Council archive · source document
07/0191 - Op Works - Landscaping, Car Parking & Access [As Published] · 142007.191
INTEGRATED PLANNING ACT 1997 Integration of land use and public transport For more information refer to Guide 23, schedule 8A of the IPA, & schedule 2 of the 1P Regulation. Unless you answered “none of the above”, the application triggers referral to QT as a concurrence agency. IDAS Assessment Checklist, Version 18.0, 10 November 2006 22. The application involves: (tick the applicable box/es)— (1 (i) a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that schedule. (1 (ii) reconfiguring a lot— C1 (a) _ onland that is completely or partly within a public transport corridor, and the total number of lots increases; (1 (b) on land that is completely or partly within a future public transport corridor or an airport's public safety area; Ci (ce) ontand thatis within 400m of a public passenger transport facility or a future public passenger transport facility, and the total site area is 5000m2 or greater; (1 (¢) _ for a residential purpose within the 25 ANEF contour for an airport; (J (e) for a residential purpose resulting in 100 or more allotments. C1 (iii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, on land that— Cl (a) __ is completely or partly within a public transport corridor or a future public transport corridor; ( (b) _ will result in work that encroaches into an airport's operational airspace. LK] (iv) none of the above. Railway safety and efficiency 23. The application involves: (tick the applicable box/es)— For more information refer to Guide 23, schedule 8A (1 (i) a material change of use assessable against the planning scheme for a purpose Untesren ae ee mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that application triggers referral to QT as a concurrence schedule. agency. D (ii) reconfiguring a lot— C)(a)__ onland that is completely or partly within a future public transport corridor, future railway land or a railway tunnel easement; (J (b) on land that is within 400m of a Citytrain passenger railway station or a future Citytrain passenger railway station, and the total site area is 5000m? or greater; C1 (c) _ onland that abuts rail corridor land, commercial corridor land or future railway land, and the total number of lots increases; (1 (d) — ontand that abuts rail corridor land, commercial corridor land or future railway land and an easement abutting the corridor or future railway land is created; Ci(e) on tand that is completely or partly within 100m of, and abutting an approach to, a railway level crossing, and the total number of lots increases; (1 (f) for a residential purpose resulting in 100 or more allotments. U (ii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, involving extracting, excavating or filling greater than 50m3, on land that— D(a) _ is completely or partly within rail corridor and or commercial corridor land, and the work is not for rail transport infrastructure or other rail infrastructure; (1 (b) is completely or partly within future railway land, or a railway tunnel easement; (J (©) abuts rail corridor land, commercial corridor land or future railway land, and the work is within 25m of the railway boundary. EX] (iv) none of the above. Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to For more information refer to schedule 2of the IP Regulation Unless you answered "none of the above’, the application triggers referral to the holder of pipeline licence No 1 issued under the Petroleum Act 1923, currently Santos QNT Pty Ltd, for advice Brisbane strategic pipeline, and involves: (tick the applicable box/es)— C () a materiat change of use assessable against the planning scheme and not associated with reconfiguring a lot, and any structure or work will be tocated wholly or partly in the easement. D (ii) reconfiguring a lot C1 (iii) operational work assessable against the planning scheme, thats filling, excavation, compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the work is located wholly or partly in the easement. EX] (iv) none of the above. Page &
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0191 - Op Works - Landscaping, Car Parking & Access [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.