Original source · versioned page text
Appendix D. Traffic Report
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Proposal plans, Traffic report, Landscape Plans & Civil Eng Report - MCU17/0572 & OPW17/0611.
INTERNAL FLOOR FINISHES SCHEDULE. (REFER TO SCHEDULE FOR FULL DETAIL)
FL-01
CODE BOH / OFFICE / POS COUNTER
LOCATION RESILIENT
COMPACTFINISH FLOORING SAFETRED
SPECIFICATION
FL-02
FL-03 RETAIL FLOOR 2/
1 DINING VINYL TILES (LVT) TIMBER EFFECT
EX-P
FL-04 COLDROOM
PWD
SKIRTING FLOORS
& & FREEZER
COVING EPOXY
VINYL
FINISHES TILES
FLOOR(LVT)
SCHEDULE.FINISH (REFER TO SCHEDULE FOR FULL DETAIL)
SK-01
CODE BOH/POS COUNTER - SELF FLOORING
LOCATION TAKEN UP
FINISH WALL USING COVERING FILLET AND
SPECIFICATION
SK-02 COVED /SKIRTING
RETAIL OFFICE CAPPING STRIP
DIABOND JET BLACK
COLDROOM & FREEZER
SK-EXP ROOM EPOXY OR ALUMINIUM PROFILE
BOUNDARY
RL. 18.900
RL. 20.720
100m 2
DP
BOH AREA
STAFF
DP
BOUNDARY
7
SERVICE
8
STATION
RL 20.200
223m 2 (GFA)
COMP.
B
INTERNAL
123m 2
FALL
14m²
SALES AREA
LAYOUT AS PER
SERVICE YARD
TENANTS DETAIL.
EXIT
9
DP
LPG CAGE
ICE
FIRE-
WOOD
FALL 1:80
B2 B2 B2 B2
1
6
5
3
4
2
LOADING BAY
MRCagney
10
ENTRY
UNDERGROUND TANKS
B1
B1
RL. 20.630
RL. 19.110
FILL POINT
FILL POINT EXCLUSION ZONE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.