                                                                                        2006/1015

      The location and type of device to be installed shall be established at the “pre start” meeting
      with Council’s Construction Technical Officer and shall be installed prior to the
      commencement of any works.
15.   Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting regarding the civil
      works.
16.   The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
17.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy
      of Council’s signed approved drawings and conditions by the applicant.
18.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ). The consulting engineers are responsible for arranging all
      inspections, with Council’s Construction Technical Officer or nominated staff. Council’s
      Construction Technical Officer shall provide an inspection form for signing off by the Engineer
      at appropriate stages of construction, during on-site meetings. Construction Technical Officer
      will also sign the form at each stage when conditions required have been satisfied. The works
      will be accepted “On Maintenance” after this form, signed by the inspector for each stage is
      complete, together with a letter from the Engineer requesting that the works go “On
      Maintenance”.
19.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
20.   Council standards shall apply to these works unless otherwise modified herein.
21.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Manager-Land Development and shall forthwith rectify the damage to that
      property or facility at its cost and to the satisfaction of the Manager-Land Development, prior to
      the commencement of the use or, alternatively, the Applicant may request the Council to carry
      out the rectification work at the Applicant’s cost, such cost being paid by the Applicant to the
      Council prior to the commencement of the use, provided that in the case of emergency the
      Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being
      paid prior to the commencement of the use.
      A management strategy to ensure no damage occurs to Council services shall be given to
      Council for assessment prior to the pre start meeting.




                                                                                      Page 4 of 16


[OCR of page images]
2006/1015

 

15.

16.

17.

18.

19.

20.
21.

The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.

Council's Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting regarding the civil
works.

The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.

Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council’s signed approved drawings and conditions by the applicant.

The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The consulting engineers are responsible for arranging all
inspections, with Council’s Construction Technical Officer or nominated staff. Council's
Construction Technical Officer shall provide an inspection form for signing off by the Engineer
at appropriate stages of construction, during on-site meetings. Construction Technical Officer
will also sign the form at each stage when conditions required have been satisfied. The works
will be accepted “On Maintenance” after this form, signed by the inspector for each stage is
complete, together with a letter from the Engineer requesting that the works go “On
Maintenance’.

Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).

Council standards shall apply to these works unless otherwise modified herein.

The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
damage or interference whatsoever.

If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Manager-Land Development and shall forthwith rectify the damage to that
property or facility at its cost and to the satisfaction of the Manager-Land Development, prior to
the commencement of the use or, alternatively, the Applicant may request the Council to carry
out the rectification work at the Applicant’s cost, such cost being paid by the Applicant to the
Council prior to the commencement of the use, provided that in the case of emergency the
Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being
paid prior to the commencement of the use.

A management strategy to ensure no damage occurs to Council services shall be given to
Council for assessment prior to the pre start meeting.

Page 4 of 16

Used in these records

About this file

File size
217 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1015 - Decision Letter - Change to Existing Approval - Ext of Currency [As Published].pdf · 217 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.