Council archive · source document
Development Application - Part 2 of 2 - Plans · OPW11/0399
Plans and drawings: the text below has words only, no drawings.
LANDSCAPE SPECIFICATION EDGING
In addition further to the Landscape Specification that follows. please refer to Landscape Detail Drawing Sheet series. In addition refer to Relevant Local Council details and specifications where Install Timber edge where shown on the Landscape Drawings and as detailed
required and referred to in the documentation Edge Type I Dimensions as per Landscape Detail.
Related Documents: TOPSOIL AUGMENTATION AND IMPORTED TOPSOIL
The landscape documentation is to be read in conjunction with: I In general, The specification for imported topsoil and the augmentation of the existing site topsoil and sub-grade is per the recommendations by Nullabor Prevention: Contact Bill Wilcock
PLACE
I a.N NI Nc
• Architectural Documentation by. Biscoe Wilson Architects 0419680749. The contractor is to allow for contract and payment GrsIGN
• Civil, Hydraulic and Structural Engineering Documentation by: 2 Planting Area Topsoil Depth - 300mm
EN VIRONM ENi
CARDNO (OLD) Pty Ltd swsI.RdoNp
3. Lawn Area Topsoil Depth - 200mm a srwdn
a.rc.sl
PLANTING PROCEDURES
Construction Review and Certificates wd,w
The Contractor shall give the Landscape Architect forty-eight hour's notice of any review period. Planting for street trees and shrubs should be completed in one continuous operation as outlined below, I P" (61911
In addition to normal review of Works identified in each section of the specification, the Landscape Architect shall be required to review the blowing key points: I Stake out tree locations or select shrub plantings for review and approval by Landscape Architect.
a) Sellout of lawn & garden per plays Adjust for any conflicts with utilities etc. ownP.dr, s,Rlwe s..l.. ,.,w..w.•.y
b) Landscape Drainage works •I.swR Card-I Awv
2. Excavate pits for trees or shrubs.
c) Soil placement and augmentation rr.,a„rm cur d.w. d.ur•,d•w,ra.,u
d) Plant Setoul prior to planting 3. Pit sizes - Width is 2 x Diameter and Depths Height of Rootball . 200mm. R.ps. ass dxu-....Nwv.dion •5d0 ,,g m.
4. Set tree plumb and at the appropriate elevation. allow for settling with adjudicated topsoil lightly .bmsdn Iy.6.sq M+I•ad MS.n,wW a
e) Practical Completion and defects review R ACr mwT &C
f) Completion of defects compacted. Set shrubs and face in visually cohesive groupings.
wa.wom u.a.ob.a a..d R,.wa
g) On-Maintenance 5. Backfill with adjudicated top soil in layers to avoid air pockets. Lightly compact and water C S. Vs•1 s•m.IEs•a W rpbwWW Wa
h) Off-Maintenance
settle in layers. Ito Oe.sRMs b/.n P.R6..n.w.•,I.aa
All structural. hydraulic, electrical etc. work is to be Certified by a registered testing authority / engineer where required. w.r r air ans4wsl+•J w •.n•
The Contractor shall seek confirmation of inspection points which are to be nominated by the appropriate engineer prior to work commencing. 6. Construct temporary earthen watering basins and water regularly until irrigation is installed.
-e.P.. r_Sonya a.► -
7 Stake trees - stakes are to be vertically driven to uniform heights. Ties are to be u.dltw•M,wrhu.M cur IatM.Y.r
Landscape Procedures at uniform heights. 6 w.reo.aY.6..rr..,y r tlb
...ails rwi^whwldw
Co-ordination with all other trades is required with regards to Buildings, ubities. paving, walls. fighting. irrigation and water supply by others. etc.
PLANT MATERIAL
The Contractor is to
provide erosion and sediment control measures to any disturbed areas General: The Contractor is to ensure that plant material is well established, free from disease and pests, of good form consistent with the species or variety specified, have a large healthy root
caused by landscape works. systems, with no evidence of root cud, restriction or damage. Any pruning scars shall be dean cut to leave little or no protrusion from trunk or branch.
carry out trimming of any disturbed areas caused by landscape works. Inspection The Landscape Contractor is to allow for all plant material to be inspected by the Landscape Architect at a single nursery prior to delivery to site. At this time, any plants considered not
ELYSIUM COMMUNITY
implement dust control measures to disturbance caused by landscape works, suitable or not meeting the schedule will be rejected and replaced at no charge to the client. 48hr notice is required of stock inspections. The nursery is to be within 100km of site. Generally all shrubs
remove soil and other debris from roadways at the end of each day. and trees sizes noted on the plans and in schedules are minimum required height/ width. CENTRE
remove all waste from site. Bins to be provided by Contractor. Hardening oil: AM plant stock shall be hardened o8 in open areas to receive a minimum of 75% full sun 6 weeks prior to delivery to site. Wafering and fertilising procedures shall be reduced for a
develop a traffic control plan and implement as required. Similar period to aid the hardening off process.
take all necessary precautions for the safety of the pubic, the Contractor's
Trees: Ensure that trunks and branches of all plants are free of dieback. cavites, sunburn and secretions Trunks and branches are to be evenly tapered and textured typical of the species. Plant
employees and conform to all of the regulations as required by The Workplace
material is to be mature enough to support tseif without staling. Branches should be evenly distributed to exhibit a well formed canopy that occupies a minimum 1,13 of to overall current plant height.
AV JENNINGS PROPERTIES
Heath & Safety Act 1995 and all subsequent amendments.
Samples
Foliage shall be evenly distributed across the crown on proportion to the branching structure and be of a true colour typical of the species. density and a good sue. Al tree stock ( 2511 and above) is LIMITED
to conform with the criteria outlined in NATSPEC Guide: Specifying Trees. Trees that be pruned in accordance with AS 4373: Pruning of Amenity Trees. Provide nursery certification by a qualified
The contractor is to provide samples of Plant Material, Mulch. Timber Edging & Chipseal Pathways for approval by the landscape architect prior to construction. Arborist
Defects Liability Period
The defects liability period for the hardscape items is 26 weeks following Practical Completion Pre-planting Handling: Plant material handling is important. The plant material must be monitored and not allowed to dry out while in storage. Bring only the plants that are required for that particular
days sellout to the area to be planted. Delivery and handling of plant material is critical to prevent rootbals from drying out and experience has shown tut once the plant material has become
EARTHWORKS stressed the recovery time can be lengthy effecting the quality of the job. THE CONTRACTOR MUST HAVE A WATER TANK OR OTHER WATERING SOURCE AVAILABLE DURING ALL
Services Verity and mark the location of services on site and on the road reserve prior to commencement of Landscape Works. Do not excavate by machine within 1m of underground services. PLANTING OPERATIONS TO MAINTAIN ROOTBALL MOISTURE LEVELS
Where main line gas males or similar exist contact the relevant service provider to grange for a spotter to be on site during excavations. EXISTING VEGETATION
Existing sub grade in planting areas. Test subsoil drainage to all tree planting positions and plan6hg areas If necessary excavate under Use planting position down through impermeable material Trees to be Retained: Mark trees and shrubs to be retained with suit" non-injurious, easily visible and removable means of identification. Tags to be 100 x 50mm zncanneal tags. painted yellow
to a permeable sub-grade dept. removing excavated material from site and replacing with a porous material and suitable growing medium for nominated species. Settle la kfil to prevent and lettered according to the tree numbering system on the drawings secure the tags using loose galvanised steel wire bands AI fencing and protection is to be in accordance with AS4970 (2009).
subsidence Protection and repair: Protect trees and shrubs to be retained from damage, including those beyond the site area. both above and below ground. Repair any damage to the trees during this work
Earthworks, Finished Levels and Grades . Construct finished grades to the finished levels shown on the civil drawings. Footpaths, turf and garden beds are to generally follow standard Council road
Tree Enclosures: Provide temporary protective enclosures or guards to the tree drip line of all vegetation to be retained Enclosure to be four (4) strands of fencing wire or a plastic mesh barrier,
reserve profiles. Ensure positive drainage away from buildings. on planted areas and pathways to drainage collection points as indicated on the drawings. Ensure a maximum grade of 1:4 to all
supported on star pickets spaced at no more than 4000mm spacing.
planted and 1:6 for turfed areas. The Landscape Contractor shall be required to undertake trimming of bulk earthworks profiles as necessary to blend garden topsoil to edges and achieve required
turf profiles. Trim surfaces as required to allow finished surface levels of hard and soft scape works to merge with finished surfaces of existing services pits, chambers, kerbs and pavements installed Work Near Trees: The areas within the dripline of the trees are to be kept free of construction materials and debris. Do not place bulk materials and harmful materials under of near trees. Do not
by the Civil and Services Contractor(s), Co.ordinale with Civil and Services Contractors. Notify the Superintendent prior to installing works if apparent inconsistencies landscape levels are apparent in place spoil from excavation within this area. Prevent wind-blown materials such as cement from harming trees and plants. Prevent damage to tree bark. Do not attach stays, guys and the like to
previously installed hard elements. trees Do not remove topsoil from, or add topsoil to the areas within the dripline of the trees. If excavation is required near trees to be retained, a suitably qualified arborist is to be present on site to
Upon hadover from the Civil Contractor. the Landscape Contractor shall maintain and be responsible for provide advice. Open up excavations under tree canopies for as short a period as possible Use hand methods to locate. expose and clearly remove the roots on the line of excavation. If it is
carrying out trimming and restoration of any disturbed areas or damaged cried works caused by the landscape works necessary to excavate within the drptne, use hand methods such that root systems are preserved intact and undamaged. Do not cut tree roots exceeding 50mm in diameter. Where it is necessary
implement dust control and erosion control measures to disturbances caused by landscape works to cut these roots, use means so to not unduly disturb the remaining root system Immediately after cutting, apply a bituminous fungal sealant to the cut surface to prevent the incursion of rotor
remove soil and other debris from roadways at the and of each day disease
remove all waste from landscape works from the site, provide bins Backfill to excavations near tree roots with a mixture consisting of 3 parts by volume of topsoil and 1 part of well rotted compost with a neutral pH value, free from weed growth and harmful materials.
Subsoil Drainage: Install subsoil drainage to all planting areas enclosed by masonry or concrete, and where shown elsewhere on the Drawings. Drainage to be 100 0 corrugated, perforated Place the backfill layers, each of 300mm maximum depth compacted to a dry density, similar to that of the original state. Do not backfill around trunks to a height greater than 30Omm above the
polyethylene pipe. class 400 to AS2439, in 300mm wide trench backfiled with 20mm 0 crushed drainage aggregate. Wrap trench with geotextile filter membrane. Ensure positive tall on pipes and original ground surface. Immediately after backfilling thoroughly water the root zone surrounding the tree. Do not compact the ground under trees - ifcompaction occurs, give notice and obtain
connection to stormwater system. Ensure that all retaining walls have sufficient drainage - refer to structural engineer's drawings. instructions. Water the trees as necessary, including where roots area exposed at an ambient temperature > 35'C.
Drainage Pits Refer to Hydraulic and Civil Engineering documentation for further details. ESTABLISHMENT & MAINTENANCE
Geotextile Filter Permeable polypropylene of polyester fabric capable of retaining 0.25mm particles Install, where indicated on Landscape Details & Specifications. To AS 3705 General The Landscape Contractor shall establish and maintain works for a period of thirteen( 26) weeks during which make good defects after the issue of the Certificate of Practical Completion by
Topsoil Install imported topsoil or improved site topsoil to planting and turf areas to comply with AS4419.2003. Topsoil shall be an organic sod with a maximum 30%screened composted organic the Landscape Superintendent. Maintain accepted horticultural practices. as well as rectifying defects that become apparent in the works under normal use. Rectify any of the contract works that are
matter. hydraulic conductivity 15 to 30 amity, and pH range 5 to 6.5. damaged or destroyed untwdiy by others unfit the end of the defects liability period being thirteen (26) weeks. Provide status briefing at Practical Completion to on-site maintenance staff who will
Site Topsoil Augmentation: Augment site topsd to depths detailed for lot of massed planting beds as below. take responsibility for ongoing maintenance from the Landscape Contractor
1. Turf and Planting Bed Sod Augmentation: Commencement: The planting establishment period commences at the date of practical completion and shall continue for a period of 13 weeks. The on-maintenance period commences at the date
For Tendering Purposes, allow the following:: of practical completion and shall continue for a period of 26 weeks.
Apply preplanting application of Nutritech Solutions Cal Mag Lite to soil per Manufacturers recommendations. Use a granular product which will provide some slow release and some fast release Planting Areas:
product. This is preferable to using a fine grade product which would give a sudden'shock'to the soil. Incorporate dolomite to a minimum depth of 100mm prior to turfing. To maximise effect apply The Landscape Contractor shall throughout the planting establishment f maintenance period continue to carry out current works of a maintenance nature including but not limited to watering,
dolomite as early as possible before planting Broadcast Nutristore Gold at 100gm per square metre and incorporate into the top 300mm of soil before planting or 100 mm before furling.
weeding, fertilising, pest and disease and weed control, planting replacements, pruning and the like.
2. Massed Planting Beds and Street Trees Fertilising:
The final watering program subject to rainfall events is to be as follows:
Planting fertilizer. Trees, shrubs and groundcovers to raceve slow release fedizer, Osmocole Plus 56mth at 50% of recommended dosage at the time of planting. Mix thoroughly into the sod,
including tree hole backfill Trees in containers of 45 titre or greater are to have their planting holes dug into the subsoil twice the diameter of the rootbal. Augment the badkM sal with dolomite and Week 1-2: 3 times per week
Nubstore Gold as per rates above. Week 36: 2 times per week
End of Establishment Ferldlizing* Week 7-26: 1 time per week
Apply a second application of Nutstore Gold at the end of the 26 wks Establishment Period and water in thoroughly. Replace any plant that has been planted by the contractor. which dies from any cause doing the planting establishment period. Plant replacement shall be of equivalent size and species as detailed
Organic Mulch Install 25mm Grade Hoop Pine Bark Mulch to all planting areas, as indicated on the Landscape Plan. Mulch layer to be 100mm settled depth, free from soil, weeds, and deleterious in the plant schedule. Weed banks. tree planting sites, seeded and grassed areas regularly and as necessary to leave in a clean and tidy state.
materials such as rock, soil or rubbish. Finish mulch 25mm below all adjacent surfaces. Fertilising:
Fertiliser (Planting Areas). Apply Nutristore Gold per Manufacturers Recommendations to all plants at time of planting. Apply the required amount evenly around the root ball prior to back filling in Fortnightly - Folia Feed with KFF Folia by Nutrilech Solutions per Manufacturers Recommendations
accordance with the manufacturer recommendation and recognised horticultural practice.
After 12 weeks - Apply Nutslore Gold per Manufacturers Recommendations
Planting areas Cultivate subgrade of all planting areas to a minimum depth of 150mm prior to back fling with topsoil and/or fil material to a depth of 300mm. Remove stones exceeding 50mm 0
Mowing Regime:
and organic matter exceeding 25mm 0 brought to the surface during cultivation. Remove any materials detrimental to plant growth. Spread Organic mulch to a settled depth of 100mm. Planting in all
planting areas is to be spread evenly across the area giving a union plant density Staking: Use new unpainted 1800mm x 50mm x 50mm straight hardwood, embedded a minimum 600mn into the Turf areas should be kept neatly trimmed to a maximum height of 20mm above the sod layer. Mowing should be carried out at regular ntervas to ensure the tuff is kept at the desirable level. The
sal. and no less than 450mm apart. Stake all plants supplied in 25 L containers and above. Position two stakes equidistant from the plant centre, well away from the rootbal, and in lye with the mowing regime should respond to weather conditions and it is expected that areas will need to be maintained on a weekly basis during the growing season and either fortnightly or monthly, during
prevailing wind directions (or Tri-Stake as required) Secure the tree with suitable lengths of non-abrasive material, such as approved hessian tape , hoped in figure-8 pattern around the bunk. dormant periods depending upon the prevailing weather conditions LANDSCAPE NOTES
Monitor ties for trunk damage or be breakage during establishment and remove stakes and ties at the completion of establishment unless directed otherwise. Removal of Weeds, Debris and Rubbish
Turf areas: Cultivate subgrade of all planting areas to a minimum depth of 150mm prior to back filing with topsoil and/or fill material to a depth of 100mm. Remove stones exceeding 50mm 0 and The Contractor shall be responsible for ensuring that all site rubbish including plastic planting pots and bags, are removed by environmentally approved practices from all areas.
organic matter exceeding 25mm 0 brought to the surface during cultivation. Remove any materials detrimental to plant growth. Lay Zoysia'Nara'turf rots parallel with contours where possible, DESIGN MS
Final Inspection
stagger pints, and lightly tamp down following laying and roll on completion, Topdress with coarse sand as necessary to remove undulations, fill joints and the like. Turf areas are to have a minimum DOCUMENT :KH,MS
At the completion of the establishment / maintenance period, the final inspection shall be held. If all or certain portions of the work are not acceptable under the terms and intent of the drawings and PROJECT : AVJ15
1.50 crossfall towards drainage infrastructure- Ensure all turf areas are well drained. Water immediately following installation, until the topsoil is moistened to its full depth.
specifications, the establishment I maintenance period for the works shall be extended until the defects work have been corrected and the work accepted by the Landscape Architect. SCALE
DRAINAGE
The Contractor is to insure all surfaces have positive drainage slope away from the building and to drain points as shown on plan. Connections. piping and oulfal per Hydraulic Engineer.
CHIPSEAL PATHWAYS
Chpseal Pathways to be constructed on Road Base per Bush Mates Coloured Dow - River Rock Stone Finish SHEET NUMIIER REVISION
Contact: John Espig (Mobile: 0409 200 206) D01 P2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - PlansRelated documentApplication case desk ↗
About this file
- File size
- 9.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.