                                                                                        2006/1015

12.   As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone
      56 coordinate value to the standards and requirements of the Assessment Manager are required
      for Council records. Such 'as constructed' drawings will be required prior to works being accepted
      "on maintenance", where applicable. Requirements for "as constructed" information are detailed
      in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.
      Release of plans of survey and/or acceptance of the works on-maintenance will not be
      considered until lodgement of satisfactory 'as constructed' records.
      Please note that bonding of outstanding works will not be considered by Council.
13.   Your company, as Consulting Engineers for the project, is responsible for arranging all
      inspections and ensuring that all relevant details required by Council are supplied. The attached
      Water and Sewerage Inspection Report form is to be kept by you and presented to Council's
      Inspector at each stage of the development requiring a meeting or inspection. The Inspector will
      sign the form at each stage when conditions have been satisfied. The works will be accepted 'on
      maintenance' when this form, signed by the Inspector for each stage, is returned with a letter
      requesting that it go 'on maintenance'.
14.   Construction work and other associated activities are permitted only during the hours of 7:00am
      and 6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
      where extended hours are approved by the Assessment Manager or his nominee.
15.   Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
      Inspector shall be present during any work on live sewer undertaken by contractor. An additional
      fee of $140.00 (included below) is required to cover costs associated with these live sewer works.
16.   Fees applicable to the above project are listed below:-
      Plan Examination                             $ 14,700.00
      Inspection Fee                               $ 14,700.00
      Checking as-constructed data                 $    120.00
      CCTV fee                                     $ 6,805.00
      Live sewer inspection                        $    140.00
      BALANCE                                      $ 36,465.00       (PAID 15.05.06 - RN. 183314)
17.   Approval of these plans has been taken as a Notice of intention to commence works on the
      development.
18.   Council will provide all fittings and valves for the cut-in to the existing water supply as well as
      labour to perform the cut-in. The Developer shall bear the actual cost of this work, and payment
      shall be made before the cut-in is done.
19.   All water connection fees are to be paid prior to the pre-start meeting.
      The water main must be commissioned prior to installing the water services and water meters.
      The water service tappings on the new water main/s within the development must be undertaken
      by an approved subcontractor under direct Council supervision. Tappings on water mains not
      constructed as part of the development works are to be carried out by Noosa Shire Council at
      developer’s cost.




                                                                                      Page 8 of 16


[OCR of page images]
2006/1015

 

12.

13.

14.

15.

16.

17.

18.

19.

As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone
56 coordinate value to the standards and requirements of the Assessment Manager are required
for Council records. Such 'as constructed’ drawings will be required prior to works being accepted
"on maintenance", where applicable. Requirements for "as constructed" information are detailed
in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.

Release of plans of survey and/or acceptance of the works on-maintenance will not be
considered until lodgement of satisfactory 'as constructed’ records.

Please note that bonding of outstanding works will not be considered by Council.

Your company, as Consulting Engineers for the project, is responsible for arranging all
inspections and ensuring that all relevant details required by Council are supplied. The attached
Water and Sewerage Inspection Report form is to be kept by you and presented to Council's
Inspector at each stage of the development requiring a meeting or inspection. The Inspector will
sign the form at each stage when conditions have been satisfied. The works will be accepted 'on
maintenance’ when this form, signed by the Inspector for each stage, is returned with a letter
requesting that it go ‘on maintenance’.

Construction work and other associated activities are permitted only during the hours of 7:00am
and 6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
where extended hours are approved by the Assessment Manager or his nominee.

Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor. An additional
fee of $140.00 (included below) is required to cover costs associated with these live sewer works.

Fees applicable to the above project are listed below:-

Plan Examination $ 14,700.00
Inspection Fee $ 14,700.00
Checking as-constructed data $ 120.00
CCTV fee $ 6,805.00
Live sewer inspection $ 140.00
BALANCE $ 36,465.00 (PAID 15.05.06 - RN. 183314)

Approval of these plans has been taken as a Notice of intention to commence works on the
development.

Council will provide all fittings and valves for the cut-in to the existing water supply as well as
labour to perform the cut-in. The Developer shall bear the actual cost of this work, and payment
shall be made before the cut-in is done.

All water connection fees are to be paid prior to the pre-start meeting.
The water main must be commissioned prior to installing the water services and water meters.

The water service tappings on the new water main/s within the development must be undertaken
by an approved subcontractor under direct Council supervision. Tappings on water mains not
constructed as part of the development works are to be carried out by Noosa Shire Council at
developer's cost.

Page 8 of 16

Used in these records

About this file

File size
217 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1015 - Decision Letter - Change to Existing Approval - Ext of Currency [As Published].pdf · 217 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.