Final Engineering services report _62 Lake Macdonald Drive · OPW25/0057
Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 20, section 1. The text section number identifies this passage in the reader.
Flood Hazard Assessment
Intersection of Lake Macdonald Dr and Dianella Crt
FIGURES
Figure 1 - 50% AEP design discharge comparison................................................................................... 7
Figure 2 - 10% AEP design discharge comparison................................................................................... 8
Figure 3 - 2% AEP design discharge comparison..................................................................................... 8
Figure 4 - 1% AEP design discharge comparison..................................................................................... 8
Figure 5 - 1% AEP (2100) design discharge comparison ......................................................................... 9
Figure 6 - 0.2% AEP design discharge comparison.................................................................................. 9
Figure 7 - General flood hazard curves ................................................................................................. 11
Figure 8 - Duration of inundation Reference Point 1............................................................................ 13
Figure 9 - Duration of inundation Reference Point 2............................................................................ 13
Figure 10 - Sensitivity analysis +/- 25% Manning's n 2% AEP at Reference Pt A .................................. 17
Figure 11 - Sensitivity analysis +/- 25% Manning's n 1% AEP at Reference Pt A .................................. 18
Figure 12 - Sensitivity analysis +/- 25% Manning's n 0.2% AEP at Reference Pt A ............................... 18
Figure 13 - Sensitivity analysis 25% culvert blockage for 10% AEP at Reference Pt A ......................... 19
Figure 14 - Sensitivity analysis 50% culvert blockage for 2% AEP at Reference Pt A............................ 20
Figure 15 - Sensitivity analysis 50% culvert blockage for 1% AEP at Reference Pt A............................ 20
Figure 16 - Sensitivity analysis 50% culvert blockage for 0.2% AEP at Reference Pt A ........................ 21
ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Final Engineering services report _62 Lake Macdonald Drive.pdfRelated documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.