Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Reference Document - Bushfire Risk Assessment & Bushfire Risk Management Plan

of 41

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                         Ecological Natural Area Management


8.6       Recommendations for on-going management of buildings & landscaping
On-going maintenance procedures will ensure that the buildings will maintain the highest levels of
bushfire protection afforded by the siting, landscaping and construction recommendations in this
report. Maintenance strategies include:
Cleaning the roof and gutters of all flammable material on a regular basis, especially in the lead up
to the fire season
      •    Keeping the lawn buffer zone mown and watered
      •    Keeping the lawn buffer zone clear of all flammable material
      •    Clearing away any flammable material lodged against the structure
      •    Repairing and close any exposed lodgement points for burning debris
      •    Ensuring all painted surfaces are in good condition
      •    Maintaining drive ways
      •    Maintaining screens in good condition
      •    Maintaining roof in good condition
      •    Maintaining doors in good condition
      •    Keeping flammable material away from the buildings


8.7       Recommendations for Part E: Natural hazards of Qld State Planning Policy 2017
It is recommended that, notwithstanding that the proposed building location is in an area of
Potential Bushfire Hazard:
      •    The building siting, construction, firefighting resources etc outlined in Section 7.2
           appropriately mitigates the potential bushfire Hazard as required by the SPP
      •    The development does not unduly burden emergency services as there is good access for
           firefighting appliances, good fire fighting space, good water supply and contributes only one
           extra building in the emergency services area
      •    The building and the cleared and hard-standing areas decreases the severity of a bushfire
           on the lot and therefore does not increase severity of the bushfire Hazard and,
      •    There will be no hazardous material stored on the lot.




Bushfire Risk Assessment and Management Plan for a house at 64 Pheasant Lane, Doonan          September 2020

                                                            26
Log in to download the original file

Reference Document - Bushfire Risk Assessment & Bushfire Risk Management Plan.pdf · 6.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.