Council archive · source document
Final Engineering services report _62 Lake Macdonald Drive · OPW25/0057
Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 45, section 1. The text section number identifies this passage in the reader.
Flood Hazard Assessment
Intersection of Lake Macdonald Dr and Dianella Crt
8 SUMMARY OF FINDINGS
Detailed flood modelling of the catchment and subject intersection has demonstrated the capacity
of the existing culverts provides 10% AEP design flood immunity to the intersection. For larger and
rarer flood events of less than 2% AEP the model results show the intersection will experience water
over the road to depths of less 0.3 m for a 1% AEP flood event for relatively short durations of less
than 1.5 hours.
The flood modelling has also demonstrated that should a significant blockage of the culverts occur
during a major rainfall flood event the depths of inundation across the culvert would not be
expected to significantly change, however, the inundation may persist for longer periods.
23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Final Engineering services report _62 Lake Macdonald Drive.pdfRelated documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.