Skip to the record
Noosa’s premier civic archive.

Council archive · source document

07/0191 - Op Works - Landscaping, Car Parking & Access [As Published] · 142007.191

of 44

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

   

Operational &/or building work

assessable against a local government's planning scheme

Part E, Version 2.0, 4 October 2004

 

 

Completion of atl question

engineering plans and other plans, detailed engineering plans for subdivisional works

on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed

and conceptual design plans for engineering & building work when the application does

not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.

Nature of the application

A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development to occur.
The types of work that are assessable against
a planning scheme are determined by the
scheme for a particular local government and
will vary across the State.

To determine the types of work that are
assessable under a particufar ptanning
scheme, contact the relevant local

1,

This application is for (tick one (1) or both if applicable)
(CJ Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc

L _|
AND / OR

mabcvclopment permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc

[VG EER ¥ CPOSCAPING AS REOS FZ MC

 

 

 

 

 

government. 2. Are the works subsequent to a a approval?
CJ Nno ES - provide details of all previous approvals (eg. file references)
a 7
3. _ Is the subdivision for a canal estate?
Ono (Yes
Portable Long Service Leave levy (if |4. Is payprént of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
i
app a : ) . , ES - complete Q5
Prior to issuing a development permit for the
works, the assessment manager is required (1 NO - 05, 6 & 7 do not apply
by law to ‘sight" an approved form, issued by .
Qleave, which signifies that the PLSLlevy |5. Has the PLSL levy been paid?
has been paid.
@ Wo — completeQ6
O = the applicable levy must be paid before @ development permit can be given for the works
6. How much was paid?
7. Whatis the receipt number of the payment?

 

 

| Z )

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information

requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager) :

 

DATE RECEIVED

 

 

REFERENCE
NUMBERIS

 

 

 

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0191 - Op Works - Landscaping, Car Parking & Access [As Published].pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.