Original source · versioned page text
18556-C121_[F]
Attached to the e-mail IDAS Form 5 - Minor Change Application - 64 Gateway Dr Noosaville.
Original PDF page 1, section 2. The text section number identifies this passage in the reader.
5.8
Depth of flow = 183mm : Water Level = RL.4.778 : Freeboard = 422mm Worse case scenario - Internal Inlets 100% blocked
6.4
6.6
6.8
7.0
Worse case scenario - Internal Inlets 100% blocked
7.4
7.2
6.0
2.2 1.6
7.4
FI1/8 Velocity = 1.59m/s d.V = 0.29 Overland flow = 40 l/s
9.8
Overland flow = 723 l/s (232 + 491)
6.2
Depth of flow = 65mm : Water Level = RL.4.005
8.2
0.029ha
7.6
Depth of flow = 197mm : Water Level = RL.3.832 : Freeboard = 168mm 1.8 Worse case scenario - Internal Inlets 100% blocked
2.4
8.0
Overland flow = 540 l/s
JOINS ABOVE
7.8
Depth of flow = 183mm : Water Level = RL.4.778
10.0
6.6
2.0
MAJOR OVERLAND FLOW PATH CALCULATIONS
B 3.8
Capacity at 150mm deep = 317 l/s ~ 223 l/s crosses top of kerb to Point D
G2/12
6.0
4.5 3.3
0.020ha CATCHMENT PLAN LEGEND
6.2
FFL.4.00 FFL.4.00 4.0
6.25% 6.25% MAJOR OVERLAND FLOW PATH CALCULATIONS
6.8
2.6 2.4 D
Road longitudinal grade = 0.5% RL.3.615 G1/12 11.0 PROPERTY BOUNDARY
7.0
8.4
8.6
FFL.4.40
8.8
0.015ha
9.0
9.2
3.65%
9.4
9.6
9.8
Internal Carpark Catchment EXISTING STORMWATER PIPE
2.6
SW
7.2
Q100 Flow = (0.445 x 0.99 x 321 ) / 360 = 393 l/s
Kerb longitudinal grade = 0.84% RL.3.974 13 FINISHED CONTOUR
Q10 Pipe Flow = (0.445 x 0.88 x 223 ) / 360 = 243 l/s
Overland flow = 393 l/s - 243 l/s = 150 l/s Internal Carpark Catchment
WEIR depth of flow = 148mm : Water Level = RL.3.763 : Freeboard = 237mm RW to FI1/8 Q100 Flow = (0.177 x 0.99 x 321 ) / 360 = 156 l/s PROPOSED STORMWATER
External Catchment from Gateway Drive 0.097ha Bypass from Point C = 223 l/s PROPOSED CATCHMENT BOUNDARY
Q100 - Q10 Overland flow = 491 l/s : Refer Drg No C122 2.8
Overland flow = 156 + 223 - 134 (Pipe flow) = 245 l/s A MAJOR FLOW CALCULATION LOCATION
Overland flow = 393 + 491 - 243 = 641 l/s 4.2 4.0 3.8 Depth of flow = 126mm : Water Level = RL.4.100 : Freeboard = 300mm
3.0
3.6
3.4
3.2
WEIR depth of flow = 261mm : Water Level = RL.3.876 : Freeboard = 124mm Velocity = 1.10m/s d.V = 0.14
0 5 10 15m
Worse case scenario - Internal Inlets 100% blocked Worse case scenario - Internal Inlets 100% blocked
Overland flow = 884 l/s (393 + 491) Overland flow = 379 l/s
WEIR depth of flow = 296mm : Water Level = RL.3.911 : Freeboard = 89mm Depth of flow = 149mm : Water Level = RL.4.123 Scale 1:250 @A1
Scale 1:500 @A3
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
This drawing is subject to M.K.P. D.R.
copyright in accordance with the
F 25.01.24 LINE 18 SEPARATED INTO LINES 18 & 19 SDP
PIVOTAL PERSPECTIVE 64 GATEWAY DRIVE Designed Verified
64 GATEWAY DRIVE, NOOSAVILLE STORMWATER DRAINAGE AS SHOWN A1
agreement between Tod
Consulting pty ltd (tc) and tc's E 02.06.21 OVERLAND FLOW CALCULATIONS UPDATED JF
PLANNING CONSULTANT PTY LTD M.K.P. D.R. CATCHMENT PLAN Drawing Number
client. This drawing shall only be
D 02.03.20 CATCHMENTS UPDATED JF 4/59 MARY STREET
used for this specific project.
C 03.12.19 STORMWATER AMENDED M.K.P. NOOSAVILLE, QLD 4566
Approved
D REYNOLDS
RPEQ No
9072
RP DESCRIPTION: LOT 13 ON SP170295 18556 - C121
Noosa: 07 5449 9600 LOCAL AUTHORITY: NOOSA COUNCIL
This drawing shall not be used B 04.11.19 CALCULATIONS UPDATED M.K.P. Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
Signed Date MCU APPROVAL: 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as PO Box 61, Noosaville, QLD 4566 HORIZ DATUM: LOCAL
A 10.09.19 ISSUED FOR APPROVAL M.K.P.
'issued for construction' in the
revision description. Rev Date Revision Description Drawn
[email protected] www.todconsulting.com
ABN 39 128 805 336 25.01.24
ROL APPROVAL:
OPW APPROVAL:
VERT DATUM: AHD
RL DATUM: PSM 13296 MEASUREMENT BAR - INCREMENTS IN mm
21 of 24 F
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original