Original source · versioned page text
Delegated Report - Code - Planning OPW26 0082 [As Published]
17. A Performance Bond of $2000 must be submitted to Council following clearing works to
ensure compliance with required rehabilitation replacement planting.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
rehabilitation conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
25030-DET-02 4 Contour and Detail Survey, prepared by Macro 19 May 2026
Spatial Solutions
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
ADVISORY NOTES
Prestart, On and Off Maintenance, Rehabilitation Inspections Request
1. Contact Council on 5329 6500 to arrange a prestart meeting or an inspection giving a
minimum of five business days’ notice of preferred inspection time.
Qualified Person
2. Qualified Person, for the purpose of:
a. Undertaking rehabilitation planting and establishment works is considered to be a
person with five years current experience in revegetation and regeneration.
b. Undertaking, supervising tree works and preparing arboriculture certification, is
considered to be a person with a minimum three years current experience in tree
protection, hazard identification/mitigation and Specifying Trees – a guide to
assessment of tree quality (NATSPEC) assessment and either:
i. International Society of Arboriculture (ISA) certification; or
ii. A Diploma of Arboriculture.
c. Managing Fauna protection is considered to be an Ecologist or Environmental Scientist
with a minimum of three years current experience in the field of fauna assessment and
management.
Biosecurity Act 2014 – Fire Ant Control
3. Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
individuals and businesses are responsible for ensuring that they follow the movement
controls for specific organic materials to help prevent the spread of fire ants within South
East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
ant biosecurity zone may need a biosecurity instrument permit. More information is available
on https://www.fireants.org.au/treat/business-andindustry/movement-controls.
Performance Bond Agreement
Page 10 of 11
Document Set ID: 25190157
Version: 4, Version Date: 24/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.