2019-01-14 General Committee Agenda - Attachment 2 to Item 2 - Aquatic Restoration and Management Options
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Management options
North Shore Create a “Restoration Zone” to restrict access
management/vehicle Provide a buffer between recreational and commercial activities
closure Ensure that any conservation zone includes both terrestrial dunes, beach
and near-shore areas
Wake management Manage boat speed and wake
“between the lakes” Improve commercial boat design
Estuary zoning Reduce the recreational catch
(emphasis on rec. Increase catch and release programs including training / education
fishing) Provide support for improved fish habitat
Permitting
Cessation of Closure of fishing areas particularly between the lakes
commercial prawn Buyback of fishing licences
trawling Modified fishing practices
Decreased or limited catch (size or timing)
Better management of Limit catch on Noosa North Shore
commercial mullet Provide pathways to increase product value
fishery Modify fishing practices - education
Transform gill-net Transform gill net industry to high value line caught industry
fishery to higher value
fishery
Stormwater Improve the quality of water runoff flowing into the estuary through
management wetlands and other design features such as flow restrictors and pollution
traps
Expert evaluation of options
Following the identification of the options presented above, the experts were asked to
provide their judgment on the likely consequence of these options for the indicators
identified earlier. Initially judgement was sought on whether undertaking the activities
associated with an option would lead directly to an increase (or possibly a decrease) in the
abundance of each indicator group, and then subsequently the relative magnitude of the
likely increase. These assessments are presented in Table 3.
In addition to assessing the consequence of options for the ecological indicators, the experts
were asked to identify other benefits likely to be associated with undertaking each option.
For each option, the expert group also identified some key uncertainties associated with the
option. These uncertainties can help flag priority science tasks needed in order to more
thoroughly evaluate that option. Where possible, the experts were asked for indicative costs
of the options. In most cases these costs were highly uncertain because there were different
ways that each option could be executed and financed. Finally, for each option the experts
were asked to conduct a pre-mortem. This is a risk identification exercise where each person
was asked to imagine that the option had been undertaken and it was now 5 years into the
future and something had gone very wrong with the project. Each person is then asked to
describe what they imagined went wrong with the project. This has proved an effective way
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.