Council archive · source document
19-0441_H-101 - 02 - Cover Sheet · OPW19/0205
400mm | 10 Omm 100mm 50 4 Omm HYDRAULIC SERVICES INFINITY RESIDENTIAL DEVELOPMENT - THREE APARTMENTS 217-219 GYMPIE TERRACE, NOOSAVILLE QUEENSLAND, 4566 Lot 1 on RP66483 & Lot 1 on RP70165 Sunshine Coast Regional Council PROJECT NOTES General Notes 1. ALL INSPECTION OPENINGS TO BE BROUGHT TO THE SURFACE & CAPPED WITH A BOLTED TRAP SCREW IN A CONCRETE SURROUND TO LOCAL GOVERNMENT APPROVAL. THE CONTRACTOR IS OBLIGATED TO INSPECT THE SITE & BE SATISFIED AS TO THE CONDITIONS UNDER WHICH THE WORK WILL BE CARRIED OUT PRIOR TO THE SUBMISSION OF A TENDER OFFER. DO NOT SCALE DRAWINGS, REFER TO ARCHITECTURAL DRAWINGS FOR ALL SET-OUT DIMENSIONS. THE CONTRACTOR SHALL ALLOW TO SUPPLY & INSTALL ALL SANITARY FIXTURES, TAPWARE & ASSOCIATED ACCESSORIES. REFER TO ARCHITECTURAL SPECIFICATION FOR SCHEDULE. LAYOUTS OF SERVICE LINES, PLANT AND EQUIPMENT SHOWN ON THE DRAWINGS ARE DIAGRAMMATIC ONLY EXCEPT WHERE FIGURED DIMENSIONS ARE PROVIDED OR CALCULABLE. NO WARRANTY IS GIVEN TO THE COMPLETENESS OR ACCURACY OF EXISTING SERVICES INFORMATION WHETHER DOCUMENTED OR OTHERWISE. WHERE CONNECTION IS REQUIRED TO EXISTING SERVICES THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE PRECISE LOCATION AND DEPTH OF THE EXISTING SERVICE CONNECTION POINT PRIOR TO THE INSTALLATION OF ANY ASSOCIATED WORKS. THE CONTRACTOR SHALL CO-ORDINATE ALL PIPEWORK WITH THE OTHER TRADE SERVICES PRIOR TO COMMENCEMENT OF ANY WORK. ALL PIPES SHALL BE ADEQUATELY SUPPORTED & SECURED TO ADJACENT WALLS OR SLABS. SUPPORTS SHALL BE GALVANIZED MILD STEEL 'UNISTRUT CHANNEL COMPLETE WITH PURPOSE MADE GALVANIZED SPRING NUTS, FRAMING, FITTING & PIPE CLAMPS FOR EACH PIPE. ALL COPPER PIPES SHALL BE SEPARATED FROM SUPPORTS BY 2mm MINIMUM THICK PVC STRIP OR SIMILAR APPROVED MATERIAL. THE CONTRACTOR SHALL SUPPLY & INSTALL ALL SANITARY FIXTURES SHOWN ON THE DRAWINGS OR NECESSARY FOR THE COMPLETION OF THE PROJECT. ALLOW FOR THE SUPPLY & FIXING OF ALL FIXTURES, BOLTS, BRACKETS, PUTTY, MASTIC, SILICON FILLERS, CEMENT & SUNDRY MATERIALS NECESSARY FOR EACH INSTALLATION INCLUDING ALL CONNECTIONS TO DRAINS, WATER SERVICES ETC. GENERALLY IN ACCORDANCE WITH THE MANUFACTURER'S DIRECTIONS: ALLOW FOR ALL BENDS, SETS & INSTALLING SUFFICIENT UNIONS, FLANGES & ISOLATING VALVES FOR SATISFACTORY REMOVAL OF PIPING & FITTINGS FOR MAINTENANCE OR REPAIRS TO PRODUCE AN INSTALLATION TO THE APPROVAL. OF THE SUPERINTENDENT WHETHER SUCH ITEMS ARE SHOWN ON DRAWINGS OR SPECIFIED. ALLOW FOR THE COMPLETE SUPPLY & INSTALLATION OF TAPS & SUNDRY MATERIALS NECESSARY FOR THE INSTALLATION & CONNECTION IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS THE HYDRAULIC SERVICES CONTRACTOR SHALL BE RESPONSIBLE FOR CO-ORDINATING WITH MECHANICAL A/C SERVICE ON-SITE CONTRACTOR TO SUPPLY ON COMPLETION ALL WARRANTIES, TECHNICAL DATA, TESTING CERTIFICATES, COMPLETION & COMPLIANCE CERTIFICATES PRIOR TO HANDOVER. SEAL PENETRATIONS WITH A SYSTEM CONFORMING TO AS4072.1 A SEPARATE HYDRAULIC SERVICES SPECIFICATION FORMS PART OF THIS DOCUMENT PACKAGE AND SHALL BE READ IN CONJUNCTION WITH THESE DRAWINGS. Authority Requirements 1 THESE DOCUMENTS MUST BE READ IN CONJUNCTION WITH THE STAMPED APPROVED PLANS AND PLUMBING DRAINAGE AND COMPLIANCE PERMIT CONDITION (INCLUDING AMENDMENTS). ALL PLUMBING AND DRAINAGE WORK OR ON-SITE SEWERAGE WORK MUST COMPLY WITH THE COUNCILS LOCAL LAWS AND POLICIES AND OTHER RELATED DEVELOPMENT PERMIT CONDITION. THE CONTRACTOR SHALL PAY ALL FEES IN CONNECTION WITH APPROVALS, UTILITY PROVIDER CONSTRUCTION COSTS, TESTS & INSPECTIONS, ETC. THE CONTRACTOR SHALL CARRY OUT ALL THE NECESSARY TESTING OF THE SERVICES SHOWN ON THE DRAWINGS AS REQUIRED BY THE RESPECTIVE AUTHORITIES OBTAIN CERTIFICATES FROM THE RELEVANT AUTHORITIES INDICATING SATISFACTORY COMPLETION OF SERVICES & HAND OVER TO THE SUPERINTENDENT BEFORE APPLICATION FOR CERTIFICATE OF PRACTICAL COMPLETION. IF ANY DOUBTS EXIST AS TO WHETHER A SECTION OF THE DESIGN IS ABLE TO COMPLY WITH THE RELEVANT AUTHORITY'S REGULATIONS, THE SUPERINTENDENT SHALL BE NOTIFIED PRIOR TO COMMENCEMENT OF ANY WORKS. NO CONSIDERATION OF CLAIM FOR REDUNDANT WORK SHALL BE GIVEN IF THE SUPERINTENDENT IS NOT NOTIFIED. CONTRACTOR TO ALLOW FOR COST OF SEWER & WATER CONNECTION TO SITE. CONTRACTOR TO ALLOW ALL COST FOR PREPARATION OF 'AS CONSTRUCTED DRAWINGS' DRAWN TO THE SAME STANDARD AS APPROVED PLAN & SUBMIT TO LOCAL AUTHORITY PRIOR TO COMMENCEMENT OF FINAL INSPECTION . MP4.1 - Sustainable Buildings (Class 1 & 2) 1 PA, PS. so P6. sn CONTRACTOR TO ENSURE BUILDING HYDRAULICS SERVICES ARE ENERGY EFFICIENT & WATER EFFICIENT IN ACCORDANCE WITH THE MANDATORY PROVISIONS OF MP4.1 - SUSTAINABLE BUILDINGS ALL SHOWER ROSES TO HAVE A MIN 3-STAR WATER EFFICIENCY LABELLING & STANDARDS (WELS) RATING. ALL TOILET CISTERNS HAVE A DUAL FLUSH FUNCTION & 4-STAR WELS RATING ARE COMPATIBLE WITH THE SIZE OF THE TOILET BOWL TO ALLOW PROPER FUNCTIONING OF THE TOILET TAP WARE HAS A MINIMUM 3-STAR WELS RATING FOR TAPS SERVING Laundry tubs; and KITCHEN SINKS; and BASINS NOTE: PART 6 NOTE APPLICABLE TO ALLITERATIONS & ADDITIONS TO EXISTING BUILDINGS Plumbing & Drainage 1. THE WHOLE OF THE PLUMBING & DRAINAGE WORKS SHALL BE IN ACCORDANCE WITH THE PLUMBING & DRAINAGE ACT 2002, NATIONAL CONSTRUCTION CODE (PLUMBING CODE OF AUSTRALIA), ASINZS 3500.2:2015, & THE SPECIFIC REQUIREMENTS OF THE LOCAL AUTHORITY, ALL PRIVATE SEWER DRAINAGE WORK UNDERTAKEN ON THE SITE BY THE CONTRACTOR IS TO COMPLY WITH THE REQUIREMENTS OF THE WORKPLACE HEALTH & SAFETY REGULATIONS ALL HOUSE DRAINAGE SHALL BE 100@ AT A GRADE OF 1:60 MINIMUM UNLESS NOTED OTHERWISE. ALL VENT PIPES SHALL TERMINATE ABOVE ROOF IN ACCORDANCE WITH ASINZS 3500.2:2003. THE CONTRACTOR IS TO VERIFY THE POSITIONS OF ALL DRAINAGE PIPES & SERVICE LINES & THAT THE INVERT & SURFACE LEVELS ARE CORRECT BEFORE COMMENCING WORKS. FLOOR WASTES SHALL CONSIST OF A SELF-CLEANSING 'P' TRAP & RISER WITH SCREWED CHROME PLATED BRASS GRATE SET AT A LEVEL TO ENSURE ADEQUATE DRAINAGE OF ALL FLOOR AREAS. PROVIDE AN ANTI-FOAMING DEVICE TO ANY FWG RECEIVING WASTE DISCHARGE FROM LAUNDRY TUBS AND/OR WASHING MACHINES THE CONTRACTOR SHALL ALLOW TO PROVIDE TEST GATES WHERE NECESSARY FOR THE SATISFACTORY TESTING OF THE SYSTEM. PROVIDE MOVEMENT CONTROL JOINTS IN ACCORDANCE WITH MANUFACTURES RECOMMENDATIONS TO ACCOMMODATE ANTICIPATED MOVEMENT. (REFER GEOTECHNICAL REPORT). BEDDING FOR PIPELINES TO BE WASHED 5mm SCREENING WITH A MINIMUM 150mm BELOW AND ABOVE PIPES. WHERE PIPES ARE LAID IN FILL, THE FILLING SHALL BE CARRIED OUT IN LAYERS NOT EXCEEDING 300mm (LOOSE) IN DEPTH AND SHALL BE COMPACTED UNTIL THE COMPACTION IS NOT LESS THAN 95% OF THE MATERIALS MAXIMUM COMPACTION WHEN TESTED IN ACCORDANCE WITH AS 1289 (MODIFIED COMPACTION). TESTING SHALL BE CARRIED OUT AFTER EACH ALTERNATE LAYER AND CERTIFICATES MADE AVAILABLE CERTIFYING THAT THE REQUIRED COMPACTION HAS BEEN ACHIEVED. Stormwater 1. THE WHOLE OF THE STORMWATER DRAINAGE WORKS SHALL BE IN ACCORDANCE WITH THE NATIONAL CONSTRUCTION CODE 2011 (PLUMBING CODE OF AUSTRALIA), AS/NZS 3500.3:2003, & THE LOCAL GOVERNMENT WORKS DEPARTMENT GUIDELINES & REGULATIONS, & THE QUEENSLAND DEVELOPMENT CODE. ALL DOWNPIPES AND STORMWATER DRAINAGE SHALL BE FREE OF LEAKS WHEN TESTED IN ACCORDANCE WITH AS/NZS 3500.3:2003 (SECTION 10) SUPPORT WATER STORAGE TANKS IN SUCH A MANNER THAT NO LOAD IS TRANSMITTED TO ANY OF THE ATTACHED PIPES FOR ROOF CATCHMENT IN CONNECTION WITH RAINWATER TANKS: 4.1. INSTALL RAINWATER SYSTEMS & EQUIPMENT IN ACCORDANCE WITH STANDARDS AUSTRALIA HB 230-2008 "RAINWATER TANK DESIGN & INSTALLATION HANDBOOK", 4.2. PROVIDE "GUTTER GUARD" OR SCREENED DOWNPIPE RAINHEADS HAVING 4 - 6mm SCREEN MESH TO PREVENT LEAVES FROM ENTERING THE DOWNPIPE. SCREEN MESH TO BE FIRE RESISTANT, COLOUR MATCHED AND COMPATIBLE WITH ROOF AND GUTTER MATERIAL AND PROFILE. 4.3. ALL DRAINAGE PIPEWORK AND FITTINGS ON THE INLET SIDE OF THE STORAGE TANK SHALL BE PVC CLASS DWV HAVING WATER TIGHT JOINTS FORMED WITH THE USE OF SOLVENT CEMENT AND PRIMING FLUID (UNO). TANKS TO INCLUDE: 5.1. MOSQUITO PROOF SCREENS NOT COARSER THAN 1mm APERTURE MESH "OR" FLAP VALVES AT EVERY OPENING OF THE TANK TO PREVENT MOSQUITOS BREEDING IN THE TANK. 5.2. WATER TIGHT CONNECTIONS. WET PIPE SYSTEMS IN CONNECTION WITH RAINWATER TANKS:: 6.1. PROVIDE RAIN WATER HEADS WITH MOSQUITO PROOF SCREENS NOT COARSER THAN 1mm APERTURE MESH AT EACH DOWNPIPE IN CONNECTION WITH THE RAINWATER TANKS "OR" 6.2, PROVIDE A FIRST FLUSH DEVICE CAPABLE OF AUTOMATICALLY DEWATERING THE ‘WET PIPE’ SYSTEM. PROVIDE MOVEMENT CONTROL JOINTS IN ACCORDANCE WITH MANUFACTURES RECOMMENDATIONS TO ACCOMMODATE ANTICIPATED MOVEMENT. (REFER GEOTECHNICAL REPORT). BEDDING FOR PIPELINES TO BE WASHED 5mm SCREENING WITH A MINIMUM 150mm BELOW AND ABOVE PIPES. WHERE PIPES ARE LAID IN FILL, THE FILLING SHALL BE CARRIED OUT IN LAYERS NOT EXCEEDING 300mm (LOOSE) IN DEPTH AND SHALL BE COMPACTED UNTIL THE COMPACTION IS NOT LESS THAN 95% OF THE MATERIALS MAXIMUM COMPACTION WHEN WHEN TESTED IN ACCORDANCE WITH AS 1289 (MODIFIED COMPACTION). TESTING SHALL BE CARRIED OUT AFTER EACH ALTERNATE LAYER AND CERTIFICATES MADE AVAILABLE CERTIFYING THAT THE REQUIRED COMPACTION HAS BEEN ACHIEVED. Materials 1 WATER SUPPLY PIPE SIZES SPECIFIED ON THESE DRAWINGS ARE BASED ON CALCULATIONS FOR PIPES HAVING EQUIVALENT DIMENSIONAL AND FLOW CHARACTERISTICS TO THAT OF TYPE B COPPER TUBE. WHERE ALTERNATIVE MATERIALS ARE USED AN EQUIVALENT PIPE SIZE APPROPRIATE TO THE MATERIAL BEING USED SHALL BE SELECTED. COLD WATER COPPER TYPE 'B’* HOT WATER COPPER TYPE 'B’* SANITARY DRAINAGE \ PLUMBING uPVC DWV STORMWATER PVC-U/ SWJ FIRE (IN-GROUND) uPVC PRESSURE PIPE CLASS 'M' OR '0' FIRE (ABOVE-GROUND) GALVANISED STEEL * PIPE AND FITTING MATERIALS MAY BE SUBSTITUTED PROVIDED ALTERNATIVE MATERIALS ARE AUTHORIZED FOR USE IN ACCORDANCE WITH THE PLUMBING CODE OF AUSTRALIA (PCA). FOR WATER SERVICES REFER ALSO: AS/NZS3500.1 SECTION 2 AND APPENDIX B - ACCEPTABLE PIPE AND FITTINGS. Water Services 1 1. THE WHOLE OF THE WATER SERVICE WORKS SHALL BE IN ACCORDANCE WITH THE NATIONAL CONSTRUCTION CODE (PLUMBING CODE OF AUSTRALIA), AS/NZS 3500.1:2015 & THE SPECIFIC REQUIREMENTS OF THE LOCAL AUTHORITY. ALLOW TO SUPPLY & RETICULATE 15@ COLD WATER SUPPLY TO A SINGLE FIXTURE & 208 OR GREATER TO TWO OR MORE FIXTURES (UNO). HOT WATER RETICULATION PIPEWORK SHALL BE 15@ LAGGED TUBING TO EACH FIXTURE OUTLET (UNO). NOTE THAT A 20 CONNECTION SHALL BE REQUIRED TO BOTH THE INLET & THE OUTLET OF THE HOT WATER UNIT (UNO) WATER SUPPLY PIPE SIZES SPECIFIED ON THESE DRAWINGS ARE BASED ON CALCULATIONS FOR PIPES HAVING EQUIVALENT DIMENSIONAL AND FLOW CHARACTERISTICS TO THAT OF TYPE B COPPER TUBE. WHERE ALTERNATIVE MATERIALS ARE USED AN EQUIVALENT PIPE SIZE APPROPRIATE TO THE MATERIAL BEING USED SHALL BE SELECTED. PROVIDE A PLV WHERE WATER PRESSURE EXCEEDS 500kPa AT ANY OUTLET. ENSURE ALL BACKFLOW PREVENTION DEVICES ARE INSTALLED TO MEET THE REQUIREMENTS OF THE LOCAL AUTHORITIES & AS/NZS 3500-1, SECTION 4. WHEREVER POSSIBLE PIPES SHALL BE RUN PARALLEL WITH THE ADJACENT STRUCTURE AND/OR SERVICES. ALL BRANCH LINES TO BE TAKEN OFF AT RIGHT ANGLES. SHORT PIPE EXTENSION PIECES FROM WALLS CONNECTING FIXTURES SHALL BE FITTED WITH A UNION CONNECTION TO ALLOW FOR REMOVAL OF FIXTURES. ON COMPLETION ALL PIPING SHALL BE SUBJECT TO A PRESSURE TEST OF 1500kPa FOR A PERIOD OF TWO HOURS. ANY DEFECTS FOUND IN THE SYSTEM SHALL BE REMEDIED & THE TEST REAPPLIED. WATER METERS SHALL BE PURCHASED FROM LOCAL AUTHORITY OR LOCAL AUTHORITY SUPPLIER. METER AND VALVE PATH BOXES INSTALLED IN HARDPAVED AREAS SHALL BE FITTED WITH CAST IRON ACCESS COVERS. Fire Services FIRE HYDRANT SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH AS2419. HYDRANT LANDING VALVES SHALL BE COMPATIBLE WITH QLD ROUND THREAD PATTERN ATTACH NOTICE OF TEST/WORKING PRESSURES & BLOCK PLAN OF INSTALLED FIRE SERVICES SYSTEM WITHIN BOOSTER CABINET IN ACCORDANCE WITH AS2419.1 SECTION 7 NON CERTIFIED MATERIAL USED FOR THE SOLE PURPOSE OF A FIRE SERVICE INSTALLATION SHALL BE INSTALLED DOWNSTREAM OF A TESTABLE BACKFLOW PREVENTION DEVICE AND/OR AS DIRECTED BY THE LOCAL AUTHORITY. EXTERNAL HYDRANT SHALL BE POSITIONED NOT LESS THAN 10m FROM ANY PART OF THE BUILDING UNLESS PROTECTED BY A STRUCTURE HAVING AN FRL OF 90/90/90 WHICH EXTENDS 2m EITHER SIDE OF THE HYDRANT AND 3m ABOVE FINISHED GROUND LEVEL (UNLESS INSTRUCTED OTHERWISE) HYDRANTS (INCLUDING FIRE BRIGADE BOOSTER ASSEMBLIES) SHALL BE POSITIONED NOT LESS THAN 10m AWAY FROM HIGH VOLTAGE ELECTRICAL EQUIPMENT, LPG CYLINDERS & OTHER COMBUSTIBLE STORAGE. HYDRANT SYSTEM SHALL BE IDENTIFIED AND SUPPORTED IN ACCORDANCE WITH AS2419.1 2005 CLAUSE 8.6 FIRE SYSTEM PUMPS AND ASSOCIATED EQUIPMENT SHALL BE PROVIDED IN ACCORDANCE WITH AS29414. FIRE HOSE REEL SYSTEMS SHALL BE PROVIDED IN ACCORDANCE WITH AS2441 & AS1221 FIRE HYDRANTS AND FIRE HOSE REELS MUST BE SEALED. THE SEAL MAY ONLY BE BROKEN FOR FIRE FIGHTING OR MAINTENANCE PURPOSES. FINAL FLOW AND PRESSURE TEST AND PERFORMANCE CERTIFICATION OF ANY FIRE SYSTEM ASSOCIATED WITH THIS DEVELOPMENT ARE THE RESPONSIBILITY OF THE CONTRACTOR. PIPE AND PIPE FITTINGS SHALL BE ADEQUATELY RESTRAINED WITH THRUST BLOCKS. THRUST BLOCKS SHALL BE STRICTLY INSTALLED IN ACCORDANCE WITH AS3500.1 CLAUSE 5.9. PLUMBING CONTRACTOR TO SEEK ADVICE FROM A QUALIFIED GEO-TECHNICAL ENGINEER FOR THE CONSTRUCTION OF THRUST BLOCKS BCA Part J HOT WATER SUPPLY SYSTEMS TO SATISFY THE REQUIREMENTS OF BCA PART J7.2 AND AS3500.4 SECTION 8, P Noosaville Boat‘Ramp PROPOSED SITE 217-219 ft, Se SYMBOLS ——— _ SERVICE No. LAN (CST) —— _ SERVICE NAME X00 7 BI SQoT+oK sows ovnma Rx ow 1 ——_ SERVICE SIZE DOWNPIPE SPREADER HOT & COLD WATER POINT WATER POINT RELIEF VALVE STOP VALVE ISOLATION VALVE ISOLATION VALVE IN PATH BOX MONITORING VALVE PRESSURE LIMITING VALVE WATER METER NON-RETURN VALVE or CHECK VALVE STRAINER UNION THERMOSTATIC MIXING VALVE TEMPERING VALVE PRESSURE GAUGE BEAM PENERATION FLAP VALVE HOSE COCK OVERFLOW RELIEF GULLY PUMP DUAL PILLAR HYDRANT SINGLE TESTABLE CHECK VALVE ASSEMBLY INCLUDING ISOLATION VALVES AND LINE STRAINER DOUBLE CHECK VALVE ASSEMBLY INCLUDING ISOLATION VALVES AND LINE STRAINER REDUCE PRESSURE ZONE DEVICE ASSEMBLY INCLUDING ISOLATION VALVE AND LINE STRAINER END CAP TUNDISH AIR ADMITTANCE VALVE DROPPER (INLINE) DROPPER RISER / WASTE POINT BUCKET TRAP SWIVEL / EXPANSION JOINT Pas) GYMPIE TERRACE LINETYPES - EXISTING w—— hw ——— m sd ——— sp ——— COLD WATER COMMUNICATIONS ELECTRICAL FIRE SERVICE GAS SERVICE HOT WATER RISING MAIN SANITARY DRAINAGE SANITARY PLUMBING SEWER STORMWATER LINETYPES - PROPOSED —_ CAST IN PIPEWORK —_—ove _—_—k —_—RO COLD WATER FIRE SERVICE FIRE HYDRANT COVERAGE FIRE HOSE REEL COVERAGE GAS SERVICE HOT WATER NON DRINKING COLD WATER RISING MAIN RAIN WATER DRAINAGE SANITARY DRAINAGE / PLUMBING STORMWATER TEPID WATER VENT LINETYPES - SERVICES BY OTHER'S —— CRM —— — cs —— — ¢c-sw —— — cw —— —_M—M— CIVIL - RISING MAIN CIVIL - SEWER MAIN CIVIL - STORMWATER MAIN CIVIL - WATER MAIN NEW UTILITY GAS BRANCH NEW UTILITY SEWER BRANCH NEW UTILITY WATER BRANCH MECHANICAL (CONDENSATE DRAIN) Se Sn Ee raTS a LOCALITY PLAN SCALE: NTS AT SHEET A1 ABBREVIATIONS AAV : Air Admittance Valve AP : Access Pit AIP : Access Panel B : Basin BID : Bidet BT : Bucket Trap BTH : Bath BWU : Boiling Water Unit CHVP : Chamber Vent Pipe CM : Coffee Machine CON : Connector CON-W : Condensate Waste cP : Chrome Plated CSK : Cleaners Sink CSwP + Civil Stormwater Pit cv : Check Valve CWM : Clothes Washing Machine cu : Copper DBA : Dry Basket Arrestor DCV : Double Check Valve DUAL-CV = Dual Check Valve DF : Drinking Fountain DG : Disconnector Gully DP : Down Pipe DPH : Double Pillar Hydrant DS/IL : Down Stream Invert Level ow : Dishwasher ED : Elevated Drainage EPD : Elevated Drainage Stack EJ : Expansion Joint e : Existing elC : Existing Inspection Chamber elO : Existing Inspection Outlet elOS : Existing Inspection Outlet to Surface elV : Existing Isolation Valve elVP + Existing Isolation Valve in Path Box eSWP : Existing Stormwater Pit eSWRG + Existing Stormwater Road Gully FFL : Finished Floor Level FFP : First Flush Pit FH : Fire Hydrant FHR : Fire Hose Reel FI : Field Inlet FSL : Finished Surface Level : Fixture Unit Rating : Floor Waste : Floor Waste Gully : Gully : Grated Drain : Ground Level : Gate Valve : Hose Cock : Hose Connection Vacuum Breaker : Heavy Duty : Hot Dipped Galvanised : Hot Water : Hot Water Unit : Hydrant Valve : Hydrant : Inspection Chamber : Invert Level : lee Machine : Inspection Outlet : Inspection Outlet To Surface : Inflow Pit : Irrigation Isolation Valve : Isolation Valve : Independent Waste Dropper : Jump Up : Lock Closed : Light Duty : Lock Open : Laundry Tub : Liquefied Petroleum Gas : Medium Duty : Manhole : Non Return Valve : Overflow Pit : Overflow Relief Gully : Pressure Limiting Valve : Polythene : Pulse Outlet Meter Assembly : Pressure Relief Valve : Pressure Reduction Valve : Polyvinyl Chloride : Pump Well + Refrigerated Drinking Fountain : Reduced Level —_ PREM ANON : Sage. Reduced Pressure Zone Device : Relief Vent Retaining Wall Refrigerated Water Cooler Stop Cock Sunshine Coast Regional Council Single Check Valve Spoon Drain Spoon Drain Outlet Sewer Shower Sealed Junction Sink Surface Level : Sewer Manhole Surcharge Pit ‘ Subsoil Drain Stack Safe Tray Stormwater Drain Stormwater Manhole Safe Waste Drain Trench Grate Temporary Bench Mark Tundish Trapped Tundish Test Gate Thermostatic Mixing Valve Top of Grate Trade Waste Stack Trade Waste Vent Pipe Tempering Valve Unless Noted Otherwise Unplasticised Polyvinyl Chloride Up Stream Invert Level Vent Pipe Vacuum Break Valve Vent Cowl Vented Double Check Valve Water Closet Wash Down Hose Cock Water Meter Wash Trough 40 50 100mm 05.08.19 | DD | ISSUED FOR D&C TENDER 19.07.19 | SD [ISSUED FOR PRELIMINARY REVIEW DATE [ svce | DESCRIPTION [rev No. | AUTH. ARCHITECT \ BUILDING DESIGNER CLIENT GYMPIE TERRACE NOOSAVILLE PTY LTD HYDRAULIC CONSULTANT MRP HYDRAULIC & FIRE SERVICES CONSULTANTS PTY LTD m BRISBANE A smm7 BSA: 1137134 Unit 1/63 Annerley Rd, Woolloongabba, QLD PO Box 8143, Woolloongabba, QLD, 4102 (07) 3846 4379 (07) 5443 1136 [email protected] mrp.com.au ABN: 23 126 270 326 ci SUNSHINE COAST QBCC: 1137134 VERIFIED BY: | DATE DESIGNER SIMON LYNCH | DATE JUNE 2019 PROJECT DESCRIPTION & ADDRESS INFINITY RESIDENTIAL DEVELOPMENT - THREE APARTMENTS 217-219 GYMPIE TERRACE, NOOSAVILLE, QLD Lot 1 on RP66483 & Lot 1 on RP70165 HYDRAULIC SERVICE SHEET DESCRIPTION COVER SHEET HYDRAULIC SERVICES ISSUED FOR TENDER NOT FOR CONSTRUCTION SCALE PROJECT NUMBER 19-0441 NTS ‘SHEET SIZE At SHEET NUMBER H-101 REVISION NUMBER 02 Omm 3 Ww Ei 400mm
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
19-0441_H-101 - 02 - Cover Sheet.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.