Council archive · source document
23336 DA - Decision Notice · 132003.220836
Form 6 - Decision Notice INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION File No: 23336 DA Date of Decision: 12 January 2004 Applicant Details Name: STEPHEN KIDD DESIGN PTY LTD Postal address: PO BOX 262 NOOSA HEADS QLD 4567 Phone no: Fax no: 5447.5833 Mobile: 0419 758478 PROPERTY DESCRIPTION Street address: 41 SOBRAON STREET Suburb/locality SUNRISE BEACH Real property description: 16RP126837 PARISH WEYBA COUNTY MARCH Owner Details Name: DURMONT PTY LTD TTE Postal address: PO BOX 2439 FORTITUDE VALLEY QLD Postcode: 4006 Referral Agencies Referral Agency Address Basis Environmental Protection Agency (Unexploded Ordnance) GPO Box 2771, Brisbane Qld 4001 Concurrence Application Type Development Development Details Preliminary Approval Development Permit Material Change of Use Duplex Dwelling NO YES Decision details Council decided to approve the application and grant a Development Permit, subject to conditions. applicable codes The developer must comply with the following codes for self-assessable development related to the development approved under this Development Permit:- Not applicable. SUBMISSIONS Nil Conditions The approval is subject to conditions. Noosa Council’s conditions are attached. Conditions from the Environmental Protection Agency, as a concurrence agency are also attached. Further Development Permits Required Type of Development Permit required Subject of the required Development Permit Development Permit for Building Works Duplex Dwelling Development Permit for Operational Works Carparking and access, site civil works, stormwater drainage, frontage works, sewer reticulation and water reticulation, sediment and erosion controls and landscaping Rights of Appeal Rights of appeal in relation to this application are attached. Assessment Manager Name: Noosa Council Signature: Date: 14/01/04 Noosa Council Conditions INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION Land Use Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered 0312 SK02A - SKO6A & 0312.01C prepared by Stephen Kidd Design and dated May 2003 and as may be amended by these conditions. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The open space and setback areas are to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter. Security in the form of a cash bond or trading bank guarantee to the sum of $7,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for operational works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. This Development Permit for a material change of use of premises lapses if:- the use or erection of a building or other structure associated with the use, has not been commenced by 12 January 2008, unless application is made and approved by Council for an extension; or the use of any premises pursuant to the Development Permit ceases. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for building works. Land Development Vehicle Access A vehicular access driveway to serve the site shall be constructed from the Sobraon Street frontage of the site and shall have a width of 5.5 metres for the first 6 metres from the frontage road (from the kerb alignment) to allow vehicles to pass one another on the driveway. The driveway shall be designed and constructed to Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to grades that do not comply with AS2890.1-1993, Council will require that the driveway be removed and reconstructed to levels that do comply. All vehicles shall enter and leave the site in a forward direction. Carparking Carparking shall be provided within the site as shown on drawing number 0312.SK01A dated May 2003 by Stephen Kidd Design, except as modified herein. A minimum of 4 covered carpark spaces shall be provided on site. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for user class 1 with a minimum head clearance (headroom) at any point of 2.2m. Vegetation Protection Any internal pavements within the drip zone of any of the existing trees on site shall be designed as a pervious pavement and constructed so as not to damage the tree or their root system in anyway whatsoever. In this regard, plans shall be submitted to the Council for approval that clearly show the type and extent of the pervious pavement prior to obtaining a Development Permit for Operational Works. Roadworks Contributions A roadworks contribution of $1,013 towards the Coastal Major Road Network shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Price Index, All Groups Brisbane from June 2003 until the date of payment. Frontage Works Footpath improvements such as topsoiling, grassing, and tree planting are required to the Sobraon Street frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be couch, free of weeds. A new 1.2 metre wide concrete path shall be constructed along the Sobraon Street frontage of the site in accordance with Council’s design standards and to a meandering alignment. Care shall be taken to protect any significant vegetation or any underground services. The paths shall be designed and constructed to ensure pedestrian safety using non-slip materials and to produce an evenly graded surface finish. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications prior to commencement of the use permitted by this permit. Pathway Contributions A pathway contribution of $235.75 towards external major pathways, in accordance with Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Price Index, All Groups Brisbane from September 2003 until the date of payment. Stormwater Drainage All stormwater drainage shall be collected on site and discharged to Council’s existing drainage structures in Sobraon Street. In this regard, plans shall be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works. The maximum discharge of stormwater drainage allowable to Council’s street drainage system at any one location is 25 litres/second. All site stormwater drainage shall be by means of a gravity system. Sewer Mains The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements at no cost to Council. Town Water Supply The site shall be connected to Council’s existing town water supply and be constructed in accordance with Council’s standards and requirements at no cost to Council. Each water connection to the water reticulation system shall extend to the property boundary and be metered. Where multiple units are served by a single service, multiple water meters to each individual unit shall be installed. All fees for the supply of water meters shall be paid to the Council. Headworks Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates as of June 2003 under the current policies is as follows: Water Supply $3,675 Sewerage $2,387 TOTAL $6,062 All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. Earthworks Earthworks carried out on site shall not affect the structural integrity of any of the existing fences that border the development site unless it is intended to replace such fences. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval. Erosion and Sediment Control Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. General Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. Conditions Prior to the commencement of any excavation, earthworks or other soil disturbance associated with the proposed development of the subject lot/s (the site), that part of the site to be so worked is to be subjected to investigation and any necessary remediation of UXO contamination. Any person employed to work on any part of the site that has not been cleared through the satisfying of the above condition, is to be forewarned in writing by the occupier of the property. This warning is to explain that information available to the EPA indicates a risk of residual UXO contamination exists on the site and work, particularly that involving excavation, earthworks or other soil disturbance, should proceed with due caution. It is to state the procedure to be followed by any person finding an object suspected of being explosive ordnance or component thereof: Do not disturb the object Tack action, where appropriate to prevent it being disturbed by another person Note its approximate dimensions and general appearance. Safely and clearly mark its location. Note the route to its location. Advise the Police as soon as possible. No gravel, rock, sand or soil may be removed from the site without the written approval of the EPA. Where the owners is not the occupier relative to the above conditions, the owner is to advise the occupier of the above responsibilities. Advice Where condition 1 above has been satisfied by the whole site being subjected to investigative and any necessary remedial work, the applicant may submit a report, prepared in accordance with current guidelines, to the EPA for assessment. Such report may include a plan or plans to remediate part or parts of the land by taking action other than remedial searching, ie where remedial searching may be unwarranted or impracticable. Based on the report’s findings and recommendation/s, the EPA may subsequently reassess the site’s development suitability and advise the applicant and the Council accordingly. Development plans may provide for this procedure to be implemented by stages. Concurrence Agency Conditions & Advice - Environmental Protection Agency INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION Local Laws, Policies & State Regulation Requirements INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION Advice A Registered Professional Engineer of Queensland shall certify engineering drawings and specifications for all engineering works, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that makes or causes audible noise to be made from the building work:- On a Sunday or public holiday, at any time; or On a Saturday or a business day, before 7.00am or after 6.30pm. A maximum penalty of $1,500 applies to an offence under this legislation. The plans submitted for a Development Permit for building works are to comply with the approved plans and the following requirements:- the accessible portions of the roof decks above the garages shall not extend closer to the side boundaries of the property than 1.5 metres. Appeal Rights INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION The following is an extract from the Integrated Planning Act (Chapter 4). Division 8 - Appeals to court relating to development applications Appeals by applicants 4.1.27.(1) An applicant for a development application may appeal to the court against any of the following- the refusal, or the refusal in part, of a development application; a matter stated in a development approval, including any condition applying to the development, and the identification of a code under section 3.1.6; the decision to give a preliminary approval when a development permit was applied for; the length of a currency period; a deemed refusal. (2) An appeal under subsection (1)(a) to (d) must be started within 20 business days (the “applicant’s appeal period”) after the day the decision notice or negotiated decision notice is given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. Appeals by submitters 4.1.28.(1) A submitter for a development application may appeal to the court about- the giving of a development approval, including any conditions (or lack of conditions) or other provisions of the approval; or the length of a currency period for the approval. (2) The appeal must be started within 20 business days (the “submitters appeal period”) after the day the decision notice or negotiated decision notice is given to the submitter. (3) If a person withdraws a submission before the application is decided, the person may not appeal the decision. (4) If an application involves both impact assessment and code assessment, appeal rights for submitters are available only for the part of the application involving impact assessment. (5) If an application is processed under section 6.1.28(2), appeal rights for submitters for the application are available only for the aspects of the development that would have required public notification under the repealed Act. (6) If an application involves assessment against a concurrence agency code, appeal rights for submitters for the application are not available against the part of the approval that represents the concurrence agency’s response for the code. Appeals by advice agency submitters 4.1.29.(1) An advice agency may, within the limits of its jurisdiction, appeal to the court about the giving of a development approval for a development application if- the development application involves impact assessment; and the advice agency told the applicant and the assessment manager to treat its response to the application as a submission for an appeal. (2) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. Appeals for matters arising after approval given (co-respondents) 4.1.30.(1) For a development approval given for a development application, a person to whom any of the following notices have been given may appeal to the court against the decision in the notice- a notice giving a decision on a request for extension of the currency period for an approval; a notice giving a decision on a request to make a minor change to an approval. The appeal must be started within 20 business days after the day the notice of the decision is given to the person. Subsection (1)(a) does not apply if the approval resulted from a development application (superseded planning scheme) that was assessed as if it were an application under a superseded planning scheme. Also, a person who has made a request mentioned in subsection (1) may appeal to the court against a deemed refusal of the request. An appeal under subsection (4) may be started at any time after the last day the decision on the matter should have been made. Division 9 - Appeals to court about other matters Appeals for matters arising after approval given (no co-respondents) 4.1.31.(1) A person to whom any of the following notices have been given may appeal to the court against the decision in the notice- a notice giving a decision on a request to change or cancel a condition of a development approval. a notice under section 6.1.44 giving a decision to change or cancel a condition of a development approval. The appeal must be started within 20 business days after the day the notice of the decision is given to the person. Also, a person who has made a request mentioned in subsection (1)(a) may appeal to the court against a deemed refusal of the request. An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. Appeals against decisions to change approval conditions under the repealed Act 4.1.33A.(1) A person who is dissatisfied with a decision made on an application to change the conditions attached to an approval given under section 2.19(3)or section 4.4 of the repealed Act may appeal to the court against- the decision; or a deemed refusal of the application. (2) An appeal under subsection (1)(a) must be started within 20 business days after the day notice of the decision is to be given to the person. (3) An appeal under subsection (1)(b) may be started at any time after the last day a decision on the matter should have been made. Appeals against local laws 4.1.33B.(1) An applicant who is dissatisfied with a decision of a local government or the conditions applied under a local law about the use of premises or the erection of a building or other structure permitted by the planning scheme may appeal to the court against the decision or the conditions applied. (2) The appeal must be started within 20 business days after the day notice of the decision is given to the applicant. Section 3.1.6 (Preliminary approval may override local planning instrument) Section 6.1.44 (Conditions may be changed or cancelled by assessment manager or concurrence agency in certain circumstances) 9 9 NOOSA COUNCIL IDAS Development Application Decision Notice H o:\database\onestop\decision.doc H o:\database\onestop\decision.doc 15/01/04 Page: 1 Insert name and address of agency. Page: 1 If refused, delete the section headed Referral Agencies Referral Agency Address Basis Application Type and Decision details Council decided to < applicable codes The developer must comply with the following codes for self-assessable development related to the development approved under this Development Permit:- < SUBMISSIONS Not applicable. Conditions and insert reasons for refusal. Page: 1 Insert Designer’s Name, Plan No. and Date of Plan. Page: 1 Insert Yes or No in each column adjacent to each category. Page: 2 Type name of officer signing
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23336 DA - Decision NoticeRelated documentApplication case desk ↗
About this file
- File size
- 94 KB (small file)
- File type
- DOC
No other editions are linked here.