO ell Myoporum ellipticum Boobiala 140mm 699
TRA var Trachelospermumjasminoides 'Variegata' Variegated Jasmine 140mm 170
Page 14
ELYSIUM COMMUNITY
CENTRE
3- Me'L f.U.
AV JENNINGS PROPERTIES
LIMITED
Jet
?
.3-#fj, £U>-
DESIGN MS
DOCUMENT:V
KHMS
I5
5
PROJECT ll//1
AJ
SCALE 1200P.Q i%^ll
Page 15
fMnb,,fl, MY .Mn Munnls 00M.
RKfK00a M /x~ r• YON I IMamm
iPMKDV. Arm b Aq 0MM Mpl N MAM ion
PLACE Drpn hoy
wnwk WOSKN aariwmlanmm wmr an
M /ttuwnin Mnnnk b,N ..Pow --N.
^a CaAmtlnhl /%.m0KK 03MM. MI NAB
tMM01 a0n 00 <MAUOo Arpn
ELYSIUM COMMUNITY
CENTRE
AV JENNINGS PROPERTIES
LIMITED
/g
SHEET NUMBER REVISION
602 P2
Page 16
\\ ``
y.•y
\\ t. \ me utlmneon conaned .n non aa-, a-b
A 4
Pecs. n of Ns dxunalr poebad ban dndwgft
\ \ N. edmanv. k 11dn io em Pew ae «aen ^n>mi or
MACE Deegn 6aq
'x\,\,
iyA ;A d\
'\V
-o
,\\ % &\\ \ Q,A
v%o
ELYSIUM COMMUNITY
CENTRE
\ \\\ \ \. ' \
AV JENNINGS PROPERTIES
LIMITED
X\4 I. \
%
DESIGN MS
DOCUMENT KH,MS
PROJECT AVJ15
SCALE 1200 ® A3
Page 17
PLACE
I I N N N ING
DINT/N
(NVIRQ NM I NS
NNRNN t0M1
iI VJ IN01
Nu ]0^1
MIRNI
C'. MIDI
___.. fNiNM RNN'MIIRtwNI NrIYfN1
• I'>•RIIN C^INNNYI+RrmNN-
M NbNb eeR^M Y NNlM N sMIIN1
RN;NN dY YwNN nIIRNNRM IIYpY
.__ NNINb RII-NMI YW oAl/1!
IMNIYI *wS W /RM/INN-A N^NIR!
-MI•rr -NNAN CN111NOII
AN Iwo' RNIN ^IRw^ ^oerNYrt S
7*-W MN+NRggNMWNNNe1
MoAYMIIwIM W MMIINI^N^NIISOeiRNN1 W
-(-NNINMMd gNyN11l YNNNWI W
C SNY RNmNR•NrMRYN W NR4
4IRIMIY Y(^YM NRIMI
ELYSIUM COMMUNITY
CENTRE
AV JENNINGS PROPERTIES
LIMITED
TREE PLANTING PLAN
DESGN MS
DOCUMENT NH, MS
SHEET NUMBER
604
Page 18
A
ELYSIUM COMMUNITY
CENTRE
AV JENNINGS PROPERTIES
LIMITED
SHEET NUMBER REVISION
701 P2
[OCR of page images]
v
\\ ef \ JOINS SHEET 703
Kayo Eu
20.CAL &pF
oo fonler
2G DI»
125- Hibsocm
19-CALLT
i
JOINS SHEET 702
om
© PLACE Design Group Pty Lis ACN. O82 378 963
2a ohawumon sopunyes Taneretes of cares armas he meg
1 protected by Copyright an intact Property isan
‘The etormaton <ontaned 0 fx Socamant confers
Recprerts of tes document are pected tom decom he
ntormaton heres any pao wad he ween consent of
PLACE Desgn Grow.
Aoqotitnd deentors we precedence oem ary meauures of
oe. Vary al maemont on ue part conrucbon
‘Thes ramang may Saplay wen permease a combeabon of
speaks and cher corsa) mpl and hewn
amvratad spect and corsutant nformion contanes atm
(ex docaent i inlerencnd har fiat sacobed Sa-urertaion and
1 contaned tn document a mebcate Wy 26d not for
conatracton of cartiation purpose
PROJECT
ELYSIUM COMMUNITY
CENTRE
CUENT
AV JENNINGS PROPERTIES
LIMITED
NOTES
DRAWING TITLE
SHRUB PLANTING PLAN
SHEET NUMBER REVISION
701 P2
Page 19
1M mktme0 cm1Vadi0 P1 documenld<oWM*Y Pecpemm M Ars d;cmnm me pOMMed from dedaeq to Nmnedon eam m mry pemrm eMa[ Me rnen aivd a PLACE Denpn Goy ELYSIUM COMMUNITY CENTRE AV JENNINGS PROPERTIES LIMITED DESIGN MS DOCUMENT KH.MS PROJECT AVJ15 SCALE 1'200 (D A3
Page 20
ELYSIUM COMMUNITY
CENTRE
AV JENNINGS PROPERTIES
LIMITED
DESIGN MS
DOCUMENT NH, MS
PROJECT AVJ15
SHEET NUMBER REV1SIO
703 P2
Page 21
PLACE
)I A N NING
.aSSON
mlRolomol
w...l cYd
w ANN hOYi
•4'fwlr
c• t•w^
•Pd.NN CON N.YWd Nm.N-.
n..b.dm arw^ • N.asr a oo4wd
W[p.L d N /a..... n.dO.I bn 6rN.. N
rr.dr N.....v rNei r.r r.r mwa d
vct-o.r
- o-ro r.. r«rsn N....wn d
rr..'dt, d d.r... Y lY /C b Oo.I W r
n. ^1 ^ N.Nr .d.wmi . ae.dm d
... d. N dr usdNNmt dV* N
N*Nr.W pa..^. rr.b aaw0.dr
N N...N.nl...r N.iNNI..d N.riW N
. w.r... N db.r.d.d.b.NN Ntlb
taN.b>rArat. ^.pd
ELYSIUM COMMUNITY
CENTRE
AV JENNINGS PROPERTIES
LIMITED
SHEET MASER REVISION
704 P2
Page 22
GENERAL NOTES:
ERADICATE WEEDS FROM GARDEN PRIOR TO GENERAL NOTES.
NOTE GARDEN EDGE TO BE INSTALLED TO ALL JUNCTIONS
CONSTRUCTING BED ENVIRONMENTALLY ACCEPTABLE ERADICATE WEEDS FROM LAWN AREAS PRIOR TO LAYING I SOWING TURF I
BETWEEN PLANTED AREAS AND TURF AS INDICATED ON PLAN
METHODS SHALL BE USED A 14ON-RESIDUAL HERBICIDE MAY SEED ENVIRONMENTALLY ACCEPTABLE METHODS SHALL BE USED. A
BE APPLIED TO AREAS AFFECTED BY WEEDS. NON.RESIDUAL HERBICIDE MAYBE APPLIED TO AREAS AFFECTED BY
REGULARLY REMOVE WEED GROWTH THROUGHOUT WEEDS REGULARLY REMOVE WEED GROWTH THROUGHOUT TURFED AND
TURF
PLANTED AND MULCHED AREAS DURING THE COURSE OF SEEDED AREAS DURING THE COURSE OF CONTRACT PERIOD. UGHTLY
REFER TO SPECIFICATIONS
CONTRACT PERIOD. AMEND GROWING MEDIUM TO TARP OR ROLL SURFACE OF TURF AFTER INSTALLATION, TO ENSURE THAT
SPECIFICATION TURF ROOTS ARE IN CONTACT WITH TOPSOIL TURF ON LOW SIDE OF ANY 100mm o 25mm ACO (H5) TREATED PINE
100mm ORGANIC PATH OR EDGE TO FINISH ADAM BELOW FINISHED PATWEDGE LEVEL EDGE FIX TO STAKE USING 2 No SS
MULCH LAYER AS SPECIFIED 4Dmm NAILS PER CROSSING.
100mm MULCH
REFER TO SPECIFICATIONS
r-- GROWING MEDIUM
300mm DEPTH CULTIVATED AND FINISHED GRADE
AUGMENTED TOPSOIL ASPER 8 STAKE STAKES TO BE AT 1500mm
10DMMDEPTH TURF BLEND TOPSOIL SPACING MAXIMUM AT CHANGES IN
SPECIFICATION NOTES
CULTIVATED WITH LAWN STARTER DIRECTION OR 100mm FROM END OF
V V Y ^7 V U V
FERTIUZER PER SPECIFICATION BOARD
RIP SUBGRADE TO MN IOOMM DEPTH
RIP SUBGRADE TO MIN 100MM AND GRADE EVENLY PRIOR TO PLACING
DEPTH AND GRADE EVENLY TOPSOIL
PRIOR TO PLACING TOPSOIL
/1 GARDEN BED TYPICAL TURF TYPICAL TIMBER GARDEN EDGE TYPICAL
\901,' 1:20@A3 V901 1:20@A3 901 1-20 @ A3
ELYSIUM COMMUNITY
CENTRE
2 No 50MA X 50MA HW TIMBER STAKE. 2 No. 50MM X 50MM HW TIMBER STAKE.
STAKE IS NOT TO PENETRATE STAKE IS NOT TO PENETRATE
ROOTBALL PENETRATE MINIMUM ROOTBALL PENETRATE MINIMUM
200mm INTO EXISTING SUBGRADE 200mm INTO EXISTING SUBGRADE
AV JENNINGS PROPERTIES
(2No) FIGURE'S NYLON I HESSIAN TIE
LIMITED
(2No.) FIGURE B' NYLON I HESSIAN TIE SHRUB I GROUNOCOVER SPECIES AS
STAPLED TO (2No.) STAKE STAPLED TO (2No) STAKE PER PLANTING PLAN
CREATE 100MM DEEP WATERING BASIN
BERMED SOIL DISH RAISED ON DOWNHILL
AROUND PLANT
SIDE TO FORM A ICOMM DEEP BASIN
100MM ORGANIC MJLCH PER GARDEN
ICCmm MULCH AS SPECIFIED. MAINTAIN lWmm MULCH AS SPECIFIED. MAINTAIN BED DETAIL MULCH NOT TO BE IN
MINIMUM 50mm SEPARATION BETWEEN M"NIMUM 50mm SEPARATION BETWEEN CONTACT WITH PLANT STEM
ORGANIC MULCH AND BASE OF STEM
ORGANIC MULCH AND BASE OF STEM 300MM DEPTH CULTIVATED AND
AUGMENTED SITE TOPSOIL PER TYPICAL
GARDEN BED DETAIL
GROWING MEDIUM PER SPECIFICATIONS EXCAVATE PLANTING HOLE 2X WIDER AND
100MM DEEPER THAN ROOTBALL AND
CONTAINER TREE BACK FILL WITH AUGMENTED SITE TOPSOIL
---- CONTAINER TREE.
TEASE OUT BASE OF ROOTBALL
TEASE OUT BASE OF ROOTBALL APPLY SLOW RELEASE FERTILISER TO
PRIOR TO PLANTING PRIOR TO PLANTING BASE OF PLANTING HOLE USE OSMOCOTE
PLUS 5-A MONTH AT HALF THE
\^ \' BACKFILL PLANTING HOLE WITH //, TBACK FILL RECOMIAENEEO DOSE RATE
X /x TOPSOIL PER SPECIFICATION OPSOIL PER SEC HOLE
IFICATION
WITH
/. 4 ROOTBALL DIAMFTRE / I$_ 2K ROOTBALL DIAMETRE__/
4 TREE IN GARDEN AREA ON SLOPE 5-\ TREE IN GARDEN AREA TYPICAL I^Cl SHRUB IN GARDEN AREA TYPICAL
901' 1:40@A3 901/ 1:40 @ A3 ,,901_/ 1:20@A3
EDGES 2X POT DIA, BACKFILL WITH
AUGMENTED TOPSOIL PER
SPECIFICATION
75mm TUBE STOCK -45L PLANT MATERIAL
DESIGN MS
DOCUMENT NH MS
PROJECT AVJ15
SCALE AS SHOWN @ A3
7 SHRUB IN GARDEN AREA ON SLOPE
SHEET NUMBER REVISION
901 120@A3 901 P2
Page 23
GNEO`US STONE BOULDER IGNEOUS STONE BOULCEY
HALL BC+JLDERS TO BE X/ 'NALL BOULDERS TOBF
PLACE
ROUNDED NOM3W500 nn OJ A ROUNDED NOMl045rr}nmLIS
300661 WADE DRAINAGE TRENCH WITH 2011) ENYTNO NM F N'
SCREENINGS WRAP WITH GEOFABRIC ALL
our..
- 100mm MULCH AS SPECIFIED AROUND. BRING TO SURFACE AND COVER FABRIC x*
WITH 75MA DEEP SURFACE LAYER OF 2550MAB u Cp
TOPSOIL AS SPECIFIED TOP SOIL AS SPECIFIED MARY RIVER GRAVEL
100M O AG. PIPE MN 0.5% FALL
SUBGRAOE OR
APPROVED BACKFILL
SUBGRADE » an.... d4q.pa Vw,(Sm,a,M.aa Idn* Q
APPROVED BACKFILL ovikYl by ceppgH ndlntl.N/Rop.}M
IN mMNn cmtna nla daow+4 C MVS
Rnp.!dNa domed nPofbd.d bntdmry m.
GEOFABRIC AS GEOFABRICAS n/.magi N..n a .R pn.n rvl ..Nan meYl d
SPECIFIED SPECIFIED 450MA8 PIT PER ENGINEER, OACEDwgn C.pp
KEY PrdII. K . I'ISTING KEY BOULDERS INTO EXISTING MAX DEPTH 600MM M,~ mean. M.mnd.naa..N n.napa
BJB-Rr. q .I'J V Isl :.rIMM DEEP SUBGRADE MINIMUM 300MM DEEP w. Nw0, .1 m ,aM.mnawanceon
TNT mngmndopey rnenmen..snd am oT
1501NMO DISCHARGE PIPE aaa.l nd a.r ux4JNnrya.gw nd N...M
PER ENGINEER
14-W anaa nlewllw+bmannwad am
M, dawwp . nl.mud Nn M.Npa dx^mnbbcn n6
4.na doNadan0ms5wa..e0Nndnabr
cnawpoo.rwpaoa^
1I BOULDER RETAINING WALL WITH DRAINAGE LANDSCAPE ROCK RETAINING WALL WITHOUT DRAINAGE AGI DRAIN TYPICAL
^90j 1:40 @ A3 ^90?,/ 1:40@A3 902/ 1:40 @ A3
ELYSIUM COMMUNITY
CENTRE
AV JENNINGS PROPERTIES
LIMITED
LANDSCAPE DETAIL
DESIGN MS
DOCUMENT KH MS
PROJECT AVJ15
SCALE ASSHON
SHEET NUMBER
902
Page 24
WALL DIMENSIONS AND REINFORCEMENT - TYPE #1
'H1' 'H2' 'L' 'D' 'A' bars 'B' bars i 'C' bars
BLOCKWORK RETAINING WALL NOTES: 600 - 600 450 N12 N12 N12
1 Concrete N20/20. 80mm 1-10, .201 stump 800 - 800 450 N12 N12 N12
2. Corefill N20/10, 230 e30mm slump
3. Covers, slab 30mm top, footings 50mm, wall 55mm 1000 - 1000 450 N12 N12 N12
6. Laps, slab mesh 225mm for 125mm if edge matched),
trench mesh 325mm. N12 - 600, N16 - 600 1200 - 1100 450 N12 N12 N12 -Balustrade refer to
5 Corner & intersecting bars, 2/N121500mmxS00mm) Dug 012 for details.
(i.e. 2 corner bars top and 2 corner bars bottom)
1400 - 1200 450 N12 N12 N12
6 Fully corefill blockwork and compact by rodding 1600 - 1300 450 N12 N12_ N12
7. Prop wall during backilling and compaction
8 Provide blockwork expansion joints at 6 Om crs 1800 - 1400 450 N12 N12 N12
9 Design subgrade bearing capacity of 125kPa, to be
confirmed on site prior to placement of 2000 600 1500 600 N16 N12 N16
reinforcement >
2200 600 1600 1 600 N16 N12 N16
2/N12 Horizontal N12 U-Bar @ 600 crs
2400 600 1750 600 N16 Ni? __^ N16
2600 800 1850 600 N16 N12 N16
Spoon drain to discharge
clear of retaining wall.
28.90 909 i209 890 - N12 N76
pllnae)
300ma thickness of N12-600)600x600)
site or imported sandy
clay lining naterial.
material. ALLOTMENT 300 thickness of site
or imported sandy
20.42 channel block
clay lining material
300 thick site or imported
Wall sealant to suit
sandy clay lining material
architectural requirements
'B' bars-400
and tirnshes central
N12-400 Wall sealant to suit
horiz, lap 6S0 architects requirements
Spoon drain to discharge and finishes
clear of retaining wall
900 slotted PVC drain in geotextile
'A' bars-400,
sock in free draining gravel to
900 slotted PVC drain in geotextile 600 lap with 'B' bars
Compacted insitu discharge away from footings to
sock in free draining gravel to
discharge away from footings to soil/backfill free outlet as directed on site by
free outlet as directed on site by superintendent
superintendent.
N12-400 hori2.
lap 450. Free draining granular back fill - 20 65 cleanout block
30 45 cleanout wrapped in geotextile Bidim A36 or
blocks approved equivalent
90 0 slotted PVC drain to discharge
to free outlet clear of foundations
as directed on site by Superintendant
30 N12-300
l'
h
TYPE #1
RETAINING WALL DETAIL 600mm to 2800mm HIGH BOULDER RETAINING WALL
TYPE #2
SCALE 120 at Al 250
SCALE 160 at A3 SURCHAGE 5kPa SLOPE 1 in 3
BASE
HEIGHT TOTAL (H) BASE EMBEDMENT TOP WIDTH
PRESSURE
BOULDER RETAINING WALL NOTES: (mm) (mm) (mm) (mm) (mm)
(kPa)
1 Supported material to be competent insitu soil, rock or well compacted fill.
Backfill to be granular, free draining in medium dense condition. 600 850 750 250 600 30
WALL DIMENSIONS AND REINFORCEMENT
2.
3. Foundation to be competent material with allowable bearing capacity of 125 kPa 900 1150 900 250 675 41
Selected boulders to be approved by an experienced geotechnical engineer to be of adequat
'H1' 'L' 'A' bars 'B' bars 'C' bars
4. 1200 1450 1100 250 800 69
600 600 N12 N12 N12
strength and durability. (e.g. Basalt, Granite or similar) 1800 1300 300 925 60
1500
S Boulders should be placed in stable positions with several point contacts, generally balance 800 800 N12 N12 N12
1800 2100 1650 300 1000 72
rearward Stones should form an interlocking mass when completed with no individual stones 1000 1000 N12 N12 N12
free to move. 2100 21.00 1600 300 1075 82
1200 1100 Ni? N12 N12
6 Major boulders with dimensions similar to the wall width should be used judiciously. They 2600 2900 1950 500 1350 98
1600 1200 N12 N12 N12
should be placed with long axis perpendicular to the wall face, sloped rearwards and well 2700 3200 7100 500 1425 109
supported with several point or line contacts. Preferably major boulders should not be 1600 1300 Ni? N12 N12
3000 3500 2250 500 1500 120
placed adjacent to each other 1800 1600 Ni? N12 N12
01 0 01 02 03 06 05m
Scale 110
av.n
® Cnbso IOkl'I Ply Ltd 00 RAMS Reserved 2011 RPEQ NAME: Shane Gesch
9.. 1v Da.
09/09/2011
Dar
(1-'AV JENNINGS PROPERTIES LIMITED
aupwd
Cardno
rae,nw,l n M.IY. M. ', ui idMJw..pbagf b
09/09/2011 PROPOSED ELYSIUM COMMUNITY CENTRE
CYMnfJwl P1l0. idea ,db ,:d Sd ..8!000 .05.0 a
eoromd m.lro.0 0 POOP.., mw•.a win nm.,, mws RPEQ No,. 10431 DATE 21/09/2011
(leaked D.le
DRIVEWAY AND CARPARKING FOR CONSTRUCTION
nfN pw.n OP 005 ul q.... wa CaTOOw1PoW
SIGNATURE 1 M 09/09/2011 Do. D.N. Sig.
1S/IIg011 onasivurlION 6SDr Of DRAW"", reel 51W;,. 092 se'-`f Da. 21/09/2011 AHD AS SHOWN z'rAT
f_ wl.ww.d^^,. b, IM rwrlinattada<ewaMtmtd.+
r 9/09/7011 DRAWINGSISSUED "R TENDER Sw IPM
-0'a rv, ew dworcnmar nw.:,un,. am 09/09/2011 Orar+q NumOr
SUNSHINE COAST OFFICE', Level 1, 9 Maud Street Maroo0hYOore, Old 4558 Lsor,dwW u,nuw,t,I .-ro.r m.e^r,nW Wnl
A 71/09/2011, (O ORIINA [ION ISSUE Of DRAWINGS
no. (IOlnphnn
S W 'P_M
Drawn Appr
EmM'. sco nun cerdracom au Ph. (07151432555 Fax. (01) 5443 54042 nr wr^,•wrv.e, rvld001,mnrpin.ol mae^omsw 010.0,04 ate
RETAINING WALL DETAILS 246701-011
n1. ON Al ORIGINAL
Used in these records
Development Application - Part 2 of 2 - PlansRelated documentApplication case desk ↗
About this file
- File size
- 9.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.