Council archive · source document
Decision Notice - 010.2008.00000365.001 [As Published] · 132008.365
2008/365
0711 SK 02 C New Upper Bedroom Level (Upper & Proposed New Feb 08
Level) – Peter Hull Architect Pty Ltd
0711 SK 01 C New Living Level Plan (Living Level) – Peter Hull Feb 08
Architect Pty Ltd
0711 SK 04 B Section AA – Peter Hull Architect Pty Ltd Feb 08
0711 SK 05 A Street Elevation – Peter Hull Architect Pty Ltd Feb 08
and as may be amended by these conditions and annotations on the plans.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. External colours and finishes of the building shall comprise of muted tones that blend with the
natural environment.
4. The roofing of the structure shall be of a non-reflective nature with colours and finishes that
are of muted tones that blend with the natural environment.
5. Non-reflective glass shall be utilised for the development to reduce glare and reflection.
6. A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to
service the detached house and shall be sited in a manner that does not impact on the site’s
vegetation. The tank is to be installed to ensure water from the tank can be used both:
6.1. For external use such as watering gardens, irrigation, ornamental ponds or water
features, topping up swimming pools, outdoor cleaning; and
6.2. For use in flushing of toilets internal to the building.
7. Any new hot water systems installed shall be either solar systems; electric heat pump
systems; or gas systems (LPG or natural).
8. The building height shall not exceed 8.0 metres above natural ground level.
9. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the
maximum allowable building height of 2 storeys and 8 metres as required by the Planning
Scheme.
10. All vegetation shall be maintained on site with measures undertaken to protect the vegetation
during construction and include no storage of construction materials, equipment etc outside
the building footprint.
11. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
Roof Water & Stormwater Drainage
12. Stormwater runoff from any new roofed areas shall be directed to the approved stormwater
drainage system and discharged in such a manner to ensure that no scour or damage occurs
to the subject site, any adjoining property or Council infrastructure.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000365.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.