Original source · versioned page text
RFI - Proposal Plans_Sections
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn SETABCK
SETABCK
NGL +15m
10m
BDY
6m
RL 33000 - ROOF - UPPER
RL 32000 - ROOF
EXISTING TREE CANOPY TO
BE RETAINED
RL 29500 - LEVEL 03 - UPPER LOFT
RL 28500 - LEVEL 03
C'DOR TYPICAL ROOM BALC
RL 26000 - LEVEL 02 - UPPER
RL 25000 - LEVEL 02
C'DOR TYPICAL ROOM BALC
RL 21500 - LEVEL 01
SERENITY
CLOSE NGL
GYM
RL 18000 - GROUND FLOOR
QUIET POOL
POOL FENCE
RL 14500 - LOWER GROUND
RL 11000 - BASEMENT
SECTION LONG 1 WESTERN END
J1 1 : 200
SETABCK
SETABCK
BDY
10m
6m
NGL +15m
RL 33000 - ROOF - UPPER
RL 32000 - ROOF
C'DOR
BALC VILLA
RL 29500 - LEVEL 03 - UPPER
RL 28500 - LEVEL 03
C'DOR
BALC TYPICAL ROOM
RL 26000 - LEVEL 02 - UPPER
RL 25000 - LEVEL 02
LIBRARY / POOL BAR FUNCTION ROOM
GAZEBO GAZEBO GAZEBO GAZEBO GAZEBO GAZEBO GAZEBO GAZEBO
GAMES ROOM PATH
RL 21500 - LEVEL 01
POOL EQUIP.
POOL
RETAIL RETAIL CARPARK
RL 17.500
AUDITORIUM RL 17500 - GROUND FLOOR - PARKING
CARPARK RAMP
NGL
1:20
CARPARK CARPARK
RL 14.500 RL 14.500
RL 14500 - LOWER GROUND
CARPARK RAMP
1:20
CARPARK
RL 11.000
RL 11000 - BASEMENT
SECTION LONG 1 EASTERN END
J2 1 : 200
SETABCK
SETABCK
10m
BDY
BDY
6m
NGL +15m
RL 33000 - ROOF - UPPER
RL 32000 - ROOF
C B A
03-01 03-01 03-01
RL 29500 - LEVEL 03 - UPPER D
RL 28500 - LEVEL 03 03-02
E
03-02
RL 26000 - LEVEL 02 - UPPER
LOFT LOFT LOFT LOFT LOFT PLANT
ROOF PLANT
RL 25000 - LEVEL 02 J2
03-03
SERENITY F
CLOSE TYPICAL TYPICAL TYPICAL TYPICAL TYPICAL TYPICAL STORE C'DOR TYPICAL ROOM BALC
ROOM ROOM ROOM ROOM ROOM ROOM 03-02
RL 21500 - LEVEL 01
ENVIROMENTAL G
H2
MANAGEMENT & 03-03
03-04
STORE C'DOR TYPICAL ROOM BALC CONSERVATION ZONE
NGL GYM
RL 18000 - GROUND FLOOR
C'DOR TYPICAL ROOM BALC
LIFT STAIRS
RL 14500 - LOWER GROUND
4m WIDE
LOADING EXTERNAL J1
O/F PATH
RAMP BAY DAY SPA TREATMENT POOLS 03-03
RL 11000 - BASEMENT
FIRE ISOLATED
CORRIDOR
H1
03-04
SECTION G - WEST WING
G 1 : 200
Keyplan Document Control Status Project Northpoint Drawing Title
RICHARDS&SPENCE A
Rev Description
DEVELOPMENT APPLICATION
By
GS
Date
06.10.22
3 - 7 SERENITY CLOSE SECTIONS - SHEET 3
CHECK ALL DIMENSIONS ON SITE BEFORE
FABRICATION OR SETOUT
B DA ISSUE GS 07.10.22 PRELIMINARY
Level 1, Shop AM5 Ada Lane © COPYRIGHT RICHARDS AND SPENCE PTY LTD
C DA RFI CONSULTANT REVIEW GS 06.05.23 NOOSA HEADS Drawn: Proj Director:
AS & IR
D DA RFI PRELIMINARY ISSUE GS 16.05.23 JP
46 James Street
E FOR INFORMATION GS 22.05.23 Proj Architect:
Fortitude Valley ANY FORM OF REPRODUCTION OF THIS F FOR INFORMATION GS 29.05.23 Client:
Brisabane QLD 4006 DRAWING IN FULL OR PART WITHOUT THE GS
Tel: 617 3257 0077 WRITTEN PERMISSION OF RICHARDS AND
G DA RFI ISSUE MP 23.06.23
CALILE MALOUF Cad File: Scale:
[email protected] SPENCE PTY LTD CONSTITUTES AN
H
I
DA RFI ISSUE
DA RFI ISSUE
GS
GS
30.06.23
05.07.23 INVESTMENTS As indicated@A1 2100004
[email protected] INFRINGMENT OF COPYRIGHT J DA RFI ISSUE GS 12.07.23 Revision:
Drawing Number:
SD-A-03-03 J
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.