Original source · versioned page text
Reference Document - Bushfire Risk Assessment & Bushfire Risk Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Ecological Natural Area Management
8 Bushfire risk management solutions and recommendations
8.1 Bushfire hazard mitigation recommendations: Considerations
As shown above, the house:
• Is mapped as High Potential bushfire Intensity on the Noosa Plan Bushfire Overlay,
• Is mapped as Very High Potential bushfire Intensity on Queensland Potential Bushfire
Intensity mapping,
• Is assessed as Potential bushfire Impact Buffer Class when assessed using a site-specific
assessment,
• Is confirmed to be in a Bushfire Prone Area and
• Is assessed as BAL 19 for all building elevations.
Accordingly, this section will recommend bushfire mitigation requirements for the above assessments.
Legislative requirements are detailed in:
• The Noosa Plan: Bushfire Overlay Code
• Australian Standard AS 3959 Construction of Buildings in Bushfire Prone Areas and
• Queensland State Planning Policy 2017
8.2 Recommendations for the Noosa Plan Bushfire Overlay Code
It is recommended that:
• The level of bushfire hazard shown on a Bushfire Hazard Overlay Map is confirmed through
the preparation of a site-specific bushfire hazard assessment prepared in accordance with
the Planning scheme policy for the bushfire hazard overlay code and
• The house is sited in a low hazard area in the lot and achieves a setback of 10 metres from
any retained vegetation.
As the house location is in a Potential bushfire Impact Buffer Class area and a reliable reticulated
water supply is not available,
It is recommended that:
• The premises to have a minimum water supply capacity of 5,000 litres dedicated for fire
fighting purposes which is sourced from a separate tank, a reserve section in the bottom
part of the main water supply tank, a swimming pool installed immediately upon
construction or a permanent dam.
8.3 Recommendations for Australian Standard AS3959
Australian Standard AS3959 specifies Deemed to Satisfy bushfire resistant methodologies based
on the assessed Bushfire Attack Level.
Accordingly, it is recommended that :
• The building solution for all building elevations of the house address the Deemed to Satisfy
requirements of Sections 3 and 6 of Australian Standard AS3959 -2018: Construction of
buildings in bushfire-prone areas.
Bushfire Risk Assessment and Management Plan for a house at 64 Pheasant Lane, Doonan September 2020
24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.