Skip to the record
Every meeting, every word.

Council archive · source document

07/0191 - Op Works - Landscaping, Car Parking & Access [As Published] · 142007.191

of 44

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT i997
State-controlied road matters (cont)

IDAS Assessment Checklist, Version 18.0, 10 November 2006
(1 (ii) development on land not contiguous to a State-controlled road and -
1 (@) material change of use -
« assessable against ihe local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;

CO (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
CI (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)-
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.

XX] (ili) none of the above

 

Clearing vegetation
For more information refer to Guide 12.

Unless you answered “none of the above” to Q3, the
application requires assessment by the Departmen
of Natural Resources Mines and Water (NRMW),
{fan agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.

Ifyou ticked Q3(i) or {ii), your application requires
feferral to NRMW for assessment regardless of
whether vegetation clearing is proposed or not.

The application involves: (tick applicable box/es)
(i) material change of use —
(a} assessable against the planning scheme;
{b) on alot containing —
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
» ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
Oi (ii) reconfiguring a lot -
(a) on alot containing a category 1, 2 or 3 area shown on a property map of

assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
DO (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b} not associated with a materiat change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a tot mentioned in (ii) - complete Part J of
Form 4

(iv) none of the above.

 

Strategic port land
For more information refer to Guide 11.

Mf you ticked (I) - the relevant Port Authority is the
assessment manager for the application.

Ifyou ticked (ji) Queensland Transport is a
concurrence agency for the application.

 

The application involves:

C1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part t of Form 1

C1 (i) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1

(iii) none of the above

 

Acid sulfate soils

For more information refer to Guide 10,

Unless you answered “none of the above" to OS, the
application requires assessment by Department of
Natural Resources Mines and Water (NRMW).

if an agency other than NRMW is the assessment
manager for the application, NRMW is an advice
agency for the application in relation to this matter.

 

 

The application involves development on land situated in an identified local government area

and where the surface of the land is: (tick applicable box)

CA (i) below 20m AHDS and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or

C1 (ii) at or betow 5m AHD and the development will involve filing the site with 1000m3 or more
of material

1 (iii) none of the above

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Douaglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Midum Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiara, Torres, Townsville, Whilsunday.

6 Australian Height Datum (AHD).

Page 2

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0191 - Op Works - Landscaping, Car Parking & Access [As Published].pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.