Council archive · source document
Final Engineering services report _62 Lake Macdonald Drive · OPW25/0057
Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
The engineering risks include:
• The unknowns regarding the final extent of contaminated material on site and the exact quantity which will
require off-site disposal. This factor can have significant impacts on the cost of construction.
• Connecting to existing Unitywater infrastructure requires crossing existing services. The depth of existing
water, electrical and communications services are assumed only and must be located (vacuum excavation
potholing) prior to construction which can affect the proposed design.
Please contact this office should further information be required.
62 Lake Macdonald Drive, Cooroy – Engineering Services Report Page 11
233467 | M24-1037Rpt – Issue A – April 2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Final Engineering services report _62 Lake Macdonald Drive.pdfRelated documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.