Skip to the record
For the highest quality transcripts.

Council archive · source document

Body Corp for No. 7 Noosa Parade - Concurrence agency response before application is made · OPW15/0114

Attached to the e-mail OPW15/0114- Prescribed Tidal Works Application – 7 Noosa Parade.

of 7

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                            SPL-0615-021442




No.         Conditions                                                             Condition timing
            navigation of other ships:
                      Lighting must be provided in accordance with section 3 of
                       AS 4282-1997 'Control of the obtrusive effects of outdoor
                       lighting'.

7.          No part of any structure or any ship berthed at the approved           At all times
            structure is to encroach within 1.5 metres from the side
            boundaries of the allocated water space as shown on the
            submitted water allocation plan JSP-SJ-28050, Issue B as
            attached.
8.          Any debris or similar obstruction encountered whilst undertaking       Prior to completion of
            the work must be promptly and suitably disposed of at the              the works
            applicant’s cost.

Our reference:        SPL-0615-021442


Attachment 2—Reasons for decision to impose conditions

The reasons for this decision are:
 To facilitate the monitoring of the development works for compliance purposes.
 To ensure the development does not encroach on the navigable waterway in a way that
   impedes the safe passage of vessels.
 To ensure that at all times, all lights on or above the development site do not interfere
   with safe navigation in surrounding waterways.
 To ensure the development does not adversely affect navigable access to neighbouring
   premises.

Findings on material questions of fact
 The application demonstrates that the pontoon is within the prescribed quayline and
   does not impede navigation.

Evidence or other material on which the findings were based
 development application
 State Development Assessment Provisions published by the Department of State
   Development, Infrastructure and Planning
 Sustainable Planning Act 2009
 Sustainable Planning Regulation 2009




Department of Infrastructure, Local Government and Planning                                   Page 5

Used in these records

About this file

File size
255 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Body Corp for No. 7 Noosa Parade - Concurrence agency response before application is made.pdf · 255 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.