Council archive · source document
Development Application - Part 2 of 2 - Plans · OPW11/0399
Plans and drawings: the text below has words only, no drawings.
GENERAL NOTES:
ERADICATE WEEDS FROM GARDEN PRIOR TO GENERAL NOTES.
NOTE GARDEN EDGE TO BE INSTALLED TO ALL JUNCTIONS
CONSTRUCTING BED ENVIRONMENTALLY ACCEPTABLE ERADICATE WEEDS FROM LAWN AREAS PRIOR TO LAYING I SOWING TURF I
BETWEEN PLANTED AREAS AND TURF AS INDICATED ON PLAN
METHODS SHALL BE USED A 14ON-RESIDUAL HERBICIDE MAY SEED ENVIRONMENTALLY ACCEPTABLE METHODS SHALL BE USED. A
BE APPLIED TO AREAS AFFECTED BY WEEDS. NON.RESIDUAL HERBICIDE MAYBE APPLIED TO AREAS AFFECTED BY
REGULARLY REMOVE WEED GROWTH THROUGHOUT WEEDS REGULARLY REMOVE WEED GROWTH THROUGHOUT TURFED AND
TURF
PLANTED AND MULCHED AREAS DURING THE COURSE OF SEEDED AREAS DURING THE COURSE OF CONTRACT PERIOD. UGHTLY
REFER TO SPECIFICATIONS
CONTRACT PERIOD. AMEND GROWING MEDIUM TO TARP OR ROLL SURFACE OF TURF AFTER INSTALLATION, TO ENSURE THAT
SPECIFICATION TURF ROOTS ARE IN CONTACT WITH TOPSOIL TURF ON LOW SIDE OF ANY 100mm o 25mm ACO (H5) TREATED PINE
100mm ORGANIC PATH OR EDGE TO FINISH ADAM BELOW FINISHED PATWEDGE LEVEL EDGE FIX TO STAKE USING 2 No SS
MULCH LAYER AS SPECIFIED 4Dmm NAILS PER CROSSING.
100mm MULCH
REFER TO SPECIFICATIONS
r-- GROWING MEDIUM
300mm DEPTH CULTIVATED AND FINISHED GRADE
AUGMENTED TOPSOIL ASPER 8 STAKE STAKES TO BE AT 1500mm
10DMMDEPTH TURF BLEND TOPSOIL SPACING MAXIMUM AT CHANGES IN
SPECIFICATION NOTES
CULTIVATED WITH LAWN STARTER DIRECTION OR 100mm FROM END OF
V V Y ^7 V U V
FERTIUZER PER SPECIFICATION BOARD
RIP SUBGRADE TO MN IOOMM DEPTH
RIP SUBGRADE TO MIN 100MM AND GRADE EVENLY PRIOR TO PLACING
DEPTH AND GRADE EVENLY TOPSOIL
PRIOR TO PLACING TOPSOIL
/1 GARDEN BED TYPICAL TURF TYPICAL TIMBER GARDEN EDGE TYPICAL
\901,' 1:20@A3 V901 1:20@A3 901 1-20 @ A3
ELYSIUM COMMUNITY
CENTRE
2 No 50MA X 50MA HW TIMBER STAKE. 2 No. 50MM X 50MM HW TIMBER STAKE.
STAKE IS NOT TO PENETRATE STAKE IS NOT TO PENETRATE
ROOTBALL PENETRATE MINIMUM ROOTBALL PENETRATE MINIMUM
200mm INTO EXISTING SUBGRADE 200mm INTO EXISTING SUBGRADE
AV JENNINGS PROPERTIES
(2No) FIGURE'S NYLON I HESSIAN TIE
LIMITED
(2No.) FIGURE B' NYLON I HESSIAN TIE SHRUB I GROUNOCOVER SPECIES AS
STAPLED TO (2No.) STAKE STAPLED TO (2No) STAKE PER PLANTING PLAN
CREATE 100MM DEEP WATERING BASIN
BERMED SOIL DISH RAISED ON DOWNHILL
AROUND PLANT
SIDE TO FORM A ICOMM DEEP BASIN
100MM ORGANIC MJLCH PER GARDEN
ICCmm MULCH AS SPECIFIED. MAINTAIN lWmm MULCH AS SPECIFIED. MAINTAIN BED DETAIL MULCH NOT TO BE IN
MINIMUM 50mm SEPARATION BETWEEN M"NIMUM 50mm SEPARATION BETWEEN CONTACT WITH PLANT STEM
ORGANIC MULCH AND BASE OF STEM
ORGANIC MULCH AND BASE OF STEM 300MM DEPTH CULTIVATED AND
AUGMENTED SITE TOPSOIL PER TYPICAL
GARDEN BED DETAIL
GROWING MEDIUM PER SPECIFICATIONS EXCAVATE PLANTING HOLE 2X WIDER AND
100MM DEEPER THAN ROOTBALL AND
CONTAINER TREE BACK FILL WITH AUGMENTED SITE TOPSOIL
---- CONTAINER TREE.
TEASE OUT BASE OF ROOTBALL
TEASE OUT BASE OF ROOTBALL APPLY SLOW RELEASE FERTILISER TO
PRIOR TO PLANTING PRIOR TO PLANTING BASE OF PLANTING HOLE USE OSMOCOTE
PLUS 5-A MONTH AT HALF THE
\^ \' BACKFILL PLANTING HOLE WITH //, TBACK FILL RECOMIAENEEO DOSE RATE
X /x TOPSOIL PER SPECIFICATION OPSOIL PER SEC HOLE
IFICATION
WITH
/. 4 ROOTBALL DIAMFTRE / I$_ 2K ROOTBALL DIAMETRE__/
4 TREE IN GARDEN AREA ON SLOPE 5-\ TREE IN GARDEN AREA TYPICAL I^Cl SHRUB IN GARDEN AREA TYPICAL
901' 1:40@A3 901/ 1:40 @ A3 ,,901_/ 1:20@A3
EDGES 2X POT DIA, BACKFILL WITH
AUGMENTED TOPSOIL PER
SPECIFICATION
75mm TUBE STOCK -45L PLANT MATERIAL
DESIGN MS
DOCUMENT NH MS
PROJECT AVJ15
SCALE AS SHOWN @ A3
7 SHRUB IN GARDEN AREA ON SLOPE
SHEET NUMBER REVISION
901 120@A3 901 P2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - PlansRelated documentApplication case desk ↗
About this file
- File size
- 9.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.