RFI - Aboricultural Impact Assessment
10 T REE P ROTECTION S PECIFICATION S
The trees shown to be retained are to be protected from damage with temporary fencing as
specified in AS 4970:2025 Protection of Trees on Development Sites and this Arborist report.
Temporary fencing must be erected at the boundary of the TPZ/Exclusion Zone marked areas
and must be installed per AS4970 before works commence.
All works within a designated TPZ of retained vegetation must be supervised by the Project
Arborist (AQF Level 5).
Take all necessary precautions, including but not limited to the following:
• Appropriate signage, i.e., ‘Tree Protection Zone’ and ‘No Go Zone’ must be erected at the
boundary of TPZ to prevent vehicles from entering and prevent stockpiling from occurring
near retained trees/vegetation.
• No damage to be caused to tree trunks and bark (i.e., do not attach guides or stays to
trees/vegetation).
• No excavation works/open trenching to encroach within the TPZ of retained trees unless
under the direct supervision of the Project Arborist.
• Where necessary to cut roots, this shall be undertaken by the Project Arborist.
• No storage or otherwise placing of spoil, bulk or potentially harmful materials (i.e.,
construction refuse, concrete waste, herbicides, diesel, etc.) under or within 1m of TPZs.
Prevent windblown materials such as cement from harming trees and plants.
• Avoid ground compaction under trees. If compaction occurs (i.e., from site access or the
location of a construction plant or vehicle parking), notify the Project Arborist and obtain
their instructions.
• Ground Protection: Where construction encroaches into the TPZ of trees to be retained,
it shall be necessary to install protection to avoid compaction of the ground surface, lateral
and absorbing roots.
• Any damage to trees during work is to be rectified according to AS 4373/96 Pruning of
Amenity Trees and best horticultural practices. The Project Arborist must oversee work.
• Where deemed beneficial, mulch the entire ground surface within TPZ with Forest Blend
Organic Mulch or site mulch to a depth of 100mm and install a temporary irrigation system
or manually water to ensure that soil moisture levels are adequately maintained.
25_10_21_AIA_TPA_23BottlebrushAve Page 14 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Aboricultural Impact Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.