Flood Hazard Assessment
Intersection of Lake Macdonald Dr and Dianella Crt
4.3 Model Roughness
The observed land uses for the 2D model surface for the existing catchment condition is shown in
Map 3.
The corresponding Manning’s n surface roughness values for each surface type are presented in
Table 4-1.
Table 4-1 Flood model surface roughness
Catchment Surface Assumed
Manning’s n
Openspace 0.08
Residential 0.12
Rural residential 0.06
Waterway 0.12
Roads 0.015
4.4 Validation
Design discharge hydrographs were exported from the local high-resolution flood model results
immediately upstream of the intersection and compared to design discharges extracted from the
Cooroy Creek flood model.
Design discharge hydrographs show good consistency across all flood events. Refer to Figure 1 to
Figure 6.
Figure 1 - 50% AEP design discharge comparison
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Final Engineering services report _62 Lake Macdonald Drive.pdfRelated documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.