Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Planning Report

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

       frontage, whichever is the lesser. However, AO15.2 of the Medium Density Residential zone
       code requires that where multiple garages face the street, they are separated by a minimum
       of 2 metres or are staggered in setback by a minimum of 1 metre. The development provides
       a 4.57 metre wide landscaped separation between the proposed garages. In addition, the
       upper level sits forward of the lower level, which further assists in the garages dominating the
       street and building design.

   ●   Front fencing and landscaping: The proposed fence is setback approximately 1.2 metres from
       the site frontage, and provides a recess to 1.01 metres, which highlights a clearly identifiable
       vehicular access point. The proposed fencing incorporates a mix of building materials. A
       further 800mm of landscaping is provided on the inside of the fence, providing a total of a 2
       metre wide landscape strip along the entire street frontage, with the exception of the
       driveway.

   ●   Building materials: Please refer to Architectural Plans for the building materials palette, which
       is considered to achieve AO18 of the Medium Density Residential zone code.

   ●   Roof pitch: A 5o roof pitch is proposed and eaves are proposed to 75% of the perimeter of
       the roof.

   ●   Setbacks: Setbacks are compliant, with the exception of the 2.5m side setback to buildings
       over 7.5m. Refer to section 5.2 for justification of this non-compliance.

   ●   Filling and overlooking: The plans show the natural ground level and proposed ground level.
       The proposal minimises the extent of overlooking through frosted glass, screening and
       planter boxes.

   ●   Section plans: Refer to Section Plans within the Architectural Plans.

   ●   Landscaping: 40% of landscaping is achieved, 60% of which is proposed to be soft
       landscaping.

   ●   Swept paths: Swept paths are currently being prepared and will be provided under separate
       cover.

   ●   Preliminary stormwater management plan: Refer to Stormwater Management Report
       prepared by Westera Partners.

   ●   Acid Sulfate Soils: Refer Acid Sulfate Soils Report.

   ●   Driveway and on-street parking: This is currently being prepared and will be provided under
       separate cover.

It is considered that the revised design suitably addresses the key concerns outlined in the
pre-lodgement meeting.




                                                                                                      4
Log in to download the original file

Planning Report.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.