Council archive · source document
Compiled Approved Plans - MCU19-0029.01, OPW19-0064.01 & RAL19-0006.01 · MCU19/0029.01
Plans and drawings: the text below has words only, no drawings.
0°00' 50.292
non-combustible fire separation
colourbond custom orb roofing in eaves
on R2.5 foil-backed insulation
blanket party wall below
to extend to underside
of roof sheets, battens
only to cross wall
20° ROOF PITCH
GARNET STREET
colourbond quad gutter
90°00'
& fascia
roof step
roof step
90°00'
20° ROOF PITCH
party wall below
to extend to underside
of roof sheets, battens
only to cross wall
20.117
VICTORY LANE
non-combustible fire separation
in eaves
20.117
BUILDING A
BUILDING B
0°00' 50.292
no. date amendments
A april 2019 re-design units 4 & 5
-
roof plan
APPROVED PLAN
MCU19/0029.01, OPW19/0064.01
& RAL19/0006.01
NOOSA COUNCIL Client Location Drawing Drawn Scale
FIRST
2 NOVEMBER 2020 T. DRENTH FLOOR PLAN AM 1:100 @ A2
- 8 GARNET STREET
Project COOROY Drawing no. Date
62 hilton terrace
noosaville (07) 5449 9066
[email protected]
QBSA reg. 65073 PROPOSED 5 UNIT
DEVELOPMENT 07.0119.4A JAN 2019 4A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans - MCU19-0029.01, OPW19-0064.01 & RAL19-0006.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.