Body Corp for No. 7 Noosa Parade - Concurrence agency response before application is made · OPW15/0114
Attached to the e-mail OPW15/0114- Prescribed Tidal Works Application – 7 Noosa Parade.
Department of Infrastructure,
Local Government and Planning
Our reference: SPL-0615-021442
Date: 23 June 2015
Body Corporate for No. 7 Noosa Parade CTS 4624
C/- The Jetty Specialist
2 Industrial Avenue
CALOUNDRA QLD 4551
Dear Sir/Madam
Concurrence agency response before application is made—with conditions
7 Noosa Parade, Noosa Heads QLD 4567
(Related to section 271 and given under section 285 of the Sustainable Planning Act 2009)
Reference is made to your correspondence dated 11 June 2015 requesting the Department
of Infrastructure, Local Government and Planning provide a referral agency response for
the proposed development before the development application is made to the assessment
manager.
Applicant details
Applicant name: Body Corporate for No. 7 Noosa Parade CTS 4624
Applicant contact details: C/- The Jetty Specialist
2 Industrial Avenue
CALOUNDRA QLD 4551
Site details
Street address: 7 Noosa Parade, Noosa Heads QLD 4567
Real property description: 0 BUP10936
Site area: 27 m2
Local government area: Noosa Shire Council
Application details
Proposed development: Operational Works for Prescribed Tidal Works (Pontoon for
private use)
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
SPL-0615-021442
Aspects of development and type of approval being sought
Development type: Operational work
Approval type: Pre-referral response
Referral triggers
The development application would be referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger: Schedule 7, Table 2, Item 15—Tidal works, or development in a
coastal management district
Documents supplied to support request
Version and
Plan / Report title Author Reference no.
date
Site Plan, Layout & Water The Jetty JSP-SJ-28050 Issue B,
Allocation Specialist 02/06/2015
Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the department requires that
the conditions set out in Attachment 1 attach to any development approval.
Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department is required to
set out the reasons for the decision to impose conditions. These reasons are set out in
Attachment 2.
Pursuant to section 272(3) of the Sustainable Planning Act 2009, you will not be required to
refer your application to the department if you submit this response in its entirety when
making the application to the assessment manager, and the following conditions are
satisfied:
Any changes to the proposal before the application is made to the assessment manager
do not result in a substantially different development to that which was presented to the
department with the request for a referral agency response
The development application must be made to the assessment manager within 12
months of the date of this referral agency response.
Department of Infrastructure, Local Government and Planning Page .2
Page 3
SPL-0615-021442
If you require any further information, please contact Sarah Doring, Principal Planning
Officer, on 07 3882 8411 who will be pleased to assist.
Yours sincerely
Garth Nolan
Manager Planning
enc: Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Attachment 3—Approved plan
Department of Infrastructure, Local Government and Planning Page .3
Page 4
SPL-0615-021442
Our reference: SPL-0615-021442
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Operational Works for Prescribed Tidal Works
7.2.15 Tidal works, or development in a coastal management district—Pursuant to section 255D of
the Sustainable Planning Act 2009, the chief executive administering the Act nominates the
Director-General of Department of Transport and Main Roads to be the assessing authority for the
development to which this development approval relates for the administration and enforcement of
any matter relating to the following condition(s):
1. Provide written notice to: When the
development
Regional Harbour Master authorised under this
Maritime Safety Queensland approval has started,
and when it has
Macarthur Avenue East been completed
PINKENBA QLD 4008
when the development authorised under this approval has started,
and when it has been completed.
These notices must state this permit number, the location and
name of registered place and the condition number under which
the notice is being given.
2. “As Constructed” drawings must be provided to: Within two (2) weeks
of the completion of
Regional Harbour Master the works
Maritime Safety Queensland
Macarthur Avenue East
PINKENBA QLD 4008
3. The construction, operation or maintenance of the structure, and At all times
any ship moored at this structure, must not impede the safe
navigation of other ships or restrict safe access to or from
neighbouring structures.
4. Any ship, dry berth or device (including Air Lifting Pontoons) At all times
berthed, moored or attached to the pontoon/structure must not
exceed the following sizes:
Wet berth - length overall: 7.0m; beam: 3.1m.
5. The pontoon must be constructed totally within the approved At all times
quayline.
6. The structure must be lit/marked in accordance with the following At all times
specifications, such that it does not cause a risk to the safe
Department of Infrastructure, Local Government and Planning Page 4
Page 5
SPL-0615-021442
No. Conditions Condition timing
navigation of other ships:
Lighting must be provided in accordance with section 3 of
AS 4282-1997 'Control of the obtrusive effects of outdoor
lighting'.
7. No part of any structure or any ship berthed at the approved At all times
structure is to encroach within 1.5 metres from the side
boundaries of the allocated water space as shown on the
submitted water allocation plan JSP-SJ-28050, Issue B as
attached.
8. Any debris or similar obstruction encountered whilst undertaking Prior to completion of
the work must be promptly and suitably disposed of at the the works
applicant’s cost.
Our reference: SPL-0615-021442
Attachment 2—Reasons for decision to impose conditions
The reasons for this decision are:
To facilitate the monitoring of the development works for compliance purposes.
To ensure the development does not encroach on the navigable waterway in a way that
impedes the safe passage of vessels.
To ensure that at all times, all lights on or above the development site do not interfere
with safe navigation in surrounding waterways.
To ensure the development does not adversely affect navigable access to neighbouring
premises.
Findings on material questions of fact
The application demonstrates that the pontoon is within the prescribed quayline and
does not impede navigation.
Evidence or other material on which the findings were based
development application
State Development Assessment Provisions published by the Department of State
Development, Infrastructure and Planning
Sustainable Planning Act 2009
Sustainable Planning Regulation 2009
Department of Infrastructure, Local Government and Planning Page 5
Page 6
SPL-0615-021442 Our reference: SPL-0615-021442 Attachment 3—Approved plan Department of Infrastructure, Local Government and Planning Page 6
Page 7
CAST ALUMINIUM
MOORING CLEATS _FENDER RUBBER
TO ALL SIDES
t 5975 T 5000 {
—— = | 7~—
232°2'10"
9140
ALUMINIUM POLE
es
1
3 pen 2500——~] FOR SOLAR LIGHT
i 8 BY OTHERS
t ’
/ LOTO } |
_ Oe
,, BUP 10936 | we 3 sso we
wie sh INSITU PILES
1B BIN
= iy
I tu
1 Zz
t ay cy >
he 7 we <
| : 3
i So
5 8
i EXISTING PILES 8 a
TO BE REMOVED 8
bo Bae pe
STANDARD PIANO HINGE CONNECTION
TO R.C LAND ANCHOR POURED
een Sine Gr CATAL INTO EXISTING PATH RECESS
SITE PLAN & SS
WATER ALLOCATION eee REVETMENT WALL P.B. lI
SCALE 1:500 — — : “TIMBER RET Wal ,
8475 11640:
BERTHING: !
Maximum wet vessel length - 7.0m
Maximum wet vessel beam - 3.1m LAYOUT PLAN
SCALE 1:100
NOTE:
Existing structures shown in
approximate position only.
THE MARINA SPECIALIST Gerd CLIENT: BODY CORPORATE FOR 7 NOOSA PARADE] TLE: SITE PLAN, LAYOUT >
TRADING AS ACN 010633119 2 INDUSTRIAL AVE BP EMG sew: 57 051 074 992 LOT 0 (7) NOOSA PDE & WATER ALLOCATION
pe CDS A 4551 Level 11, North Tower 515 St Pauls Tce, Ph (07) 3100 2198 NOOSA HEADS DRAWING NO:
JSP—SJ-28050
Fortitude Volley, Qk! 400 Fox (07) 3369 9722
ae PHONE (07)5492 5925
16/15 HANDRAIL EXTENSIONS, LIGHT POLE ADDED _ }CLIEN FAX (07) 8492 6699
MILLIMETERS
6 SCALE:
Locked Bug fortitude Volley Old 4006. Email [email protected] ee PROPOSED PONTOON & CATWALK 1:100 1:500
enc VES lanes Par [S
B_ [a3}
(REY DATE AMENDMENT EQ SPeECc?TALI ST
Used in these records
Body Corp for No. 7 Noosa Parade - Concurrence agency response before application is made.pdfRelated documentApplication case desk ↗
About this file
- File size
- 255 KB (small file)
- File type
No other editions are linked here.