Original source · versioned page text
Planning Report
5.4.2 SUSTAINABLE BUILDING DESIGN CODE
Performance Outcome Acceptable Outcome Response
PO2 AO2.1 Rain water storage can be
Development maximises water If for accommodation activities, conditioned as part of the
efficiency on site by a minimum 3,000 litres of rain approval.
incorporating rainwater water storage is provided per
collection and reuse measures dwelling and reused for
for non-potable purposes such non-potable purposes and
as irrigation. incorporated into a stormwater
management plan for the
development.
5.5 PLANNING SCHEME OVERLAYS
Overlay Comment
Please refer to Determination of Acid Sulfate Soil
Properties, prepared by Bio-Track Pty Ltd. To be
addressed at the Operational Works stage.
The proposed FFL is 2.550m AHD, as shown on
the Proposal Plans.
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.