Item 11:          Investigate providing additional on-street parking spaces including a space along the
redundant crossover near the northwest of the site. Provide detailed plan for linemarking for frontage to
demonstrate allocation of the maximum number possible of compliant parking spaces, the plan should
also illustrate any amendment to the linemarking for the bus stop as discussed in the above previous
item.

Applicant’s Response to Item 11: Please refer to Attachment C which includes amended plans that
detail an additional parking space on Gympie Terrace. A detailed plan for line marking will be provided
as part of the future Operational works application for the site.


Item 12:          The information and amendment addressing the following are required:
   a. Structural retaining for the proposed passing bay encroaches on the existing sewer easement and
   may be in conflict with Unitywater requirements, Unitywater endorsement of the encroachment and
   retaining wall design is required.
   b. Update plan to reflect changes to the crossover discussed previously.
   c. Vehicle turning path encroaches on the pathway, provide amended plan to address this matter
   and consistent with the new design of the crossover.


Applicant’s Response to Item 12: The applicants Engineers SCG Consulting have advised that a
detailed retaining wall design and Build over the Sewer Application will be undertaken as part of the
Operational Works Design and application phase for the project. Attachment D provides SCG vehicle
turning paths and driveway levels.


Item 13:        Amend plan to avoid conflict between the proposed stormwater cells and the existing
sewer main or seek endorsement of Unitywater in this regard.

Applicant’s Response to Item 13: Please refer to Attachment D which provides an amended
Stormwater Management Plan to relocate the infiltration cells clear of the Unity Water Sewer Main.


Item 14:         Provide further details of effluent disposal from the basement and confirm that they are
in compliance with the applicable regulations and endorsed in written by Unitywater.

Applicant’s Response to Item 14: SCG Consulting Engineers advise that an effluent disposal system
will not be used as the site is connected to Unity Water Sewer infrastructure. A hydraulic consultant will
be engaged as part of the next design phase of the project. This will include detailed design of a
proprietary pumped out system which will be compliant with Unity Water regulations.


Item 15:          Provide plans which illustrate one location for the visitor parking and that the turn table
is not required to access the visitor car parking.

Applicant’s Response to Item 10: Please refer to Attachment D which provides amended plans in
relation to the location of visitor spaces.


Following issue of the information request, Council staff raised that side boundary setbacks may be an
issue due to concerns from surrounding residents. It is understood that this aspect was not raised in the
information request as the pre-lodgement meeting notes indicated that Council staff were supportive of
the reduced setbacks. Following a meeting with Council staff on 14 th May 2019, the applicant has
reviewed the proposal plans and considered the view lines from the existing units to the rear of the site.
These units on Elizabeth Street are approved with living areas on the ground floor and upper level as
detailed below. The units also feature a ‘frame’ around the northern balconies which focus views from
within the building.
Log in to download the original file

Response to NC information request.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.