15 September 2008
Tim Biggs
CARE Ken Hicks & Associates Pty Ltd
PO Box 6380
MAROOCHYDORE BC QLD 4558
Dear Sir
Change to an Existing Approval
Integrated Planning Act 1997
I refer to your request to make a change to an existing approval. On 11 September 2008 Council
decided your requested changes.
Details of the decision with the consolidated conditions are as follows:
1 APPLICATION DETAILS
Application No: 23218 DA
Street address: 14 Park Road, Noosa Heads
Real property description: Lot 3 RP 122368
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 2 September 2004 decided to issue the following type of approval: -
Development Permit for Material Change of Use - Dwelling in a Non Urban Zone
Development Permit for Lot Reconfiguration - Reconfigure a Lot
In relation to a request to change the development approval, Council on 29 March 2007 decided to:
A. Approve the change with amendment to Conditions 1, 7, 23, 24, 27 & 43.
B. Include one additional condition
C. Issue a Compiled Decision Notice
In relation to the request to make a change to the existing approval, Council on 13 December 2007
decided to:
A. Approve the change with amendment to Conditions 1, 3, 4, 18, 27, 30 & 43.1
B. Refuse to change Conditions 21, 29 and 35 because of possible impacts on Council
infrastructure.
C. Amend the Further Development Permits Required section of the Development Permit to only
require operational works for the stormwater.
Page 1 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 pages
Page 2
2003/220729
D. Issue a Compiled Decision Notice.
In relation to your request to extend the currency period for the above development approval,
Council on 11 September 2008 decided to:
A. Extend the currency period until 2 March 2010
B. Approve to change Condition 14
C. Issue a Change to an Existing Approval
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
MATERIAL CHANGE OF USE CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered A01a, A02, A03 & A06 to
A13 prepared by Morq and dated 17 September 2007 and as may be amended by these
conditions.
2. The use and all activity on the site, including construction and excavation, is to be carefully
controlled and interference with vegetation kept to an absolute minimum to ensure that the
proposed use does not undermine or compromise the Noosa Hill Development Control Plan
and the Strategic Plan objective of preserving the natural character and appearance of Noosa
Hill. The approval is to be implemented with this objective as the overriding factor.
3. All roofing of the structures on site are to be of a non-reflective nature and coloured with
muted earth tones. All structures are to use colours that integrate with the natural
environment and be of muted earth tones of browns, greens, ochres, greys etc.
4. The glass provided along the western elevation of the dwelling house is to be non reflective.
5. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
6. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan is to be prepared and
submitted for approval. The landscaping is to be completed prior to the premises being
occupied and maintained at all times thereafter. The landscape plan is to clearly indicate:-
6.1. the retention of vegetation in accordance with Drawing No. GG655 LA 01 Sheet 1 Issue
Q dated March 2003 drawn by LandGraphics (including Box trees 21, 22 & 28) and
reinforcement planting of endemic species on the site;
6.2. the retention of all existing vegetation on the site outside of the approved building
footprint; and
6.3. the proposed means of protecting trees to be retained, particularly during the
construction process.
7. All works shall be carried out in accordance with the recommendations of the Tree Report
dated 7 July 2004 and the Arborist Report dated 19 January 2007 prepared by Leaf & Limb
Horticultural Consultancy, with tree 24 to be replaced by 2 x 45 litre native trees.
8. No fencing is permitted to be erected across the Park Road frontage of the site.
Page 2 of 12
Page 3
2003/220729
9. No pathway/accessway is permitted through the site to Park Road.
10. All external lighting is to be hooded and angled away from neighbouring properties and main
beach.
11. Security in the form of a cash bond or trading bank guarantee to the sum of $100,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
12. The requirements of this development approval are to be satisfied, prior to the commencement
of the use of the premises. Council reserves the right to call upon the bond or guaranteed sum
referred to in this approval to effect compliance with conditions.
13. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for building works.
14. The Development Permit for a material change of use of premises lapses if the use has not
happened by 2 March 2010, unless an application to extend the currency is approved by
Council.
Land Development
15. A vehicular access driveway to serve the site shall be constructed from the Allambi Rise
frontage of the site with a maximum width of 3.0 metres.
The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to
grades that do not comply with AS2890.1-1993 and AS2890.2-1989, Council will require that
the driveway be removed and reconstructed to levels that do comply.
16. All vehicles shall enter and leave the site in a forward direction.
Vehicle Access Easement
17. An easement for vehicle access and services shall be created over Lot 65 on RP 52918 to the
benefit of Lot 3 on RP 122368. The easement shall be of minimum width of 3.0 metres. The
width shall be increased where necessary to accommodate services or to provide
maneuvering space if necessary. A survey plan of the proposed easement shall be submitted
to Council for approval.
The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that
the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to
promptly.
Any amendments required by Council’s Solicitor must be corrected immediately. In this regard
the registration of this easement with the Land Title Office shall be finalised prior to obtaining a
Development Permit for Operational Works.
Carparking
18. Carparking shall be provided within the site as shown on drawing number A01 dated
th
September 7 2007 submitted by MORQ*, except as modified herein.
19. A minimum of 2 covered carpark spaces shall be provided on site.
Page 3 of 12
Page 4
2003/220729
20. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for
user class 1 except the minimum head clearance (headroom) at any point shall be 2.3m.
Stormwater Drainage
21. All stormwater drainage shall be collected and discharged on site with an overflow pipe
connected to Councils existing stormwater system in Park Road. The design shall incorporate
some means of reducing the head of the discharge prior to entry to Council’s system. In this
regard, plans shall be prepared by a Registered Professional Civil Engineer and submitted to
Council prior to obtaining a Development Permit for Operational Works.
22. All site stormwater drainage shall be by means of a gravity systems.
Sewer Mains
23. The development site shall be connected to the Council’s existing sewer manhole
(NH01/33/03) located outside the southwest corner of the property.
24. The sewer connection to the site shall be in accordance with Council’s standards and
requirements at no cost to Council. The applicant is advised that a Compliance Permit for all
plumbing and drainage works within the boundaries of the development site shall be obtained
from Council’s Plumbing Services Section prior to obtaining a Development Permit for Building
Works.
Town Water Supply
25. The site shall be connected to Council’s existing town water supply in Allambi Rise and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
26. Each water connection to the water reticulation system shall extend to the property boundary
and be metered.
Geotechnical Issues/Construction
27. All construction works on site shall accord with the Geotechnical Reports prepared by Golder
Associates dated July 2003 and Morrison Geotchnic dated 23 November 2006 and
subsequent reports specific to the amended design (including the pool), subject to
amendments to address condition No. 43, with cut and fill for retaining walls not to exceed a
maximum depth of 1.5 metres.
The applicant’s geotechnical engineer is required to be on site for the whole of the time during
any excavation and house foundations including the construction of the retaining walls and the
footing for the falsework. Such work shall only be carried out during dry weather conditions.
The geotechnical engineer shall also inspect the site periodically throughout the construction
of the dwelling and certify the stability of the structure upon its completion. Should any risk of
sand movement occur - all work shall be suspended until steps (approved by the Geotechnical
engineer) have been taken to ensure that no further slippage will result.
28. The disposal of sand, soil or any materials created by the construction of the dwellings shall
be removed in accordance with the Construction Management Plan. Details of the method of
this disposal of materials are to be submitted to Council at the Building Application stage. Not
more than one vehicle at a particular time will be parked in Park Road for the removal of, or
the delivery of, materials associated with the site and no such vehicle shall remain overnight.
No materials are permitted to be stored within the road reserve.
Page 4 of 12
Page 5
2003/220729
29. A programme of works is to be submitted with any application for any Development Permit for
Operational Works detailing the construction schedule and proposed environmental protection
measures, including a vegetation management plan, which addresses stabilisation of
disturbed areas.
Where the program is changed for any reason whatsoever, a copy of the revised program
shall be submitted to Council’s Works Inspector within seven (7) days.
30. A Traffic Management Plan for the Construction of the Dwelling addressing the access to the
site, the locating of equipment, carparking arrangements for workers on the site and any
potential conflicts with local traffic shall be submitted to Council for approval prior to works
commencing on site.
31. Prior to the issue of Building Permit the builder shall submit written acknowledgment that
building works shall proceed in accordance with the 9 tonne load limit applicable to Park Road,
unless varied by Council.
32. At the completion of construction the consulting geotechnical engineer will certify that all works
were carried out in accordance with their recommendations and that the structures and the site
are stable.
33. A Condition Survey is to be carried out on adjoining buildings, structures and services prior to
any construction works taking place on site. If distress already exists, a photographic survey
shall be undertaken, the distress measured and a plan to monitor changes to distress shall be
implemented. A copy of this report is to be submitted to Council within 5 business days of
survey and prior to construction work proceeding.
34. The use of vibratory equipment of any kind is not permitted to be used, including vibrating
rollers, the use of vibrating installation techniques for sheet piling and other construction
vibrations caused by excavating, earthmoving or demolition machinery or other similar
construction techniques.
Erosion and Sediment Control
35. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Vegetation Protection
36. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement shall
be constructed so as not to damage the tree or their root system and in this regard temporary
fencing shall be provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
Page 5 of 12
Page 6
2003/220729
Roadworks Contributions
37. A roadworks contribution of $2,524 towards the Coastal Major Road Network in accordance
with Planning Scheme Policy PSP42, shall be paid to the Council prior to obtaining a
Development Permit for Operational Works. This amount will be subject to variations in the
Price Index, All Groups Brisbane from March 2004 until the date of payment.
Pathway Contributions
38. A pathway contribution of $246 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior
to obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Price Index, All Groups Brisbane from March 2004 until the date of payment.
General
39. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
40. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
41. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Building
42. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height of 9 metres above natural surface.
43. All building works shall be in accordance with the Geotechnical reports prepared by Golder
Associates dated July 2003 and Morrison Geotchnic dated 23 November 2006 subject to the
following conditions:-
43.1 An amended Geotechnical Report addressing the design amendments associated
with this approval shall be submitted to Council for its information prior to the
application for Operational Works;
43.2 There is to be no uncontrolled discharge of water onto the slope;
43.3 Stripping of vegetation for construction purposes should be minimised. If vegetation
is destroyed it should be reinstated immediately after construction is completed;
43.4 Additional load due to fill, construction equipment or stockpiled materials should not
be located on the dune slope;
43.5 The use of vibratory equipment of any kind is not permitted to be used, including
vibrating rollers, the use of vibrating installation techniques for sheet piling and other
construction vibrations caused by excavating, earthmoving or demolition machinery
or other similar construction techniques;
43.6 The construction management plan is to be adhered to;
43.7 Copies of all inspection reports by engineers are to be submitted to Council within 5
business days of the inspection taking place;
Page 6 of 12
Page 7
2003/220729
43.8 The applicant’s Geotechnical engineer will be required to be on site for the whole of
the time during any excavation. The construction of the whole of the foundations
and retaining walls is to be supervised and directed on site by a consulting
Geotechnical engineer. No work of any such kind relating to the foundations shall
be carried out if he is not on the site and supervising and directing this work. Such
works shall only be carried out during dry weather conditions and if there is a risk of
sand movement occurring, all work shall be suspended until such steps, approved
by the applicant’s Geotechnical engineer and the Council’s Building Surveyor, have
been taken to ensure that no further slippage will result.
43.9 Survey marks should be established on the structure to monitor the construction and
surrounds for movement. Monitoring for any potential movement shall be carried out
at regular intervals of a maximum length time of three (3) months for at least the first
year from the use commencing. The monitoring results shall be assessed by a
geotechnical engineer and may be scaled down or stoped depending on the results
and subject to the geotechnical engineer recommendations.
Additional Condition 29/03/07
44. The sewer connection shall be undertaken in accordance with an approved Arborist’s report
and the following requirements:
44.1 The route for the service trench shall be a minimum of 1.5 metres clear of all trees
and shrubs, unless otherwise agreed to by the Manager, Land Use.
44.2 An arborist shall be on site all times supervising the works being undertaken.
44.3 Prior to commencing any works, the route for the service trench shall be pegged and
inspected by Manager, Land Use.
44.4 Prior to excavation existing mulch/leaf cover material over proposed trench shall be
raked back and stockpiled for covering of trench area after completion.
44.5 Works shall be undertaken in a progressive manner and route reinstated as works
progress.
44.6 Uphill anchor roots of trees shall not be disturbed.
44.7 All works shall be carried out by hand excavation other then the sewer trench under
existing road pavement.
44.8 All excavated material shall be placed on a ‘tarpaulin’ or the like laid immediately
adjacent to the proposed trench.
44.9 Excavated material shall be used as bedding and backfilling of trench.
44.10 Where works disturb the understorey vegetation, rehabilitation works shall be
undertaken to the reasonable satisfaction of Manager, Land Use.
RECONFIGURE A LOT CONDITIONS
1. For the purpose of these conditions, the following definitions apply: -
A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
2. Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the currency period is two
(2) years from the day this permit takes effect during which time all conditions must have been
complied with and the Plan of Survey lodged with the Council for endorsement.
3. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form with
the fees prescribed in Council's adopted fee schedule.
Page 7 of 12
Page 8
2003/220729
4. Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and charges
due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior
to endorsement of the Plan of Survey for each stage.
5. Prior to undertaking any excavation, the person acting on this permit shall contact public utility
service providers to ascertain the location of their underground services.
6. The person acting on this permit shall apply and obtain for all other necessary permits
including crane permits, road opening permits, hoarding permits, footpath occupation permits
and/or any other approvals required under any other Act.
7. Prior to commencement of work relating to a Development Permit for Operational Works, the
Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
pavement, footpath, kerb and gutter, or other Council property damaged as a result of
construction of the proposed development.
If any person acting under this permit damages any Council property or facilities (such as
underground drainage, water supply and sewerage) , through any cause whatsoever in the
course of, directly or indirectly carrying out development, that person shall forthwith notify the
Manager - Land Development and shall forthwith rectify that damage at its cost and to the
satisfaction of the Manager - Land Development. Alternatively, the Applicant may request the
Council to carry out the rectification works.
Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall
be undertaken by either Council or a Council approved contractor.
In all cases, Council reserves the right to carry out rectification works in an emergency and
where no reasonable attempt has been made to complete the rectification works as part of the
development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the
endorsement of the Plan of Survey.
8. Prior to commencement of the permitted use the person acting upon this permit shall
demonstrate the legal right to the easement for access over Lot 65 on RP 52918. Where no
legal right exists, this permit shall lapse.
9. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's
Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the Plan of
Survey at the Land Titles Office, the Title Deed and the easement documents will also be
lodged and any additional Titles Office forms or requisitions requiring the consent of Council
being attended to forthwith.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the assessment
manger’s conditions.
Page 8 of 12
Page 9
2003/220729
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Building Building Works
Operational Works Stormwater
11 SELF ASSESSABLE CODES
Not applicable
12 SUBMISSIONS
There were five (5) properly made submissions about the application.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Page 9 of 12
Page 10
2003/220729
DECISION NOTICE HISTORY
Original Decision Notice issued 2 September
2004.
Compiled Decision Notice issued 29 March
2007 with amendment to Conditions 1, 7, 23,
24, 27 & 43 and inclusion of one additional
condition.
Compiled Decision Notice issued 13
December 2007 with amendment to
Conditions 1, 3, 4, 18, 27, 30 & 43.1. Refuse
to change Conditions 21, 29 & 35.
Change to an Existing Approval issued 11
September 2008 with amendment to
Condition 14.
Yours faithfully,
Kerri Coyle
MANAGER – LAND USE
Page 10 of 12
Page 11
2003/220729
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (5) If an application is processed under section
Planning Act (Chapter 4). 6.1.28(2), appeal rights for submitters for the
application are available only for the aspects of the
Division 8 - Appeals to court relating to
development that would have required public
development applications
notification under the repealed Act.
Appeals by applicants
(6) If an application involves assessment against a
4.1.27.(1) An applicant for a development application concurrence agency code, appeal rights for
may appeal to the court against any of the following- submitters for the application are not available against
(a) the refusal, or the refusal in part, of a development the part of the approval that represents the
application; concurrence agency’s response for the code.
(b) a matter stated in a development approval, Appeals by advice agency submitters
including any condition applying to the 4.1.29.(1) An advice agency may, within the limits of
development, and the identification of a code its jurisdiction, appeal to the court about the giving of
1
under section 3.1.6; a development approval for a development
(c) the decision to give a preliminary approval when a application if-
development permit was applied for; (a) the development application involves impact
(d) the length of a currency period; assessment; and
(e) a deemed refusal. (b) the advice agency told the applicant and the
(2) An appeal under subsection (1)(a) to (d) must assessment manager to treat its response to the
be started within 20 business days (the “applicant’s application as a submission for an appeal.
appeal period”) after the day the decision notice or (2) The appeal must be started within 20 business
negotiated decision notice is given to the applicant. days after the day the decision notice or negotiated
(3) An appeal under subsection (1)(e) may be decision notice is given to the advice agency as a
started at any time after the last day a decision on the submitter.
matter should have been made. Appeals for matters arising after approval given
Appeals by submitters (co-respondents)
4.1.28.(1) A submitter for a development application 4.1.30.(1) For a development approval given for a
may appeal to the court about- development application, a person to whom any of the
following notices have been given may appeal to the
(a) the giving of a development approval, including court against the decision in the notice-
any conditions (or lack of conditions) or other
provisions of the approval; or (a) a notice giving a decision on a request for
extension of the currency period for an approval;
(b) the length of a currency period for the approval.
(b) a notice giving a decision on a request to make a
(2) The appeal must be started within 20 business minor change to an approval.
days (the “submitters appeal period”) after the day
the decision notice or negotiated decision notice is (2) The appeal must be started within 20 business
given to the submitter. days after the day the notice of the decision is given
to the person.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the (3) Subsection (1)(a) does not apply if the
decision. approval resulted from a development application
(superseded planning scheme) that was assessed as
(4) If an application involves both impact if it were an application under a superseded planning
assessment and code assessment, appeal rights for scheme.
submitters are available only for the part of the
application involving impact assessment. (4) Also, a person who has made a request
mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(5) An appeal under subsection (4) may be started
1
Section 3.1.6 (Preliminary approval may override local at any time after the last day the decision on the
planning instrument) matter should have been made.
Page 11 of 12
Page 12
2003/220729
Division 9 - Appeals to court about other matters Appeals by applicants
Appeals for matters arising after approval given 4.2.9(1) An applicant for a development application
(no co-respondents) may appeal to the Building and Development Tribunal
4.1.31.(1) A person to whom any of the following against any of the following-
notices have been given may appeal to the court (a) the refusal, or the refusal in part, of a development
against the decision in the notice- application;
(a) a notice giving a decision on a request to change (b) a matter stated in a development approval,
or cancel a condition of a development approval. including any condition applying to the
2
(b) a notice under section 6.1.44 giving a decision to development, and the identification of a code
3
change or cancel a condition of a development under section 3.1.6;
approval. (c) the decision to give a preliminary approval when a
(2) The appeal must be started within 20 business development permit was applied for;
days after the day the notice of the decision is (d) the length of a period mentioned in section 3.5.21
given to the person. currency period;
(3) Also, a person who has made a request (e) a deemed refusal.
mentioned in subsection (1)(a) may appeal to (2) An appeal under subsection (1)(a) to (d) must
the court against a deemed refusal of the be started within 20 business days (the “applicant’s
request. appeal period”) after the day the decision notice or
(4) An appeal under subsection (3) may be started negotiated decision notice is given to the applicant.
at any time after the last day the decision on (3) An appeal under subsection (1)(e) may be
the matter should have been made. started at any time after the last day a decision on the
Appeals against decisions to change approval matter should have been made.
conditions under the repealed Act The Registrar for the Building and Development
4.1.33A.(1) A person who is dissatisfied with a Tribunal may be contacted at the website
decision made on an application to change the http://www.localgovernment.qld.gov.au/
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises or
the erection of a building or other structure permitted
by the planning scheme may appeal to the court
against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
For Building Works Only
Rights of appeal conferred by Section 4.2.9 of the
Integrated Planning Act 1997 as follows:
Division 3 – Appeals to tribunals relating to
development applications
2
Section 6.1.44 (Conditions may be changed or
3
cancelled by assessment manager or concurrence Section 3.1.6 (Preliminary approval may override local
agency in certain circumstances) planning instrument)
Page 12 of 12
Used in these records
Decision Notice - Change to an Existing Approval - 010.2003.00220729.004 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 71 KB (small file)
- File type
No other editions are linked here.